9/16/03
MINUTES OF THE ADJOURNED REGULAR MEETING OF THE
CITY COUNCIL OF THE CITY OF NATIONAL CITY,
CALIFORNIA
September 16, 2003
The Adjourned Regular Meeting of the City Council of the City of National
City was called to order at 2:06 p.m. by Mayor Nick Inzunza.
ROLL CALL
Councilmembers present: Morrison, Natividad, Parra, Ungab, Inzunza.
Administrative officials present: Campbell, Condon, Dalla, Eiser, Hyland,
Kirkpatrick, Matienzo, Morse.
Other Officials present: Mr. De Dios from Kinsell, Newcomb and De Dios
Inc.
FINANCING: Main Fire Station (See attached discussion outline and
charts: Exhibit A)
A brief presentation was made on the architectural approach being pursued
for the new fire station. There was discussion about the costs and
implications of ADA compliance for the entire Fire Station facility.
Funding issues and sources of revenue for the Fire Station project as well as
other projects in addition to the Fire Station were discussed. The funding
gap for the Fire Station, what it is, when it needs to be filled, and potential
sources and actions required to accomplish that objective were reviewed.
Staff recommended that a layered approach be explored to fill the funding
gap; that at a minimum there should be a plan to issue a note, use
Redevelopment reserves or reactivate the California Infrastructure Bank
Loan; and that a final workshop be scheduled to choose the funding vehicle
to fill the gap and determine interest in securing new long-term financing
beyond the immediate gap.
Book 85/Page 216B
9/16/03
The consensus of the Council was to pursue a short term solution to fill the
gap for the Fire Station, the new Library and the old Library; to keep the
long-term financing solution in mind for other needs and to schedule a
second workshop to make a final decision. There was no vote.
ADJOURNMENT
The meeting was adjourned to the Regular Meeting of the City Council to be
held on September 16, 2003, at 6:00 p.m., Council Chambers, Civic Center.
The meeting closed at 3:15 p.m.
u/01, 4
CITY ERK
The foregoing minutes were approved at the Regular Meeting of October 21,
2003.
CITY OF NATIONAL CITY
ALL CITY COUNCIL MEETINGS ARE TAPE-RECORDED. YOU MAY
LISTEN TO THE TAPES IN THE CITY CLERK'S OFFICE. COPIES OF THE
TAPES MAY BE PURCHASED FROM THE CITY CLERK.
EXHIBIT A
Fire Station (and maybe other) Funding Needs
Goal: review background today; decision at next Workshop
1. Brief discussion of architectural approach (sketches)
2. Two flows of cash:
a. One Necessary - immediate (Fire "Gap") &
b. Two Suggested - long term (other stuff)
3. Potential projects beyond Fire (Chart A)
4. What is the Fire "Gap" (Chart B)
5. RDA "disclaimer" O
6. Local available funding vehicles — City & CDC (Chart C) and
bonding capacity (Charts D & E)
7. Some guiding assumptions:
a. Redevelopment is our economic engine
b. Redevelopment funds cannot be raided
c. Not advisable for City to incur new debt (Chart F)
8. Timing for flows of cash
a. Current market
b. Gap must be filled by 12-30-03 (out to bid on Fire Station)
9. Explore a layered financing approach to fill the Gap (Charts G & H)
10. Tentative recommendation going into a second Workshop
a. At a minimum, plan to issue a note or use Redevelopment
reserves or reactivate "C.I.B." application to fund the Gap.
b. Schedule a final Workshop on the Gap soon (in 2 weeks?)
c. Return then and decide upon:
i. Choose the financing vehicle to fund the Gap
ii. Determine if there is interest in securing new long-term
financing beyond the immediate Gap
1. If there is Council interest, then give Staff some
preferences for potential projects & Staff can
return with information on projects and financing
vehicles
file: 091603FireAgenda.doc
9/15/2003
Quick List of Potential Capital Projects
Requiring Long Term Financing (no order)
(Old ideas, new ideas, some may already be done or have become
obsolete; some may have had their scope changed)
A. Fire station (Gap)
B. Library — any residual needs including: public art, FF&E, books,
theft detection, etc.
