MINUTES OF THE ADJOURNED REGULAR MEETING OF THE
CITY COUNCIL OF THE CITY OF NATIONAL CITY,
CALIFORNIA
SEPTEMBER 4, 2001
The Adjourned Regular Meeting of the City Council of the City of National
City was called to order at 3:15 p.m. by Mayor Waters.
ROLL CALL
Councilmembers present: Beauchamp, Inzunza, Morrison, Soto, Waters.
Administrative officials present: Campbell, Dalla, Eiser, Matienzo,
McCabe, Morse, Myers, Post, Ruiz, Trees.
National City Public Library Building Project
City Librarian Anne Campbell introduced Beverley Simmons from
Beverley Simmons and Associates Library Management Consultants. Also
introduced was Architect Alan Oshima. Ms. Simmons stated that after
reviewing existing library programs and services as well as current and
future needs, it was her opinion that a facility of 56,000 sq. feet would be
required to adequately serve the library needs of National City.
Mr. Oshima gave a slide presentation (Exhibit A, attached) outlining the
deficiencies in the existing library; suggested three possible building
options to remedy the deficiencies; and compared the building and
construction costs of each option.
Librarian Anne Campbell reviewed the status of the voter approved State
Library Bond Measure, Proposition 14. Funding from the bond measure
will be awarded on a competitive basis and will pay for 65% of the cost of a
library. The local jurisdiction is responsible for the remainder. The value
of the land used for a library facility counts toward the local contribution.
The remainder of the local match could come from a voter approved library
bond, if that was agreeable to the City Council.
EXHIBIT "A"
LIBRARY BUILDING PROJECT
Beverley Simmons and Associates
Library Management Consultants
1
NATIONAL CITY PUBLIC LIBRARY
ValIV S6MawrllH3
W
��n
List of Deficiencies
COLLECTIONS
4 SPACE LIMITATIONS
4 SHELVES TOO HIGH
4 NO DISPLAY AREA
List of Deficiencies
SEATING
4 INADEQUATE QUANTITY
4 NO INDIVIDUAL OR GROUP STUDY
List of Deficiencies
STAFF AREAS
4 LACK OF WORKSPACE
4 LACK OF STORAGE
List of Deficiencies
TECHNOLOGY
4 INADEQUATE SPACE FOR
Personal Workspace
Technology Equipment
Storage
List of Deficiencies
MEETING ROOM
4 LACK OF PROGRAM SPACE
4 INADEQUATE SIZE FOR LARGE GROUPS
List of Deficiencies
LOCAL HISTORY
4 LACK OF STORAGE
THREE
BUILDING OPTIONS
OPTION #1
Existing 26,000 square foot Library
plus
30,000 square foot Expansion with Parking
OPTION #2
Teardown existing Library
Build 1 and 2 story 56,000 sf Library with Parking
OPTION #3
Building new 56,000 sf Library on new site
BUILDING OPTION #1
Kimball Park
E. 12th Street
sting
rks and Rec.
uilding
Community
Center
13
BUILDING OPTION #2
E. 12th Street
BUILDING OPTION #3
W. 14th Stree
28000 s.f.: Library
22,000 s.f.: Parking
Et4Qg t64iidscape
Patio
4 '000 s.f.: Total Site
Existing
Ball Field
COMPARISON OF BUILDING
AND COSTS
Option
Remodel
Existing
Expansion
New
Construction
Construction
Costs
#1 OUT
#1 UP
#2
#3
26,000 s.f.
26,000 s.f.
30,000 s.f.
30,000 s.f.
56,000 s.f.
56,000 s.f.
$11.5 Million
$13.5 Million
$13.0 Million
$12.85 Million
Detail Construction Cost Information
OPTION #1 OUT
Site - 56 parking stalls $ 150,000.
Demolition 650,000.
Remodel existing Building (26,000 sf) 2,300,000.
New Addition (30,000 sf @ $280 per sf) 8,400,000.
TOTAL $11,500,000.
*Plus Cost of Relocation for 1+yr•
Detail Construction Cost Information
OPTION #1 UP
Site - 56 parking stalls $ 150,000.
Demolition including haz mat abatement 1,560,000.
Remodel existing Building (26,000 sf) 3,390,000.
New Addition (30,000 sf @ $280 per sf) 8,400,000.
TOTAL $13,500,000.
*Plus cost of Relocation for 1+yr
18
Detail Construction Cost Information
OPTION #2
Site - 56 parking stalls $ 150,000.
Demolition including haz mat abatement 500,000.
New Library (56,000 sf @ $220.50 per sf) 12,350,000.
TOTAL $13,000,000.
*Plus cost of Relocation for 1+yr.
19
Detail Construction Cost Information
OPTION #3
Site - 56 parking stalls, utilities, landscape $ 500,000.
New Library (56,000 sf @ $220.50 per sf) 12,350,000.
TOTAL $12,850,000.
Summary
OPTION #1
4 UNKNOWN FACTORS
Hazardous Materials
Handicap (ADA) Upgrades
Parking Expansion.
4 EXPANSION OUT
Minor structural and energy upgrades
Space for additional stairs
Design opportunities limited.
4 EXPANSION UP
Total structural and energy upgrade
More staffing required
Space for stairs and elevator
Design opportunities limited
• DOWNTIME
21
Summary
OPTION #2
4 UNKNOWN FACTORS
Hazardous Materials
Handicap (ADA) Upgrades
Parking Expansion
4 DOWNTIME
4 RELOCATION COSTS
4 ELIMINATE FUTURE USE OF BUILDING
Summary
OPTION #3
4 LEVEL SITE
4 ADAPTIVE REUSE OF EXISTING LIBRARY
4 OPPORTUNITIES FOR APPROPRIATE DESIGN
4 RECOMMENDED BUILDING OPTION
LIBRARY BUILDING PROJECT
Beverley Simmons and Associates
Library Management Consultants
24
BUILDING OPTION #1
Kimball Park
Existing
Parks and Rec.
LL Building
Community
Center
E. 12th Street
1. Existing Library
2. 2 Story OUT
Expansion
3. 1 Story UP over
Existing Library
4. Parking Expansion
Limited
25
BUILDING OPTION #2
12th Street
1. Demolish Library
2. New 2 Story
Library
3. New 1 Story
Library
4. Parking
26
W. 14th Stree
W 15th Street
BUILDING OPTION #3
28,000 s.f.: Library
22,000 s.f.: Parking
34,000 s.f.: Landscape
and Patio
Existing Tot„Lot
84,000 s.f.: Total Site
1. New Site
+/- 1.93 Acres
(+/- 84,000 sf)
2. New 2 Story Library
3. New Parking Lot
56 Spaces
4. Patio
27