HomeMy WebLinkAbout2017 04-25 CC HA ADJ MINBook 99 / Page 77
04-25-2017
MINUTES OF THE ADJOURNED REGULAR MEETING OF THE
CITY COUNCIL AND COMMUNITY DEVELOPMENT COMMISSION
— HOUSING AUTHORITY OF THE CITY OF NATIONAL CITY
FISCAL YEAR 2018 BUDGET WORKSHOP
April 25, 2017
The Adjourned Regular Meeting of the City Council and Community Development
Commission — Housing Authority of the City of National City was called to order at
4:05 p.m. by Mayor / Chairman Ron Morrison.
ROLL CALL
Council / Board members present: Cano, Mendivil, Morrison, Rios.
Council / Board members absent: Sotelo-Solis.
Administrative Officials present: Dalla, Deese, Denham, Duong, Manganiello, Parra,
Pedone, Raulston, Roberts, Rodriguez, Stevenson, Vergara, Williams, Ybarra.
PLEDGE OF ALLEGIANCE TO THE FLAG
INTRODUCTION
City Manager, Leslie Deese, made the following introductory statement: "I am pleased to
present to the City Council a balanced city budget. Through the General Fund this was
achieved with use of a $3.8 million dollars of un-assigned fund balance. The proposed
budget recommends continuance of essential services and programs to our community,
facility and fleet upgrades, Capital Improvement Projects, and contractually obligated
salary and benefits to our employees. It also recommends that the City Council consider
pre -funding employee pension and retirees health care obligations and continues our
partnerships with our regional partners. The proposed budget does not include new
staffing. It is critical that we maintain a conservative budget position until new revenue
streams are identified. We are working with developers and businesses to bring current
proposals to fruition as well as identifying new opportunities to further enhance our
revenue stream. While the proposed budget attempts to provide something for everyone,
it does not provide all that is needed or all that has been requested by departments. We
are all doing more with less."
PRESENTATIONS
BUDGET FY 2017-2018 (206-1-33)
Staff Presentations were made by Assistant City Manager Stacey Stevenson, Finance
Director Mark Roberts, Budget Analyst Ed Prendell, and City Engineer Steve
Manganiello, on the below listed topics:
• General Fud Budget Summary
• Total Budget Summary
• Significant Budgetary Impacts
• Other Potential Impacts
• Capital Improvement Program
NOTE: All presentation materials are attached as Exhibit "A".
Book 991 Page 78
04-25-2017
PUBLIC COMMENTS - None
CITY COUNCIL COMMENTS AND DIRECTION
Councilmember Sotelo-Solis, requested that the following written comments be read into
the record in her absence: "I am in support of the following for the budget for the Fiscal
year of 2018: 1) Incorporation of the hiring freeze of the four positions; 2) Creation of a
pension trust, to help offset costs for pension spike; 3) Budgeting for our aquatic center
at $181,000, recognizing that we can potentially gain revenues for fee for services;
4) Using unassigned fund balance at $4.7 million dollars; 5) Continuing to support
Economic Development projects, the City's fee study, and housing revenues for future
forecasting."
There was discussion on the issue of pre -funding pension benefits, funding of $181,000
for the Aquatic Center and elimination of four vacant staff positions from the budget.
The consensus was to return with a fact sheet on the pros and cons of pre -funding for
pensions and retiree health benefits and to omit a specific funding amount for the Aquatic
Center until later in the process. There was no vote.
Motion by Cano, seconded by Mendivil, to reinstate the deleted positon in the Mayor's
Office. Motion carried by the following vote, to -wit: Ayes: Cano, Mendivil, Morrison.
Nays: Rios. Abstain: None. Absent: Sotelo-Solis.
ADJOURNMENT
Motion by Mendivil, seconded by Cano, to adjourn the meeting to the next Regular
Meeting of the City Council and Community Development Commission — Housing
Authority of the City of National City to be held Tuesday, May 2, 2017 at 6:00 p.m. at the
Council Chambers, National City, California. Carried by the following vote, to -wit: Ayes:
Cano, Mendivil, Morrison, Rios. Nays: None. Abstain: None. Absent: Sotelo-Solis.
The meeting closed at 6:21 p.m.
Cit Clerk
The foregoing minutes were approved at the Regular Meeting of December 5, 2017.