C. City Hall remodel, landscape & seismic (probably can't pass RDA law
tests)
D. Skateboard Park?
E. Green the City - Neighborhood signing & streetscape program
F. Bus stop improvements
G. Aquatics Center
H. Arts Center
I. Filipino Village
J. Highland Avenue
K. CIP — Long Range List of Projects (Chart I)
L. 2001 List of Significant Future CIPs (Chart J)
M. Transit Oriented Development (housing)
N. High density/high rise residential (on the Boulevard & elsewhere)
O. From CDC 2001 bond financing discussion:
a. Education Center
b. Parking Structure
c. FEDCO Redevelopment
d. National City Blvd.
e. Marina Excavation
f. Highland Avenue Beautification
g. 8th Street Beautification
h. Store Front Loan/Grant
i. New Town homes West Side
j. Additional Land Purchases
P. Others...
file: 091603Fir6Agenda.doc
9/15/2003
The "Gap"
Fire Station Design and Construction Costs
Design fees: $655,000
Construction Cost: $7,745,000
Temporary Facilities $50,000
FFE $250,000
Const. Management $260,000
Special Inspection: $35,000
Security/Card Access $125,000
Fiber Optic $100,000
Contingency $250,000
Public Art $77,450
Total: $9,547,450
Available Funding Identified and Encumbered
HUD Section 108 Loan $6,900,000
Prior Year CDBG Allocation $202,500
Total $7,102,500
Fire Station Funding Gap $2,444,950
file: 091603FireAgenda.doc
9/15/2003
CITY OF NATIONAL CITY
Schedule of Financing Mechanisms
Description
Uses of Funds
Lease Revenue Bonds /
Certificates of Participation
Lease between City and
Authority secures bonds —
lease payments are subject to
annual appropriation
Special Tax
Bonds
Special tax levied on taxable
property secures the bonds —
tax is not ad valorem, but is
based on Rate & Method
General Obligation
Bonds
Ad valorem tax approved in
election secures the bonds
Sources of Repayment
Voter Approval
Key Aspects
Variety of public facilities,
including general
improvements
Any governmental facility the
legislative body is authorized
to construct
Uses approved under election
General Fund is source of
annual appropriations —
covenant to budget
Special taxes levied annually
by the County at the direction
of the City
Ad valorem taxes levied
annually by the County
Not required
Yes — 2/3 of voters within
district
Time to Execute
• Flexibility to finance a
number of projects
• Need to have existing
repayment capacity
• Annual review and approval
of levy, subject to maximum
tax authorized
• Taxes are first lien on
property and have right of
foreclosure
• Authorization limit
10 to 12 weeks
180 to 360 days
Yes — 2/3 of qualified voters
within City
• Authorization limit allows
for planning as property
values increase
. General purpose financing
tool, subject to ballot
language
. County assumes risk on
delinquencies
180 to 240 days
* Alternatively, the City, or any other corporate or related body, could issue short term notes to provide interim financing for projects.
