HomeMy WebLinkAbout2001 03-06 CC JT MINBook 83/Page 56
3/6/01
MINUTES OF THE JOINT ADJOURNED REGULAR MEETING OF
THE CITY COUNCIL AND COMMUNITY DEVELOPMENT
COMMISSION OF THE CITY OF NATIONAL CITY,
CALIFORNIA
March 6, 2001
The Joint Adjourned Regular Meeting of the City Council of the City Of
National City and the Community Development Commission (CDC) of the
City of National City was called to order at 1:00 p.m. by Mayor Waters.
ROLL CALL
City Council and CDC Board Members present: Beauchamp, Inzunza,
Morrison, Soto, Waters.
Administrative officials present: Campbell, Dalla, Davis, DeFratis,
Desrochers, DiCerchio, Eiser, Kimble, Kirkpatrick, Martinez, McCabe,
Myers, Morse, Post, Ruiz, Trees.
Others Present: City Treasurer George Hood.
1. CITY FINANCIAL FORECASTING DATA
City Manager Tom McCabe reviewed the City Budget process and
the Five-year Capital Improvement Program (CIP) Long Range List
of Projects FY 2000-2001 (Exhibit A) and referenced the list that was
distributed to the Council, of additional items not currently included
in the CIP (entitled `Possible Future Significant Capital Improvement
Projects with No Identified Funding Source') (See Exhibit B,
attached).
Mr. McCabe then introduced Finance Director Marylou Matienzo,
who gave a slide presentation, provided handouts (See Exhibit C,
attached), and responded to questions.
Anne Campbell, City Librarian, answered questions regarding the
status of the State Bond money earmarked for libraries.
Book 83/Page 57
3/6/01
Community Development Commission Director Paul Desrochers
reviewed and summarized the recent CDC Bond Refinancing
Workshop and the resulting consensus of the CDC Board to establish
priorities for the proposed additional 10 million in funding which
included, among others, complete of the Education Village and
National City Blvd., work on 8th St and Highland Ave., and
redevelopment of the FEDCO site.
(Member Inzunza left at 1:40 p.m. and returned at 1:51 p.m.)
Ted Godshalk, 2143 Cleveland Ave., suggested that the City consider
the need to consolidate the existing Public Works facility to one side
of Paradise Creek.
Motion by Soto, seconded by Waters, to refer the list back to the staff
to work with the Grant Consultant to seek grants with a time line in
mind. The motion was clarified and amended to, include the desire to
prioritizing and rank the list including the consequences of 'no
action' or 'no project' and bring it back before May 1st. Carried by
unanimous vote.
Motion by Waters, seconded by Soto, to adjourn the City Council to
the next Regular City Council Meeting, March 6, 2001 at 3 p.m.
Carried by unanimous vote.
The City Council Meeting adjourned at 2:12 p.m.
Book 83/Page 58
3/6/01
The foregoing minutes were approved at the Regular Meeting of March 27,
2001.
.L Ge/,
MAYOR
CITY OF NATIONAL CITY
ALL CITY COUNCIL MEETINGS ARE TAPE-RECORDED. YOU MAY
LISTEN TO THE TAPES IN THE CITY CLERK'S OFFICE. COPIES OF THE
TAPES MAY BE PURCHASED FROM THE CITY CLERK.