Mayor
M. II8IHX3
NsTioNAL
PRELIMINARY BUDGET
Fiscal Year 2018
April 25, 2017
1
Stacey Stevenson
Deputy City Manager
�+^ CAIIFOMNIA -
NATIONAL CITY
`- �lnCORPORIT:
Introduction
Budget workshop #3
• Budget priorities
• Unfunded needs
• Presentation of the preliminary budget for fiscal
year 2018
3
Introduction
Recent budget history
• Restaffing of critical vacancies
• Market salary adjustments
• Capital improvement program (CIP) projects
• Strategic use of fund balance
4
^^ CALIFORNIA -�
NATIONAL CITY
(/ ,,,�
L COiRpOIIA76D
Introduction
Budget preparation
• Departmental requests
• Analysis of spending and revenue patterns
• Refinements in budgeting methodology
5
Introduction
Key budget elements
• More conservative budget
• Refinement of revenue projections
• Overall decrease in General Fund Maintenance &
Operations costs
• Decrease in net C I P costs
• Significant reduction in anticipated salary savings
6
CALIFORNIA -
.-NATIONAL CITY
� 1s:31
�pCORPOR ATYO
Introduction
Key budget elements (continued)
• Increased personnel costs
No new positions
• Defunding of 4 vacant positions
• Negotiated increases
• Pension costs
7
*- CALIFORNIA -�
NATIONAL CITY
" COR,ORA'T
Introduction
Deficit Spending
• Projected expenses exceed projected revenues
• Use of fund balance
8
Introduction
Workshop Objective
• Council's input/direction on the key elements built
into the preliminary budget
• Council's direction on additional items not currently
in the budget
9
Mark Roberts
Director of Finance
General Fund
.A/1;.% -
NATIONAL CITE
INCOiPO1 ATID
Unassigned Fund Balance
Fund balance, 6/30/16
Projected use of fund bal., FY 17 mid-yr
Projected fund balance, 6/30/17
$12,166,730
(3,016,221)
$9,150,509
CALIFORNIA ^0
NATIONAL CITY
Isort
NCORPORATE
Preliminary Budget Summary
Fiscal Year 2018
Total Revenues
Transfers In
Operating Expenditures
Transfers Out
$53,008,200
255,500
(55,053,399)
(2,027,843)
Surplus/(Deficit) ($ 3,817,542)
13
NATIONATp
Projected Change in Unassigned
Fund Balance —Fiscal Year 2018
Projected fund balance, 6/30/17 $ 9,150,509
Estimated use of fund bal., FY18 preliminary budget (3,817,542)
Estimated fund balance, 6/30/18 $ 5,332,967
14
^-' CALIFORNIA
NATIONAL CITY
�pCOtPOgATYfl
Revenues
FY 18 Preliminary vs FY 17 Adopted
FY 18 FY 17
Preliminary Adopted Change
Sales Tax $18,627,564 $17,851,000 $ 776,564
Proposition D / District Tax 11,507,650 10,877,000 630,650
Property Tax 2,089,761 2,130, 570 (40, 809)
Property Tax in Lieu of VLF 6,220,229 5,902,223 318,006
Other Revenue 14,562,996 $11,005,913 3,557,083
Total $53,008,200 $47,766,706 $5,241,494
* Includes $2M reimbursement from WI-TOD developer for Paradise Creek Park Remediation project.
15
Revenues
Fiscal Year 2018
Estimated Revenues - $53.01 M
Other Revenue
27%
Property Tax in
Lieu of VLF
12%
Proposition D /
District Tax
22%
Property Tax
4%
* Does not include Transfers In.
Sales Tax
35%
16
4^ CALIFORNIA ^b
NATIONAL CITY
=NCOePORNf=D
Expenditures
FY 18 Preliminary vs FY 17 Adopted
FY 18 FY 17
Preliminary Adopted Change
Personnel Services $37,227,027 $35,063,603 $ 2,163,424
Maintenance & Operations 6,483,098 6,643,312 (160,214)
Capital Outlay 136,706 252,777 (116,071)
Capital Improvement 3,200,000 1,900,000 1,300,000
Allocated Cost & Internal Chrgs 8,006,567 7,392,744 613,823
Total $55,053,399 $51,252,436 $3,800,963
* $2M total to be offset by reimbursement from WI-TOD developer for Paradise Creek Park Remediation project
17
NATIONAL CITY
Expenditures
Fiscal Year 2018
Estimated Expenditures by Category - $ 55.05 M*
Capital
Improvement
5.81%
Capital Outlay
0.25%
Maintenance &
Operations
11.78%
* Does not include Transfers Out.
Allocation Costs &
Internal Charges
14.54%
Personnel
Services
67.62%
18
CALIFORNIA -0
NATIONAL CITY
a.tss f s
Percentage of Expenditures by
Department —Fiscal Year 2018
Other
Depts
31.6%
20.3%
Police
48.1 %
Police
Fire
Other Depts
• City Council
• City Clerk
• City Treasurer
• City Manager
• City Attorney
• Community Services
• Engineering & Public Works
• Finance
• Housing & Economic Development
• Human Resources
• Neighborhood Services
• Planning
• Non -Departmental
19
NATIONAL CITY
+pCORPORATID
Transfers In
FY 18 Preliminary vs FY 17 Adopted
FY 18 FY 17
From To Purpose Preliminary Adopted Change
Plan Checking Revolving Fee General Fund Administrative Transfer $250,000 $0 $250,000
Mile of Cars LMD General Fund Administrative Transfer 5,500 5,500 0
Total (Net) General Fund Impact $255,500 $5,500 $250,000
20
�- CALIFORNIA ^►
NATIONAL CITp
�NCOIPOAAT�
Transfers Out
FY 18 Preliminary vs FY 17 Adopted
From To
General Fund Library Fund
General Fund Parks Maintenance Fund
General Fund Nutrition Center Fund
General Fund Personnel Comp Fund
Purpose
Operating Subsidy
Operating Subsidy
Operating Subsidy
Retiree Health Benefits