** The California Infrastructure Bank may provide 20 to 25 year loans at favorable interest rates.
0
CITY OF NATIONAL CITY
Financing Capacity
Undesignated surplus in the General Fund (FY03 Budget) $545 618
Divide by: Coverage factor (times) 1.20x
Multiply by: Revenue cap rate (times) 16.0x
Par amount of bonds available $7,274,907
COMMUNITY DEVELOPMENT COMMISSION
OF THE
CITY OF NATIONAL CITY
Financing Capacity
Projected gross tax increment for FY2004 $7,643,000
Less: Housing set -aside and pass -through agreements (2,809,500
)
Less: Agency administrative allocation (500,000)
Less: Debt service and reimbursement agreements (2,084,000
)
Total — T/I available for bonding $2,249,500
Divide by: Coverage factor (times) 1.20x
Multiply by: Revenue cap rate (times) 15.5x
Par amount of bonds available $29,056,000
f BOOTMPPrehmtnary &.abet
CITY OF NATIONAL CITY
BUDGET ANALYSIS, BY FUND • ALL FUNDS, PRELIMINARY BUDGET P—ag.e
FISCAL YEAR 2003-04
Fund Fund
Balances Projected Projected Inter.Fund Balances
Fund Fund Title 06i30/03 Revenues Expenditures Transfers 06/30/04
001 General Fund 1.054.033 27,279,895 27.247.706 (540.604) 545,618
103 General Capital Outlay Fund 0 240,000 240,000 0 D
104 Library Fund 0 407,800 1,327,498 919.698 0
105 Parks Maintenance Fund 0 458,000 858,466 400.466 0
108 Library Capita Outlay 255,261 79,000 45,000 0 289,261
•• Gas Taxes Fund 266.595 1,200,000 470,000 (700,000) 296.595
110 Erne Preparedness Fund 15,00C 0 15,000 0
ill POST Fund 0 0 0 0
113 Cultural Arts Fund • 95,000
95.000
5/29/038:39 PM
Suggested Layered Financing — Two Parts
LAYER 1 - Do this because:
• the cost of money is inexpensive
• there is a policy decision to use CDC as the underlying and, if needed, primary funding source
• it does not hit CDC reserves at one time if a C.I.B. loan is forthcoming
• this Layer addresses the only critical issue; the Fire Gap
Details — Need to do to fill the Gap:
1. Reactivate (if practical) a previous C.I.B. loan application and seek approx. $3M. Rate will be about 3.25%, 20-
year term; 90-day approval process; repaid by the City.
2. If C.I.B. says no or is late in approving, CDC reserves must move into 1st position to fill the Fire Gap.
3. If C.I.B. loan goes through, execute a lease reimbursement agreement with CDC (chart)
LAYER 2 — Could do this IN ADDITION to Laver 1 because:
• it is back-up if C.I.B. fails
• we want increased project capacity for short-term needs ($5M in Layer 2 vs. $3M in Layer 1 and, potentially $8M if done
together)
• still economical vs. a conventional bond at normal rates around 5.25%
Details — Could add this layer to Layer 1:
1. City's Public Financing Authority (Police Station Project) issues a short-term Note for approx. $5M. Rate will be
about 3.25%, 5-year term; 60-day issuance process; perhaps $100k in fees for issuance; repaid by City.
2. Once Note goes through, execute a lease reimbursement agreement with CDC (same chart)
file: 091603FireAgenda.doc
9/15/2003
-Investors -
Certificates
of
Participation
(COP)
or Loan
_)
-City
$3/5M
in Debt
Obligation /
file: 091603FireAgenda.doc
Lease Reimbursement Model
City's
General Fund
9/15/2003
RDA Lease
Reimbursement
Agreement w/City
for portion of Fire
Station
(similar to Police Station)
CAPITAL IMPROVEMENT PROGRAM
LONG RANGE LIST OF PROJECTS
FY 2003-2004
BEAUTIFICATION
Landscape enhancement various freeway exits/entrances
Provide entry signs at key locations
Billboard abatement
Landscape 8th Street south side, east of Harbison
LIBRARY
Once new library is built, rehabilitate existing for alternative uses
PARKS
Soccer field
Disposition of El Toyon Recreation Center
Skateboard park (s)
Replace lighting at El Toyon athletic field
Replace lighting at Las Palmas athletic field
Replace and add lighting system at Kimball Park athletic fields
Acquire property near 15th and "B" for new recreation center per Kimball Park Master Plan
Acquire property at 16th and C for park expansion per Kimball Park Master Plan
Develop Bayfront access and interpretive trails adjacent to Paradise Marsh
PUBLIC BUILDINGS AND FACILITIES
Energy management at Civic Center
Rehabilitate Public Works asphalt yard
Phase II and III of Civic Center Landscape
Swimming pool master plan implementation "`
Replace swim pool filter system
Off-street parking lot assessment projects at various locations
Preservation of designated historical buildings
Upgrade computer capabilities for all City departments
Completion of Public Works shop re -roof
Equipment parking shed, Public Works compound
Install exhaust system in garage
Continue with expansion of integrated access control/fire/security system
PUBLIC SAFETY
Replace City radio network with San Diego County Regional Communications System Network.