EXHIBIT A
March 1, 2000
CAPITAL IMPROVEMENT PROGRAM
LONG RANGE UST OF PROJECTS
FY 2000-2001
BEAUTIFICATION
Landscape enhancement various freeway exits/entrances
Continuation of neighborhood improvement program
Provide entry signs at key locations
Highland Avenue streetscape improvements
Restoration of marsh areas
Billboard abatement
Landscape 8th Street south side, east of Harbison
LIBRARY
Construct new City library
Fire loss prevention project
Porta kiosk library
PARKS
Light the two remaining unlit tennis courts at El Toyon
Replace lighting at El Toyon athletic field
Replace lighting at Las Palmas athletic field
Replace and add lighting system at Kimball Park athletic fields
Acquire property near 15th and "B" for new recreation center per Kimball Park Master Plan
Acquire property at 16th and C for park expansion per Kimball Park Master Plan
Develop Bayfront access and interpretive trails adjacent to Paradise Marsh
1
PUBLIC BUILDINGS AND FACILITIES
Replace swim pool filter system
Off-street parking lot assessment projects at various locations
Preservation of designated historical buildings
Upgrade computer capabilities for all City departments
Equipment parking shed, Public Works compound
Install exhaust system in garage
PUBLIC SAFETY
Fire Department
Construct fire station in the northeast quadrant of the City -
Disaster Preparedness
Remodel the Emergency Operations Center
Establish a fully functional Emergency Operations Center at the Public Works Facility
Update the Emergency Operation Center radio communications equipment
Purchase data management system for the Emergency Operations Center
PUBLIC TRANSIT
Extension of Trolley along Route 54 to Plaza Bonita
Bus turn -around at 8th Street trolley station
PUBLIC UTILITIES
Continue undergrounding of overhead utility wires
SEWERS
Sewer main rehabilitation and extensions Various locations
STORM DRAINS
Correction of flooding conditions in vicinity of 18th Street and National City Boulevard
Channelize drainage east of Plaza Bonita
Shell Avenue/Thelma Way storm drain(s)
Construct concrete cross gutters at various locations
Drainage improvement underground - Harbison, 20th to 24th
Underground drainage - Tidelands area to north city boundary
Storm drain for Division between Harbison and Euclid
Underground Paradise Creek at Honeysuckle Lane
STREETS
Cul-de-sac Olive between 8th Street and Plaza Boulevard
Continue to rehabilitate streets as necessary
Division St./I-5 interchange redesign
Continue Division Street widening program to offset impacts caused by loss of Freeway 252
Reconstruct Harbor Drive
Accomplish neighborhood street improvements
Improve Civic Center Drive/I-5.interchange
Improve 24th St./I-5 interchange
New Caltrans and City signage for Mile of Cars Way/Marina
Cul-de-sac selected neighborhood streets
L/N Avenue, Plaza to 14th - study feasibility of obtaining right-of-way and widening roadway
Improve 8th Street and Plaza Boulevard freeway connections
Widen Plaza Boulevard from "N" Avenue to east City limit
3
Widen Sweetwater Rd. east of Plaza Bonita
Construct 17th Street between Lanoitan and Rachael
TRAFFIC CONTROL
Traffic signal coordination
Provide signage for bicycle routes
4
EXHIBIT B
Possible Future Significant Capital Improvement
Projects (CIPs) with No Identified Funding Source
(See also attached Long Range CIP List)
1. Library: renovation or new
construction
2. Library: If we build new, then
rehabilitation of existing library
for altemative uses
3. New Fire Station
4, Fire Headquarters Offices:
new or, tenant improvements
at a different location
5. Disposition of El Toyon
Recreation Center
6. Swimming Pool Master Plan
implementation
7.- Police 800MHz radio system
replacement