General Fund Housing Choice Voucher Fund Operating Subsidy
Total (Net) General Fund Impact
FY18 FY17
Preliminary Adopted Change
$784,992 $676,582 $108,410
615,669 629,182 (13,513)
440,832 388,426 52,406
186,350 160,000 26,350
0 96,005 (96,005)
$2,027,843 $1,950,195 $77,648
21
NATION car
Budget Summary
FY 18 Preliminary vs FY 17 Adopted
FY 18 FY 17
Preliminary Adopted Change
Total Revenues $53,008,200 $47,766,706 $5,241,494
Transfers In 255,500 5,500 250,000
Operating Expenditures (55,053,399) (51,252,436) (3,800,963)
Transfers Out (2,027,843) (1,950,195) (77,648)
Total ($ 3,817,542) ($ 5,435,925) ($1,612,884)
22
•w CALIFORNIA
NATIONAL CIZ'y
�- �HCORPOAAT�D
$65.0 -
$60.0 -
$55.0
$50.0
$45.0
0
2 $40.0
$35.0
$30.0
$25.0
$20.0
Revenues & Expenditures
Revenues Less District Tax iiRevenues w/ District Tax —Expenditures
$15.0 — — -
includes transfers in & out
23
Revenues & Expenditures
(excluding 1-times)
$65.0
$60.0
$50.0
$45.0 -
0
g $40.0
$35.0
$30.0 --
$5..0
$15.0
Nrb
includes transfers in & out
Revenues Less District Tax —Revenues wl District Tax Expenditures
MN I
ema
24
+^ CALIFORNIA -n
NATIONAL CITp
IJ COtPOIATIO
Projected Change in Unassigned
Fund Balance -Fiscal Year 2018
Fund Balance, 6/30/16
Projected Use of Fund Balance, FY17 Mid -Year
$12,166,730
(3,016,221)
Projected Fund Balance, 6/30/17
Estimated Use of Fund Balance, FY18 Preliminary Budget
$ 9,150,509
(3,817,542)
Estimated Fund Balance, 6/30/18
Deficit Spending, FY18 Preliminary Budget:
Estimated Use of Fund Balance
1-time Capital Spending (Non -Offset Expenses)
Estimated Structural Deficit
$ 5,332,967
$ 3,817,542
(1,336,706)
$ 2,480,836
25
Total Budget
CALIFORNIA
LEA i0NAL CJT
�pCOgPpt}TtD
Total Operating & Capital Budget
FY 18 Preliminary vs FY 17 Adopted
General Fund
Revenues
Transfers In
Expenditures
Transfers Out
Projected Fund Balance Change - General Fund
Other Funds
Revenues
Transfers In
Expenditures
Transfers Out
Projected Fund Balance Change - Other Funds
All Funds
Total Revenues
Total Expenditures
Projected Fund Balance Change - All Funds
Transfers In and Out for all funds equal (net) $0
FY 18
Preliminary
$53,008,200
255,500
(55,053,399)
(2,027,843)
($ 3,817,542)
FY 17
Adopted
$47,766,706
5,500
(51,252,436)
(1,950,195)
($ 5,430,425)
FY 18 FY 17
Preliminary Adopted
$36,991,903 $35,470,252
2,903,053 2,481,195
(41,067,542) (38,713,689)
(1,130,710) (536,500)
($ 2,303,296) ($ 1,298,742)
FY 18 FY 17
Preliminary Adopted
$90,000,103 $83,236,958
(96,120,940) (89,966,125)
($ 6,120,837) ($ 6,729,167)
Change
$5,241,494
250,000
(3,800,963)
(77,648)
($1,612,884)
Change
$1,521,651
421,858
(2,353,853)
(594,210)
($1,004,554)
Change
$6,763,145
(6,154,815)
$ 608,330
27
CALIFORNIA ^.
NATIONAL CITY
�NCOBPOAATI-
Preliminary Total Budget
Fiscal Year 2018
Estimated Expenditures by Fund - $96.12M
Library Fund
Gas Taxes Fund $2.01
$1.46
CDBG Fund
$0.89
HOME Fund
$0.93
Sewer Service Fund
$7.88
Internal Service Funds
S12.39
All Other Funds
$14.66
General Fund
$55.05
Nutrition
$0.84
28
NikTioNALmirr
Preliminary Total Budget
Fiscal Year 2018
Estimated Expenditures by Category - $96.12M
Capital Improvement
$3.40
Capital Outlay
$2.12
Allocation Costs &
Internal Charges
$11.99
Maintenance &
Operations
$33.09
Personnel Services
$45.51
29
Ed Prendell
Budget Analyst
NikuoNAL ciry
Significant Budget Changes
Preliminary Fiscal Year 2018
vs
Adopted Fiscal Year 2017
Significant Changes
General Fund
FY 18 Preliminary vs FY 17 Adopted
Personnel
Salaries
991,775
Pension contributions
1,171,649
Maintenance & Operations
Agency Contributions
(106,950)
Rentals & Leases
(99,800)
Training
94,334
Professional Services
64,640
32
Significant Changes
General Fund
FY 18 Preliminary vs FY 17 Adopted
Capital Outlay
Fire Equipment (defibrillators)
(93,254)
Capital Improvements
Paradise Creek Remediation (reimbursed)
2,000,000
Traffic Monitoring/System Improvements
550,000
Storm Drain Improvements
(300,000)
Internal Service Charges & Allocated Costs
Information System Maintenance Charge
288,315
Vehicle Lease Charge
219,303
33
CALIFORNIA -�
NATIONAL CITY
Significant Change Drivers
General Fund
Personnel increase ($2.2M)
• Salary increases
• Negotiated increases
• Normal (step) increases
• 3.0 Positions Frozen (FTEs)
• 1.0 Assistant City Manager (City Manager)
• 1.0 Senior Office Assistant (City Manager)
• 1.0 Plans Examiner (Fire/Buildings)
• Pension cost increases
34
�- CALIFORNIA -d
NATIONAL CITY
�NCoRPOEAT$O
Significant Change Drivers
General Fund
Maintenance & Operations decrease ($160k)
• Transfer of copier leases from the General Fund to
the Information Systems Maintenance Fund
• Increase in training
• Elimination of 1-time funding for the City-wide fee
study
• Consolidation of the Plan Check Revolving Fund
and the General Fund
35
Significant Change Drivers
General Fund