Construct fire station in northeast quadrant of the City
Relocate the primary Emergency Operations Center
Establish a secondary Emergency Operations Center
Provide electronic data management system for Emergency Operations centers
PUBLIC TRANSIT
Bus turn -around at 8th Street trolley station
PUBLIC UTILITIES
Continue undergrounding of overhead utility wires
SEWERS
Sewer main rehabilitation and extensions. Various locations
STORM DRAINS
Correction of flooding conditions in vicinity of 18th Street and National City Boulevard
Construct concrete cross gutters at various locations
Drainage improvement underground - Harbison, 20th to 24th
2
L
4
L
0-1
Storm drain for Division between Harbison and Euclid
Underground Paradise Creek at Honeysuckle Lane
Complete capacity portion of the Storm Sewer Master Plan
STREETS
Cul-de-sac Olive between 8th Street and Plaza Boulevard
Continue to rehabilitate streets and alleys as necessary
Division St./I-5 interchange redesign
Continue Division Street widening program to offset impacts caused by loss of Freeway 252
Reconstruct Harbor Drive
Accomplish neighborhood street improvements
Improve Civic Center Drive/I-5 interchange
Improve Bay Marina Way/I-5 interchange
Cul-de-sac selected neighborhood streets
L/N Avenue, Plaza to 14th - study feasibility of obtaining right-of-way and widening roadway
Improve 8th Street and Plaza Boulevard freeway connections
Extend N Avenue from Plaza Boulevard to 8th Street
Construct 17th Street between Lanoitan and Rachael
TRAFFIC CONTROL
Continue traffic signal coordination
Provide signage for bicycle routes
3
National City - Possible Future Significant Capital Improvement Protects
City of National
City Manager's Office.,
Project Title
Motivation
for Project
Lead
Dept.
project Description
Why Needed?
When
Needed?
Approx.
Cost
Funding
Possibilities
CDBG
Eligible?
A
Library: renovation or
new construction
Quality of
Life
LibraryPublic
Construction of a new
Library or
significant renovation of
the current facility.
City staff
s proposed project.
a proposed work
2001. (See bottom
recently built
unknown
o gather •
Staff
plan and
of
San Diego
unknown
State bond funding
No funds identified
Yes
Yes2
A Library consultant Is currently working"with
information for the planning phase of th
expects to have a final report Including
cost estimates completed by the end of
page 3 for general information about two
area public libraries.)
Reuse of facility
B
Library: rehabilitation
of existin library for
g ry
alternative uses
Quality of
Life
Public
Works
Renovation of current
Library building for
alternative uses If new
Library is built.
C
Swimming Pool
Master Plan
Implementation
Quality of
Life
Parks and
Recreation
Renovate swimming
pool and bathhouse,
add a waterside, and
add an entry kiosk.
Facility is forty years old and is showing
chronic signs of its age. This project
would implement some or all of
consultant's recent findings.
Within 2-3 yrs
$2 million
National Park
Service (Urban Park
and Recreation
Recovery Program
grant) and CA Prop.
12 (Parks Bond)
Yes
D
New utility
undergrounding
projects
Quality of
Life
Public
Works
This project relocates
overhead utilities.
Underground utilities increase the
health, safety, and welfare of National
City residents.