8. Police firing range clean-up
and rehabilitation
9. - New utility undergrounding
projects
10. New street & alley resurfacing
projects
11. Fire truck replacement
12. Skateboard park(s)
13. Soccer field
14. "Boxing Club"/Community
athletic proposal(s)
15. Phase III Seismic
Rehabilitation Of City Hall
16. Phases II & III of Civic Center
Landscape
17. Completion of re -roof @
Public Works Shop
18. Re -paving of Public Works
Yard
19. Energy management @ Civic
Center
011501FutureClP.doc
2/21/01
Possible Future Constraints on
General Fund Operations (Increases
in expenses)
1. Full funding of Equipment
Replacement Reserve
2. Employee compensation
changes including change in
minimum wage and binding
arbitration
3. Mandatory SSI coverage
(long range)
4. Debt service payments on
Fuller Ford site
5. Increased funding level for
General Fund Contingency
Reserve
6. Energy & motor fuel price
increases
7. Incentive payments for new
grants program
8. Local hard -match
requirements for new grants
program
9. NPDES Storm Water
Monitoring Requirements
10. Possible introduction of a
paramedic first responder
program
11. Possible annexation of
Lincoln Acres
Probable Constraints on General
Fund Revenue (Decreases in
revenue)
1. Economic
slowdown/recession
2. Wards closure
3. FEDCO closure
4. State "Fiscal Reform" and
changes from situs sales tax
(long range)
5. Impact of continued State
revenue takings (see
attachment)
011501 FutureClP.doc
2/21/01
CITY
A
AGER
OI JAH 16 PH 2: 4+9
Revenue Item 1` C E V E D,
4t: 1;a:w:1."•1_ CITY
STATE CONTINUING LOSSES
ESTIMATED REVENUE LOSSES
DUE TO STATE BUDGET ACTIONS
1981 -2001
Liquor license fees
Highway carriers uniform business tax
Financial aid to local agencies
Business inventory property tax relief -reduction
Business inventory property tax relief -repeal
Cigarette tax shift to State
Booking fees
Property tax administration charges
Fines and forfeitures-50% reduction
Fines and forfeitures -shift to counties
Cigarette taxes-47% shift to State
Property tax -shift to State
Trailer coach in -lieu -shift to State
Cigarette tax -shift to State
Net property tax shift
Sub -total
STATE ONE-TIME LOSSES
"tin VLF-1981-82
t in VLF-1982-83
Cut in VLF-1983-84
Supplemental subventions
TOTALS
Initial Continuing 00/01
-FY Initial Year Annual Cumulative
Authorizing Legislation Effective CPI Loss Loss Loss
SB102, Chapter 101, 1981
SB102, Chapter 101,1981
SB102, Chapter 101,1981
AB 223, Chapter 323,1983
SE 794, Chapter 447, 1984
SB 899, Chapter 467, 1990
SB 2557, Chapter 466, 1990
SB 2557, Chapter 466, 1990
AB 1297, Chapter 90, 1991
AB 1297, Chapter 90, 1991
SB 21, Chapter 331, 1991
SB617andSB844,1992
SB 617 and SB 844,1992
SB 617 and SB 844,1992
SB 1135 and AB 1519
SB102, Chapter 101,1981
SB 1326, Chapter 327, 1982
SB 223, Chapter 323, 1983
AB 160, Chapter 449, 1990
81/82 272.4 $31,987 $60,230 $931,890
81/82 272.4 $11,414 $21,490 $332,530
81/82 272.4 $115,785 $218,010 S3,373,180
83/84 298.4 $33,210 $57,080 $820,710
84/85 311.1 $59,504 $98,100 S1,353,410
90/91 400.9 S12,814 316,390 $160,500
90/91 400.9 $421,000 $538,620 $5,274,010
90/91 400.9 $27,290 $34,910 $341,850
91/92 413.0 $167,234 $207,690 $1,871,270
91/92 413.0 $81,879 $101,680 $916,200
91/92 413.0 S56,760 S70,490 $635,120
92/93 425.2 $244,644 $295,100 $2,421,290
92/93. 4252 $2,823 $3,410 $27,940
92/93 425.2 $64,006 $77,210 $633,480
93/94 425.2 3281,000. $338,960 $2,500,130
$2,139,370 $21,593,510
81/82 272.4 $315,000 $593,110
82/83 289.1 $478,000 $848,030
83/84 298.4 $604,000 $1,038,180
90/91 400.9 $68,000 $87,000
Notes:
Continuing and cumulative losses have been adjusted to reflect 2001 dollars using U.S. CPI.
Excludes revenue losses applicable to Redevelopment Agency.