Capital Outlay decrease ($116k)
• Fire Equipment (defibrillators)
Capital Improvement Program increase ($1.3M)
• Increase for the addition of Paradise Creek Park
Remediation ($2M revenue offset)
• Increase to Traffic Monitoring / Safety
• Decrease of Drainage Improvements
36
+- CALIFORNIA -►
NATIONAL CM
n.�b.ra.kri�
Significant Change Drivers
General Fund
Internal Service Fund increase ($614k)
• Vehicle Lease Charge (13 vehicles)
• Information System Maintenance Charge (public
safety cameras & computer equipment)
37
Significant Changes
Non -General Fund
FY 18 Preliminary vs FY 17 Adopted
Personnel
Salaries
244,452
Maintenance & Operations
Sewage Transmission & Treatment
1,000,000
Housing Assistance Payments
568,000
Contract Services
300,000
Agency Contributions
263,958
Liability Claim Costs
250,000
Professional Services
(453,120)
R&M Buildings & Structures
(165,000)
8
•�• CALIFORNIA ^^
NATIONAL CITY
sss 1
NCORPoRRTRD
Significant Changes
Non -General Fund
FY 18 Preliminary vs FY 17 Adopted
Capital Outlay
Automotive Equipment
398,000
Capital Improvements
(325,000)
39
NATIONA I
t is �1
Significant Change Drivers
Non -General Fund
Personnel
• Salary increases
• Negotiated increases
• Normal (step) increases
• Pension cost increases
• Position eliminated (FTEs)
• 1.0 Housing Specialist (Housing & Economic
Development)
40
CALIFORNIA
NATIQNAL CIT]r
,:SSI
IRCORPORA'rgo '-
Significant Change Drivers
Non -General Fund
Maintenance & Operations
• Increase in sewage transmission & treatment rates
• Increase for Housing Assistance Payments
• Consolidation of Plan Check Revolving Fund with
the General Fund
Capital Outlay
• Purchase of 17 vehicles
Police Department (9), Public Works (7),
Neighborhood Services (1)
41
Significant Change Drivers
Non -General Fund
Capital Improvement Program
• Public safety cameras
42
CALIFORNIA -p
NATIONAL CITY
1s3
NCOaPORaT1
sD )
Staffing Levels
Fiscal Year 2018 Preliminary
Fiscal Year 2017 Adopted
Net Change
366.60
370.60
(4.00)
43
Vacancy Report
Budgeted Vacancies*
Unfunded Vacancies
11.00
52.75
Total Vacancies 63.75
* March 2017
Reserves / Fund Balances
General Fund
As of 6/30/16:
General Fund
Contingency Reserve $ 9,085,066
Facilities Maintenance Reserve 2,500,000
Unassigned Fund Balance 12,166,730
Total $23,751,796
*�^ CALIFORNIA ^^
NATIONAL CITY
- 1JJ1
�RCOAPOR 0.?�
Other Funds
As of 6/30/16:
Gas Taxes Fund Reserve
Sewer Service Fund Reserve
Liability Insurance Reserve
Workers' Compensation Reserve
Debt Service Reserve
Vehicle Replacement Reserve
$ 285, 600
$17,950,151
$ 1,481,000
$ 6, 647, 000
$ 1,058,434
$ 4, 883, 534
47
tOP
Other Potential Impacts
48
Other Potential Impacts
General Fund
Aquatic Center $ 181,000
Energy and water conservation project 172,265
Gas Taxes (Senate Bill 1) CIP contrib.* (348,962)
Finance refinements (45,000)
Pension and/or OPEB pre -funding 1,000,000
Total $ 959, 303
* Reduction of estimated General Fund contribution to CIF costs, if Senate Bill 1 is enacted.
49
Other Potential Impacts
Non -General Fund
Energy and water conservation project
Gas Taxes revenue (Senate Bill 1)
*
Gas Taxes (Senate Bill 1) CIP **
Vehicle Replacement Fund
Finance refinements
Total
* Additional revenue, if Senate Bill 1 is enacted.
** Increased expenses, if Senate Bill 1 is enacted.
$ 215,331
(419,962)
348,962
99,000
(19,000)
$ 224,331
50
M- CALIFORNIA ^4
NATIONAL CIT
Pension and/or OPEB Prefunding
Establish irrevocable supplemental pension and/or
other post -employment benefits (OPEB) trust(s)
$1 M (total) initial contribution
Allocation to be determined
51
C R
NATIONAL CITy
c--xc20MArs;
Update on National City's
Capital Improvement Program
and FY 2018 Funding
Recommendations
City Council Budget Workshop
April 25, 2017
Overview
Objective
• Evaluate, prioritize and identify funding options for the repair, replacement
and expansion of the City's physical infrastructure, facilities, parks and fleet
Process
• "Sliding" five-year budgeting process where the first year of five-year
program represents "approved" capital budget, which is incorporated into
City's annual budget
• Projects programmed for subsequent years are for planning purposes onl'
and do not receive expenditure authority
• City staff develop project proposals based on needs assessments,
community input, and adopted planning policies
• CIP Committee reviews project proposals and provides recommendations to
Planning Commission (PC) and City Council
• PC reviews new projects proposed for inclusion in the CIP for General Plan
Consistency prior to City Council approval and budget adoption - staff
presented the FY 2018 CIP to the PC on April 17, 2017; PC voted
unanimously to make a determination that all of the new projects proposed
for inclusion in the FY 2018 CIP are consistent with the General Plan.