On go1ng
project
Dependant
on scope
of project
Public Utilities
Commission Rule
21A
Yes
E
Skateboard park(s)
Quality of
Life
Parks and
Recreation
Develop 4 parks
Meet community desire
Within 1-2 yrs
$400,000
Private funding and
CA Prop 12 (Parks
Bond)
Yes
F
New street and alley
resurfacing projects
Quality of
Life
Public
Works
This project repairs or
replaces street and
alley pavement as
necessa ry•
Street work Is based upon the the City's
Pavement Management System. Alley
work is based upon observed need.
Ongoing
project
Dependant
on scope
of project
Proposition A
TransNet, Gas Tax
Possibly s
G
Soccer field(s)
Quality of
Life
Parks and
Recreation
Develop soccer field(s)
Meet community desire
Within 2-3 yrs
$100,000
$75,000 is
authorized in
General Fund under
Capital Facilites
Fund #303
Possibly"
H
"Boxing
Club"/Community
athletic proposal(s)
Quality of
Life
Parks and
Recreation
Develop boxing facility
Meet community desire
unknown
unknown
No funds identified
Yes
I State bond funding will provide 65% of total cost. Local match of 35% required.
2 Rehabilitation eligible for CDBG only If building Is used for community purpose, will not be eligible If reused for City office space.
9 CDBG may be used for new paving and major reconstruction, but may not be used for basic maintenance of existing Infrastructure.
CDBG cannot be used for equipment purchases for current athletic fields (goal posts, nets, etc...), but CDBG can be used for construction of new athletic fields.
19CIP.exe 5/02/01
Page 1
J
Project Title
Phases II & III of
Civic Center
Landscape
Fire Station
Replacement
National City - Possible Future Significant Capital Improvement Protects
Motivation Lead
for Project Dept. Project Description
Quality of Parks and
Life Recreation
Beautification and ADA
access changes to
Civic Center.
Construction of a new
18, 450 square foot fire
Safety Fire station to replace the
current facility located
at 333 East 16th Street.
K Police 800 MHz radio
system replacement Safety
L
Fire Truck
Replacement
Disposition of El
M Toyon Recreation
Center
Replace old radio
trunking system with
Regional
Police Communication System
for consistent
communication and
county wide support.
Replaces 15 year old
engine. Places 15 year
Safety Fire old engine in reserve
(back up) status for
projected 5 year period.
Safety
N Fire Administrative
Offices Efficiency
Parks and
Recreation
Fire
Demolition of building
t
Why Needed?
Needed to bring access up to ADA
standards, add signage to clearly direct
customers to their destination, general
upgrade of City Hall appearance.
Current facility is obsolete, does not
meet current operational requirements,
State and Nationally recognized health &
safety standards and has a space
deficiency of 65% based on Space
Needs Analysis completed November
1999.
Eliminate radio frequency dead areas, in
support of Police, Fire, City, and medical
services. Needed due to the age of
existing equipment and the additional
potential dead areas with the radio
interference from the Installation of new
cell phone transmitters.
To ensure reliable fleet of fire apparatus
as per Fire Apparatus Replacement
Schedule (15 Years first line/5 years
reserve)
City of National L.
City Manager's Office
When Approx. Funding CDBG
Needed? Cost Possibilities Eligible?
desired in
FY2001-02 or $774,471 No funds identified Nos
FY 2002-03
FY 2002-03
Unknown -
several years
Federal Fire Act;
California
$6.9 million Infrastructure and
Economic Yes
Development Bank
Loan; "Section 108"
$900,000
Cops More
(Technology) and
California Law
Enforcement
Equipment Program
(Available in 2002)
Not likely 6
CDBG 5 Year Lease
FY 2002-03 $280,000 Purchase $65,000-
$75,000 per year Yes
payment; Federal
Fire Act
Building has termites and is not feasible
o repair. Within 2-3 yrs $50,000
Provides 5,000 Square b
Feet of Office Space
New Fire Station Project was scaled
ack Summer 2000 eliminating Admin.