Excludes additional shifts for FY 1993-94 estimated by Legislative Analyst as follows:
Property tax cut
One-time shift from Transportation Planning & Development Account
Extension of 1/2 cent Sales Tax
Net FY 1993-94 tax shift
82,139,370 $24,159,830
$328,000
($155,000)
(S52,000)
$121,000
Proposed Capital Improvement Program for Fiscal Year 2000-01: Summary
Category
Protect
Funding
Category
Total
Maintenance
Phase 1- Re -roof Public Works Shop
Replace Heavy Equipment Lift
Public Works
Hazardous Waste Storage Area
Civic Center Emergency Generator
City Buildings
Fire Station #15-Replace Carpet
Civic Center Seismic Upgrade
Fire Fighting Equipment
Sanitary Sewers
Sewer System Maintenance
Valencia Park Trunk
5117,000
• $ 40,000
c a 77,000
$ 65,000
c $ 15,000
c $ 50,000
• $ 7,000
c $ 450,000
S 50,000
S 700,000
S 160,000
Parks & Recreation
Tennis & Basketball Courts S 30,000
Park Fencing 5 5,000
Park Fumlture c $ 6,000
Replace Kimball Rec. Ctr. Power Panel Cabinet o S 10,000
Replace Kimball Park Power Panel Cabinet o $ 5,000
Community Center Floor Tile Replacement c $ 6,500
Replace Drinking Fountains c S 8,000
Misc. Bathroom Fixture Replacement c .5 10,000
Senior Center - Paint c $ 5,000
Kimball Park Restroom Fadlties S 130,000
Parking Lot Rehabilitation S 130,000
Paint El Toyon Park East Restrooms (a) o S 5,000
Paint El Toyon Park West ReShwno (a) c S 5,000
Soccer Field Development (a) c $ 75,000
Transportation
Resurface Streets S 850,000
Slut' Seal & Street Maint. S 150,000
Replace Sheet Signs S 15,000
Install Pedesterian Ramps S 100,000
Reinstallation of Sheet Lights S 100,000
Curb, Gutter & Sidewalk S 50,000
Paradise Valley Road Improvement S 240,000
Electric Meter Box o $ 20,000
Alley Improvements c $ 50,000
Highland Ave. Resurfacing $ 293,000
Traffic Control
Signal Interconnect - Highiandl8th
Traffic Signal Interconnection
Traffic Monitoring System
Plaza Blvd. Widening
Flood Control
NPDES Stonnwater Permit
Misc. Storm Drain Work
Technology
Mobil Data Computing
Back-up UNIX Server
Networking Equip. - PW Fiber Line
Voice/Data Fiber to 8th•Street
Card Access System -Phase 2
S 50,000
S 765,000
$ 15,000
S 70,900
S 25,000
S 50,000
S 438,618
G $ 45,500
o $ 25,000
c $ 30,000
G $ 30,000
5507,000
$ 860,000
S 430,500
$ 1,868,000
5900,000
575,000
S 569,118
Total Investment In Capital improvements
S 5,391,618
JJ()TF: Projects noted by a "G" and shown with budgets in MaI1cs are funded by one of several General Fund
Restricted Revenue Sources. Projects shown with an "(a)" were added by the City Council on 6-9-00.