57
Overview
CIP Categories
• Infrastructure - streets, sidewalks and pedestrian curb ramps for
Americans with Disabilities Act (ADA) compliance; street lights,
traffic signals and communications; sewer and storm water systems
• Facilities - City offices, public works yard and support facilities,
police and fire stations, community center, public library and
information technology (public safety cameras, data storage and
communications)
• Parks & Recreation - Community parks and amenities such as ball
fields, restrooms, lighting, landscaping, walking paths and
information technology; health and quality of life facilities such as
recreation centers, municipal swimming pool and aquatic center
• Vehicle Fleet - consists of 180 vehicles and heavy equipment,
valued at approximately $9 million; fleet management, replacement
and modernization is required to provide essential services for the
Community
Major Maintenance (Deferred and/or Ongoing)
• Capital improvement projects that provide major maintenance
and/or upgrades to existing infrastructure and/or facilities required
to provide essential public services and maintain health and safety
• Examples - roadway rehab, roof replacement, HVAC system
upgrades, removal and replacement of deteriorated metal storm
drain pipes
New Public Improvements
• Capital improvement projects that expand existing infrastructure
and/or facilities, or construct new facilities, to address present and
future needs of the Community
• Examples - new skate park, multi -purpose athletic field, municipal
swimming pool, aquatic center, community corridors
59
Overview
Project Prioritization
• Tier 1 - Annual/Ongoing Major Maintenance project
Tier 2 - Near -term project (next 1 to 5 years)
Tier 3 - Mid-term project (5 to 10 years)
• Tier 4 - Long-term project (10+ years)
Evaluation Criteria
• Health and safety
Community support
Project costs and schedule
• Available funding
er
Consistency with City General Plan and other Tong -range planning
documents
Ongoing maintenance costs
CIP Funding
• With support of the Community and City Council, staff
aggressively pursue Federal, State and Regional grants to
fund Capital Projects
• Other funding sources include: TransNet (Prop A), Gas Tax,
Sewer Service Fund, Capital Outlay, Development Impact
Fees (DIF) and General Fund
• Funding sources for Capital Projects often have restrictions
based on project scope and/or expenditure timelines
• Exploring funding options, including review of major
maintenance reserve policies, is essential to ensuring fiscal
sustainability
CIP Funding Options
"Pay as You Go"
• General Fund cannot support all capital needs
Major Maintenance Reserves take a long time to build-up
Heavily reliant on tax revenues and competitive grant awards
Fee Programs
• Development Impact Fees (DIFs)
Sewer Enterprise Fund
Energy Savings Loans & Rebate Programs
Energy Savings Contracts (ESCOs)
• Electric Vehicle Vouchers
Debt Issuance (Bonds)
• Ability to address major capital needs in a timely manner
• Variety of options
.1:7_ .i..,t:: V-7-11111111,7111MIEPn. .
FY 2015
CIP Projects Completed
Projects
Amount
8th St Smart Growth Revitalization (Trolley Station to Highland Ave)
$9,000,000
8th St Safety Enhancements (Highland Ave to Palm Ave)
$1,500,000
Coolidge Ave Safe Routes to School (18th St to Plaza Blvd)
$2,000,000
4th St Community Corridor (Roosevelt Ave to Harbison Ave)
$1,500,000
18th St Community Corridor (Phase I — Wilson Ave to "D" Ave)
$300,000
Drainage Improvements
$215,000
George H. Waters Nutrition Center Improvements
$160,000
Martin Luther King Jr Community Center Improvements
$50,000
Casa de Salud Manuel Portillo Youth Center Improvements
$30,000
WI-TOD Site Preparation
$3,280,000
Public Works Relocation
$5,000,000
Total
$23,035,000
63
FY 2015 CIP Projects Completed
St" St Smart Growth Revitalization
� (Trolley Station to Highland Ave)
FY 2015 CIP Projects Completed
8th St Safety Enhancements
(Highland Ave to Palm Ave)
IIIVY 2015 CIP Projects Completed
Coolidge Ave Safe Routes to School
(18th St to Plaza Blvd)
FY 2015 CIP Projects Con—"rreted
4th St Community Corridor
(Roosevelt Ave to Harbison Ave)
Bike Lane with Reverse Angle Parking
67
FY 2015 CIP Projects Completed
18t" St Community Corridor
(Phase I -Wilson Ave to "D" Ave)
Green Bike Box
Bike Lane
68
FY 2015 CIP Projects Complete
Drainage Improvements
Before
After
..._ 1 Aii.AL_L
filmi FY 2015 CIP Projects Completed
George H. Waters Nutrition Center Improvements
New Walk-in Freezer
FY 2015 CIP Projects Completed
Martin Luther King Jr Community Center
Improvements
Replaced two, 7.5 ton rooftop heat pump
units with economizers
71
rillirr
FY 2015 CIP Projects Completed
Casa de Salud Manuel Portillo Youth Center
Improvements
Before
FY 2015 CIP Projects Completed
WI-TOD Site Preparation
& Public Works Relocation
FY 2016
CIP Projects Completed
Projects
Amount
"A" Ave "Green" Street (8th St through Kimball Park to Paradise Creek)
$3,700,000
"D" Avenue Community Corridor, Roundabout and War Memorial
$2,600,000
Highland Ave Safety Enhancements (Division St to 8th St)
$1,900,000
Paradise Valley Rd Safe Routes to School (8th St to Plaza Blvd)
$350,000
National City Aquatic Center
$5,300,000
National City Public Library Improvements
$1,100,000
Unified Messaging System
$210,000
Total
$15,160,000
74
"A" Ave "Green" Street
(8th St through Kimball Park to Paradise Creek
FY 2016 CIP Projects Completed
"A" Ave "Green" Street
(8th St through Kimball Park to Paradise Creek)
Harvesting Rainwater
(La Recoleccidn de Agua de Lluvia)
KIMBALL PARK
Below Kimball Park there ;s d 10.000
gallon rainwater harvesting system. The
water is treated to be re used for
irrigation within the native plant garnen
you see before you today.