Office Spaces.
General landscaping is not eligible for CDBG, but construction costs Incurred to meet ADA requirements are CDBG eligible.
Unless protect Is part of community policing or other community Initiative this would not be eligible for CDBG.
19CIP.exe
FY 2002-03 $300,000-
$912,220
General fund &
CDBG
Loan from California
Infrastructure and
Economic
Development Bank
Yes
No
5/02/01
Page 2
National City - Possible Future Significant Capital Improvement Projects
City of National
City Manager's Office
0
P
Project Title
Re -roof at Public
Works Shop
Re -paving of Public
Works Yard
Energy management
at Civic Center
Motivation
for Project
Maintenance
Maintenance
Cost Savings
Lead
Dept. -
Public
Works
Public
Works
Public
Works
Project Description
Install new roof
Repave Public Works
Yard
The City, in partnership
with the California
Energy Commission,
performed a study of
possible upgrades for
the Civic Center HVAC
system which would
result in significant
energy savings.
Why Needed?
The Public Works Shop roof is leaking
thereby causing the potential for
damage to the building interior and
contents.
The pavement In the Public Works yard
is old, deteriorating rapidly, and in need
of repair. There is settling at the vehicle
entrances to the buildings which
potentially can cause damage to the
vehicles.
The California Energy Commission
study identified 7 major projects of
varying costs and payback periods. The
dollar amount shown at right would allow
all the projects to be done at the same
time.
General information on two recently built public libraries In the County of San Diego
In 2000, the City of Carlsbad opened the most recently constructed main library In San Diego County. Carlsbad's library, at 64,000 sq. ft., is larger than the library
anticipated for National City. In addition, the City of Carlsbad purchased a site at a cost of $3.8million, In 1995, the City of Chula Vista opened the South Chula Vista
Branch Library, funded by the 1987 State Bond. The library is 37,000 sq. ft. and wasconstructed for a total cost of $12,119,905.
The actual costs for these two buildings are as follows:
Carlsbad - Total Project Cost $22,000,000
When
Needed?
When
resources and
space needs
at Yard
become better
defined.
When
resources and
space needs
at Yard
become better
defined.
As soon as
possible
Approx.
Cost
$240,000
$170,000
$352,500
Funding
Possibilities
No funds identified
$50,000 is proposed
in the Fiscal Year 01-
02 CIP
The City has
received a $50,000
grant from the
California Energy
Commission and
$132,300 is
proposed in the
Fiscal Year 01-02
CIP, hi a
$170.2_ 00 with no
identifi ed f ndinc
source.
Const. Cost
Gross Sq Ft
Sq Ft Cost
Equipment Cost
Site Cost
Other Costs
$9,200,000
64,000
$143.75
$5,200,000
$3,800,000
$3,800,000
9CIP.exe
Chula Vista - Total Project Cost $12,119,905
Construction Cost
Gross Sq Ft
Sq Ft Cost
Equipment Cost
Site Cost
Other Costs
$5,053,479
37,000
$136.58
$2,069,234
$2,285,000
$2,712,192
CDBG
Eligible?
No
No
No
5/02/01
Page 3
Interest Rate Environment
Year
Maturity
"AAA"
Insured
National
City
«wr
Stand -
Alone
National
City
1
2004
1.10%
1.70%
3
2006
1.80%
2.25%
5
2008
2.50%
3.00%
10
2013
3.60%
4.15%
15
2018
4.25%
4.80%
20
2023
4.65%
5.15%
25
2028
4.70%
5.20%
30
2033
4.75%
5.25%
KINSELL, NEWCOMB
DE DIOS, INC.
INVESTMENT BANKING
7.00%
6.50%
6.00%
5.50%
National 30-Year "AAA" Insured GO Bond Rates - Last 10 Years