City of National City
626/00 00-01CounctClPSmmaiy - City Manager's Office
EXHIBIT C
City of National City
General Fund
5 Year Business Plan
Fiscal Years 2001 to 2006
PURPOSE
• Set the stage for the CIP discussion &
Preliminary Budget for FY 2001-02
• Evaluate anticipated revenues and projected
expenditures
Assess long-term financial impact of
obligations, policies, programs, assumptions
ECONOMY
• State of the economy changed considerably
due to energy crisis
• California's economy too complex to
predict due to the uncertainties
• San Diego's economy no longer driven by
one industry but dependent on consumer
and business spending unlike National
City's high dependence on sales tax
General Assumptions
• The national economy in great fluctuation
& difficult to assess
• National City is largely built out with
additional income hard tocome by
• Inflation is projected at 2.5% for the first
two years and 3% for remaining years
• Continued maintenance of contingency
reserves
Per Capita Sales Tax Revenue (1999)
Vita
Chula Vista
Santee
Coronado
Oceanside
Imperial Beach
Solana
Lemon Grov
Poway
Encinitas
San Diego
Carlsbad
National City
Escondido
La Mesa
El Cajon
San Marcos
each
$0
$5,000 $10,000 $15,000
Per Capita Sales Tax
$20,000
$25,000
Per Capita Property Tax Revenue (1997-1998)
Encinitas
Solana Beach
Carlsbad
San Diego
Oceanside
Poway
Santee
Imperial Beach
Chula Vista
x Vista
La Mesa
Lemon Grove
Escondido
Cajon
National City
San Marcos
Del
Coronado
Isar
$0.00
$50.00
$100.00
$150.00
Per Capita Property Tax
$200.00
$250.00
$300.00
Revenue Assumptions
• Booking Fee State reimbursement to continue
• No additional ERAF return is projected
• Sales Tax Revenue to increase 5% for the first two years,
3% for remaining years
• Motor Vehicle -In -lieu Taxes to increase 5% each year.
State to backfill tax reduction
• Property Taxes to remain at 2%
• All Other Taxes to follow inflationary rates
• Franchise Fees to increase 2% per year
• Supplemental Funding from Grants and Other Funds
CITY OF NATIONAL CITY
GENERAL FUND 5 YEAR BUSINESS PLAN
FISCAL YEARS 2001 TO 2005
REVENUE PROJECTIONS
FINANCING SOURCE
2000-01
BUDGETED
%
CHANGE
2001-02
PROJECTED
%
CHANGE
2002-03
PROJECTED
%
CHANGE
2003-04
PROJECTED
°l0
CHANGE
2004-05
PROJECTED
PROPERTY TAXES
1,922,455
2%
1,981,090
2%
2,020,712
2%
2,061,126
2%
2,102,349
SALES TAXES
12,372,091
5%
12,990,696
5%
13,640,230
3%
14,049,437
3%
14,470,920
MOTOR VEHICLE IN LIEU
2,906,337
5%
3,051,654
5%
3,204,237
5%
3,364,448
5%
3,532,671
TRANSIENT LODGING TAX
850,000
2.5%
871,250
2.5%
893,031
3%
919,822
3%
947,417
FRANCHISE TAXES
953,112
2%
972,174
2%
991,618
2%
1,011,450
2%
1,031,679
BUSINESS LICENSE TAX
545,900
2.5%
559,548
2.5%
573,536
3%
590,742
3%
608,465
RESIDENTIAL RENTAL FEE
130,000
2.5%
133,250
2.5%
136,581
3%
140,679
3%
144,899
INVESTMENT EARNINGS
1,870,000
6%
1,982,200
6%
2,101,132
.6%
2,227,200
6%
2,360,832
OTHER REVENUES
1,498,701
2.5%
1,536,169
2.5%
1,574,573
3%
1,621,810
3%
1,670,464
_ , _--_
-
-
...-R wnn
.or
n-cifee 74A
AD7_
9R RRQ RQR
.a70
.aio
0
NOTES:
1. 2000-01 PROJECTED IS BASED ON THE CITY'S FINAL ADOPTED BUDGET
2. AN AVERAGE 4.5% INCREASE IS PROJECTED FROM 2001 TO 2003
3. AN AVERAGE 4% IS PROJECTED FROM 2004 TO 2005 BASED ON SOURCE DATA AVAILABLE AND
ECONOMIC FORECASTING PROVIDED.