111111111t
Delwin do K,r,bali Park h.ry tin sistema de
recolecclbn de aguas piuviales de 30.000
galones. El agua es tratada Diva ser
reutilizada para rrego der•,lro de4 jardln d,
plantas nativas que ven ante ustedes Ivey.
Replenishing Groundwater
(La R.eposicic n de las Aguas `ubterrancas
Rainwater enters this rockscape area from
the street. After flowing through rocks,
water is allowed to flow into the ground,
removing pollutants and replenishing
the groundwater.
El aqua de Iluvia entra en esta area
rockscape desde la calle. Despues de fiver
i a travels de las rotas, se permite que el
aqua fluya en la tierra, la ehminacion de
los contaminantes y la reposia6n de las
aguas subterraneas.
Treating Runoff r n••d
?rara• = ngua de Drer:,,ie : au
FY 2016 CIP Projects Completed
"D" Ave & 12th St Roundabout & War Memorial
Fr FY 2016 CIP Projects Completed
"D" Ave & 12th St Roundabout & War Memoria
IN MEMORIAM
OF THE MEN OF
NATIONAL CITY
WHO MADE THE
SUPREME SACILIFIcE
FOR THEIR. COUNTRY
IN
WORLD WAR Il
1941 - 1945
NA I IONA L CITWL
- ERECTED
IN HONOR AND MEMORY
OF THE CMZEN5 01
NATIONAL CITY
WHO SERVED IN DM
ARMED FORcES
DURING
WORLD WAR- 11
190 -1945
War Memorial
Rededication Ceremony:
December 7, 2015
FY 2016 CIP Projects Completed
"D" Avenue Community Corridor
(Division St to 30t" St)
Class II Bike Lanes &
Pedestrian Crossing Enhancements
79
FY 2016 CIP Projects Complete
Paradise Valley Rd Safe Routes to School
(8th St to Plaza Blvd)
Before
After
81
FY 2016 CIP Projects Completed
National City Aquatic Center
8
FY 2016 CIP Projects Completed
National City Public Library Improvements
FY 2016 CIP Projects Completed
Unified Messaging System
Replaced outdated telephones at City facilities
with a modernized Unified Messaging System
FY 2017
CIP Projects Completed
Projects
Amount
Downtown-Westside Community Connections (Phases III & IV — Plaza Blvd
and 14th St between Coolidge Ave and "A" Ave)
$1,200,000
Plaza Blvd Widening (Phase I — "N" Ave to 1-805)
$4,800,000
Safe Routes to School Pedestrian and Bicycle Safety Enhancements
$600,000
Bicycle Parking Enhancements
$120,000
Kimball Park Improvements
$4,000,000
El Toyon Park Improvements
$1,000,000
Paradise Creek Educational Park Improvements
$980,000
Kimball Park Low -Impact Development and Paradise Creek Restoration
$2,400,000
Police Department Building Improvements
$2,000,000
Civic Center (City Hall) Improvements
$300,000
Fire Station 31 Improvements
$190,000
National City Municipal Pool Improvements
$160,000
Camacho Recreation Center Improvements
$120,000
CCTV Camera Video Storage Capacity Upgrades
$100,000
Total
$17,970,000
85
FY 2017 CIP Projects Completed
Downtown-Westside Community Connections
(Phases III & IV - Plaza Blvd and 14th St between
Coolidge Ave and "A" Ave)
• a:
II I I 11111.11
`11Wr- 111111=1111111111111
FY 2017 CIP Projects Completed
Plaza Blvd Widening
(Phase I - "N" Ave to 1-805)
0-
FY 2017 CIP Projects Completed
Safe Routes to School Pedestrian and Bicycle
Safety Enhancements
Pedestrian Crossing
Enhancements -
E E. 16th Street & Grove St
GR44G101 1U
Raised Crosswalk 1911
in front of
Granger Jr High School
88
FY 2017 CIP Projects Completed
Bicycle Parking Enhancements
Bike corral (functional art) on E. 12th Street
in front of ARTS Center
Y 2017 CIP Projects Completed
El Toyon Park Improvements
FY 2017 Cif Projects Completed
Paradise Creek Educational Park Improvements
FY 2017 CIP Projects Completed
Kimball Park Low -Impact Development and
Paradise Creek Restoration
After
Before
AZ
•
t/T:
i • •.ti..e.;";:;.•%-,.
94
FY 2017 CIP Projects Complete
Police Department Building Improvements
4
New Modular Shelving
for NCPD Property &
Evidence Room
obi
FY 2017 CIP Projects Completed
Civic Center (City Hall) Improvements
FY 2017 CIP Projects Completed
Fire Station 31 Improvements
FY 2017 CIP Projects Completed
National City Municipal Pool Improvements
FY 2017 CIP Projects Completed
Camacho Recreation Center Improvements
99
FY 2017 CIP Projects Completed
CCTV Camera Video Storage Capacity Upgrades
Upgraded closed-circuit television (CCTV) camera
video storage capacity to address system
expansion and data retention requirements
100
FY 2017 CIP Projects in Construction
Projects
Amount
18th St Community Corridor (Phase II — "D" Ave to Granger Ave)
$1,700,000
Division St Traffic Calming (Highland Ave to Euclid Ave)
$1,400,000
Westside Pedestrian and Bicycle Enhancements
$2,200,000
Wayfinding Signage
$1,100,000
Sewer Replacement & Upsizing
$3,500,000
Las Palmas & El Toyon Park Lighting Replacement
$1,000,000
ARTS Center Improvements (Roof Replacement)
$250,000
Fire Station 33 (Squad Pilot Program)
$360,000
Total
$11,510,000
101
FY 2017 CIP Projects in Design
Projects
Amount
30th St Bicycle Corridor ("D" Ave to N. 2nd Ave)
$1,300,000
Euclid Ave Bicycle Corridor (Cervantes Ave to E. 24th St)
$4,000,000
El Toyon- Las Palmas Bicycle Corridor
$2,000,000
Plaza Blvd Widening (Phase II — Highland Ave to "N" Avenue)
$4,000,000
Sweetwater Rd Safety Enhancements (Plaza Bonita Rd to Plaza Bonita Center
Way)
$1,300,000
Traffic Calming, Safe Routes to School and Pedestrian Crossing Enhancements
$1,600,000
Alley Improvements
$1,200,000
Drainage Improvements
$700,000
Traffic Signal Upgrades
$4,300,000
Paradise Creek Park*
$6,300,000
Fiber Optics Communications Infrastructure Expansion
$330,000
Public Safety Cameras
$250,000
Citywide Facilities Energy Savings Upgrades**
$5,470,000
Las Palmas & El Toyon Park Playground Equipment Replacement
$300,000
Cell Phone Repeater Upgrades
$75,000
* Includes site remediation, grading. infrastructure improvements, park amenities and roadway
reconstruction
** Capital investment will be reimbursed through energy savings
Total
$33,125,000
Historic and Cultural Assets
Transferred to the City after the CDC -RDA Dissolution
• Need to complete new Maintenance and Operating Agreements
(MOAs) with Community partners for the following sites:
• Kimball House & Museum (National City Historical Society)
• Historic Santa Fe Rail Depot (San Diego Electric Railway Association)
• Stein Family Farm (Stein Farm Family Trust)
O Maintenance and funding will be addressed in the MOAs
• Cost estimates are based on maintaining current operations
• Granger Music Hall
• Cost estimate for building restoration and potential relocation to the
Marina District is preliminary
• Comprehensive assessment is underway and will be completed by end o
FY 2017
Historic and Cultural Assets
Historic and Cultural Properties
Recommended Improvements*
Cost Estimate
Kimball House
Exterior painting (includes lead safe practices); replace windows (sash,
trim, panes and paint); repair doors and stairs; termite treatment; and
minor interior repairs
$200,000
Santa Fe Rail Depot
Exterior painting (includes lead safe practices); replace windows (sash,
trim, panes and paint); repair doors, trim, siding and gutter downspout;
termite treatment; and minor interior repairs
$200,000
Stein Family Farm
Site drainage; structural repairs to building foundations, barn and carport;
exterior painting (includes lead safe practices); replace windows (sash,
trim, panes and paint); porch repairs; replace facia boards and trim;
termite treatment; and minor interior repairs
$480,000
Granger Music Hall
Complete building restoration and potential relocation to the Marina
District
$3, 000, 000
Total
$3,880,000
* improvements are needed to restore and preserve the facilities to allow for continuation of current operations. Cost
estimate for Granger Music Hall is preliminary and considers complete building restoration and potential relocation to the
Marina District; a comprehensive assessment is underway and will be completed by the end of FY 2017.
"Competitive" Grant Awards
Grants
Amount
Smart Growth Incentive Program (SGIP) Grant — 8th St (Trolley Station to Highland Ave)
$2,000,000
Smart Growth Incentive Program (SGIP) Grant — Downtown-Westside Community Connections
$2,000,000
Smart Growth Incentive Program (SGIP) Grant — Westside Pedestrian & Bicycle Enhancements
$2,000,000
Smart Growth Incentive Program (SGIP) Grant— Downtown Specific Plan Update
$320,000
Smart Growth Incentive Program (SGIP) Grant — Wayfinding Signage Program
$825,000
San Diego Unified Port District CIP — Wayfinding Signage Program
$250,000
San Diego Unified Port District CIP — National City Aquatic Center
$4,633,110
Catalyst Grant — WI-TOD Project (Phase I)
$500,000
EPA Grants (2 Total) — WI-TOD Project (Phase I)
$400,000
Strategic Growth Council Affordable Housing and Sustainable Communities (AHSC) Program
Grant — WI-TOD (Phase II) Transportation Infrastructure
$930,271
Department of Housing and Community Development Housing -Related Parks Program (HRPP)
Grant — WI-TOD (Phase II) Community Park
$553,450
Prop 84 Storm Water Grant — "A" Ave "Green" Street (8th St through Kimball Park)
$2,500,000
Prop 84 Storm Water Grant — Kimball Park LID / Paradise Creek Restoration