4. NO ONE-TIME STATE RELIEF INCLUDED
Expenditure Assumptions
• Personal Costs adjusted for merit steps & existing
MOU's
• Approved positions in FY 2001 as basis
• Maintenance & Operation at. 2% per year
• Capital Outlay same as FY 2001
• CIP FY 2001 on approved projects
• No bond debt service or local match for
Fire/Library
• Internal Charges at 2% per year
CITY OF NATIONAL CITY
GENERAL FUND 5 YEAR BUSINESS PLAN
FISCAL YEARS 2001 TO 2005
EXPENDITURE PROJECTIONS
EXPENDITURE
CATEGORY
2000-01
BUDGETED
070
CHANGE
2001-02
PROJECTED
%
CHANGE
2002453
PROJECTED
%
CHANGE
2003-04
PROJECTED
%
CHANGE
2004-05
PROJECTED
PERSONAL SERVICES
15,802,006
5%
16,592,106
5070
17,421,712
5%
18,292,797
5%
19,207,437
MAINTENANCE & OPERATION
2,778,213
2%
2,833,777
2%
2,890,453
2%
2,948,262
2%
3,007,227
CAPITAL OUTLAY
21,000
0%
21,000
0%
21,000
0%
21,000
Q%
21,000
CIP
25,000
0%
25,000
0%
25,000
0%
25,000
0%
30,000
INTERNAL CHARGES
4,437,518
2%
4,526,268
2%
4,616,794
2%
4,709,130
2%
4,803,313
27,068,977
FUND TOTAL 23,063,737 4% 23,998,151 4% 24,974,959 47o 25,996,189 4%
NOTES:
1. 2000-01 PROJECTED IS BASED ON THE CITY'S FINAL ADOPTED BUDGET
2. INCREASE OF 4% IS PROJECTED FROM 2001T0 2005
3. PERSONAL COSTS BASED ON MERIT STEPS & EXISTING MOU'S
4. NO BOND DEBT SERVICE FOR FIRE STATION/LIBRARY
5. PERCENTAGE USED BASED ON SOURCE DATA AVAILABLE AND ECONOMIC FORECASTING PROVIDED
CITY OF NATIONAL CITY
GENERAL FUND 5 YEAR BUSINESS PLAN
FISCAL YEARS 2000 TO 2005
OPERATING TRANSFERS PROJECTIONS
EXPENDITURE
CATEGORY
2000-01
BUDGETED
%
CHANGE
2001-02
PROJECTED
%
CHANGE
2002-03
PROJECTED
%
CHANGE
2003-04
PROJECTED
%
CHANGE
2004-05
PROJECTED
IKANSFEKS IO GF FROM:
GAS TAX
700,000
700,000
700,000
700,000
700,000
OTHER FUNDS
316,423
300,000
300,000
300,000
300,000
TRANSFERS FROM GF TO:
LIBRARY FUND
(685,312)
5%
(719,578)
5%
(755,556)
5%
(793,334)
5%
(833,001)
PARK MAINTENANCE FUND
(258,183)
5%
(271,092)
5%
(284,647)
5%
(298,879)
5%
(313,823)
llf.
TAT nn+rw
COT_
I ) '7 P 1
56/
1146.8241
0
0
NOTES:
1. 2000-01 PROJECTED IS BASED ON THE CITY'S ADOPTED BUDGET
2. PERSONAL COSTS BASED ON MERIT STEP AND EXISTING MOU'S
CITY OF NATIONAL CITY
GENERAL FUND 5 YEAR BUSINESS PLAN
FISCAL YEARS 2001 TO 2005
COPS EXPENDITURE ABSORBED BY GENERAL FUND
EXPENDITURE
CATEGORY
2000-01
BUDGETED
2001-02
PROJECTED
2002-03
PROJECTED
2003-04
PROJECTED
2004-05
PROJECTED
PERSONAL COSTS
Sr. Police Officer (2)
111,685
117,269
123,133
129,289
135,754
Police Officers (5)
310,902
360,475
378,499
397,424
417,295
FUND TOTAL 422,587 47T,744 501,632 526,713
553,049
NOTES:
1. PERSONAL COST BASED ON MERIT STEP & EXISI1NG MOU'S
CITY OF NATIONAL CITY
GENERAL FUND 5 YEAR BUSINESS PLAN
FISCAL YEARS 2000 TO 2005
FUND BALANCE ANALYSIS
YEAR
FUND BALANCE
BEGINNING
ESTIMATED
REVENUES
PROJECTED
EXPENDITURES
INTERFUND
TRANSFERS
FUND BALANCE
ENDING
2000-01
86,030
23,048,596
23,063,737
72,928
143,817
2001-02
143,817
24,078,031
23,998,151
9,330
233,027
2002-03
233,027
25,135,650
24,974,959
(40,203)
353,515
2003-04
353,515
25,986,714
25,996,189
(92,213)
251,827
2004-05
251,827
26,869,696
27,068,977
(146,824)
(94,278)
NOTES:
1. 2000-01 AMOUNTS ARE BASED ON THE CITY'S ADOPTED BUDGET
2. ESTIMATED REVENUES AND PROJECTED EXPENDITURES FROM 2001-2005 ARE BASED ON GENERAL ECONOMIC
FORECAST, SOURCE DATA, CIP PLAN, ANTICIPATED MERIT STEPS AND EXISTING MOU'S.
CITY OF NATIONAL CITY
GENERAL FUND 5 YEAR BUSINESS PLAN
FISCAL YEARS 2001 TO 2005
SALARIES & BENEFITS CHARGES TO OTHER FUNDS
EXPENDITURE
CATEGORY
2000-01
BUDGETED
2001-02
PROJECTED
2002-03
PROJECTED
2003-04
PROJECTED
2004-05
PROJECTED
Sr. Office Assistant (P/T) CDC
22,466
23,589
24,769
26,007
27,308
Accountant (F/T) CDBG
28,257
29,700
31,153
32,711
34,347
City Attomey (F/T) CDC
48,046
50,448
52,970
55,619
58,400
Sr.Asst.City Attomey(F/T) CDC
36,878
38,722
40,658
42,691
44,825
Police Officer (F/T) Judge Grant
54,802
57,542
60,419
63,440
66,612
Police Officer (F/T)NCSD
23,557
24,735
25,972
27,270
28,634
Police Officers (F/T)SSDC
83,522
87,698
92,083
96,687
101,522
Police Officer (F/1) HIDTA
74,954
78,702
82,637
86,768
91,107
Police Officers(F/T) STOP
149,907
157,402
165,272
173,536
182,213
Office Coordinator (F/T) STOP
44,142
46,349
48,667
51,099
53,655
Police Officer (F/T) COPS III
24,214
25,425
26,695
28,030
29,432
Alarm Program Coord(F/T)SAR
35,946
37,743
39,630
41,612
43,693
Pers Training Asst(F/T)CDC
39,475
41,449
43,521
45,697
47,982
Maintenance Worker(F/T)CDBG
40,187
42,196
44,306
46,521
48,848
Housing Inspector(F/T)CDBG
29,138
30,595
32,124
33,731
35,41/
Asst. CM Engineer(F/T)PropA
73,407
77,077
80,931
84,978
89,227
Sr. Office Assistant (F/T)PropA
35,946
37,743
39,630
41,612
43,693
Street Sweeper (F/T)Refuse
47,728
50,114
52,620
55,251
58,013
Office Aides (P/T)State Library '
19,280
20,244
21,256
22,319
23,435
Librarian (PIT) State Library
22,730
23,867
25,060
26,313
27,628
Sr. Library Tech(P/T) LSDC
4,667
4,900
- 5,145
5,403
5,673
Office Aides (P/T)LSDC
9,769
10,257
10,770
11,309
11,874
Lit./Computer Coord(F/T)CDBG
44,873
47,117
49,472
51,946
54,543
Lifeguards (P/T)Swim.Pool Fund
22,717
23,853
25,045
26,298
27,613
Rec.Specialist(P/T) CDBG
22,926
24,072
25,276
26,540
27,867
Lifeguards(P/T) CDBG
26,748
28,085
29,490
30,964
32,512
FUND TOTAL 1,043,816 1,096,035 1 T50,802 1,208 345
1,268,765
SUMMARY RESULTS
• A Balanced Budget
• Revenues to match Expenditures
• Prudent Reserves to be maintained