$1,876,153
Prop 84 Urban Greening Grant — Paradise Creek Educational Park
$840,000
Prop 1 Storm Water Grant — Sweetwater River Park Bioretention
$1,344,425
Prop 1 Integrated Regional Water Management (IRWM) Grant — Paradise Creek Water Quality
and Community Enhancement (Paradise Valley Rd)
$365,000
CAL FIRE Urban & Community Forestry Greenhouse Gas Reduction Fund Grant — Urban Forest
Management Plan
$250,285
California Initiative to Reduce Carbon and Limit Emissions (CIRCLE) & Tree San Diego Grants
(2 Total) - Tree Planting (Community Parks & Open Space)
$30,000
105
"Competitive" Grant Awards
Grants
Amount
Highway Safety Improvement Program (HSIP) Grant — 8th St (Highland Ave to Palm Ave)
$900,000
Highway Safety Improvement Program (HSIP) Grant — Highland Ave (Division St to 8th St)
$900,000
Highway Safety Improvement Program (HSIP) Grant — 18th St ("D" Ave to Palm Ave)
$192,200
Highway Safety Improvement Program (HSIP) Grant — Sweetwater Rd (Plaza Bonita Rd to Plaza
Bonita Center Way)
$680,940
Highway Safety Improvement Program (HSIP) Grants (10 Total) — Traffic Signal Upgrades,
Lighting, Pedestrian / ADA Enhancements
$4,255,630
Safe Routes to School (SRTS) Grant — Coolidge Ave
$730,000
Safe Routes to School (SRTS) Grant — Roundabout at "D" Ave & 12th St
$500,000
Safe Routes to School (SRTS) Grant — 8th St ("D" Ave to Highland Ave)
$450,000
Safe Routes to School (SRTS) Grant — Paradise Valley Rd (8th St to Plaza Blvd)
$225,000
Safe Routes to School (SRTS) Grant — Citywide SRTS Education & Encouragement Program
$500,000
Active Transportation Program (ATP) Grant — 4th St (Roosevelt Ave to Harbison Ave)
$450,000
Active Transportation Program (ATP) Grant — "D" Ave (Division St to 30th St)
$600,000
Active Transportation Program (ATP) Grants (2 Total) — Citywide Bicycle Parking
$100,000
Active Transportation Program (ATP) Grants (9 Total) — ADA, Pedestrian & Bicycle
Enhancements (18th St, 30th St, Division St, Euclid Ave, 1-805 Bike Corridor, Citywide SRTS)
$g 883,000
Bicycle Transportation Account (BTA) Grant — 4th St (Roosevelt Ave to Harbison Ave)
$355,500
Community Development Block Grant (CDBG) — Drainage Improvements
$116,000
Community Development Block Grant (CDBG) — George H. Waters Nutrition Center
$95,000
Greater San Diego City Tennis Council Grant — Resurface El Toyon Park Tennis Courts
$12,000
Grants Awarded = 56 Total
$42,562,964
106
CIP Project Awards 111.1111.1.11
Awards
Institute of Transportation Engineers (ITE)San Diego Section `2014 Public Agency of the
Year Award"
Circulate San Diego "2014 Innovator Award"
American Planning Association (APA) San Diego Chapter "2015 Comprehensive Planning
Award: Small Jurisdiction" for SMART Foundation Plan
American Planning Association (APA) California Chapter "2015 Comprehensive Planning
Award: Small Jurisdiction" for SMART Foundation Plan
Women's Transportation Seminar (WTS) San Diego Chapter "2015 Innovative Transportation
Solutions Award: Alternative Modes and Active Transportation" for Community Corridors
Circulate San Diego "2015 San Diego Regional Walk Scorecard— Top Ranked City"
San Diego County Bicycle Coalition "2015 Golden Gear Award: Public Partner of the Year"
American Public Works Association (APWA) San Diego Chapter "2016 Project of the Year
Award" for "A" Avenue "Green" Street
American Public WorksAssociation (APWA) San Diego Chapter "2016 Honor Award" for 8th
Street Smart Growth Revitalization
American Public Works Association (APWA) San Diego Chapter "2016 Honor Award" for
Highland Avenue Safety Enhancements
American Public Works Association (APWA) San Diego Chapter "2016 Honor Award" for
Community Corridors
American Society of Civil Engineers (ASCE) San Diego Section "2016 Project of the Year
Award: Urban Design & Beautification" for 8th Street Smart Growth Revitalization
American Society of Civil Engineers (ASCE) San Diego Section '2016 Project of the Year
Award: Sustainable Technologies" for Highland Avenue Safety Enhancements
107
CIP Project Awards
Awards
Institute of Transportation Engineers (ITE) San Diego Section "2015/2016 Small Project of
the Year Award" for"D" Avenue & 12th Street Roundabout
Circulate San Diego "2016 Momentum Award: Healthy Community' for Paradise Creek
Educational Park Urban Greening Project
Women's Transportation Seminar (WTS) San Diego Chapter "2016 Innovative Transportation
Solutions Award: Alternative Modes and Active Transportation" for -A" Avenue Green Street
American Council of Engineering Companies (ACEC) "2017 California Merit Award for
Engineering Excellence" for "A" Avenue Green Street
American Public Works Association (APWA) San Diego Chapter "2017 Project of the Year
Award" for Paradise Creek Restoration
American Public Works Association (APWA) San Diego Chapter "2017 Honor Award" for
Kimball & El Toyon Park Improvements
1
ILI1111111.
firajert of the lienr
M1 Am.hut Cuts S,REF 1 Pk n1 t 1
Orr 61 \.HmeM C11,
'016
1k._tii.l.
A ram. �w.�..
(aRCULATE
National City
H. hest Score
1 all, toretard
FE Y 2018 CIP Funding Recommendation0..111
Project
Type
Description (FY 2018)
General Fund
(001)
Information
Systems
Maintenance
Fund (629)
Total
Drainage
Improvements
(001-409-500-598-7049)
Infrastructure
Replace corrugated metal storm drain pipes
and provide other high priority drainage
improvements Citywide
$ 200,000
$ 200,000
Public Safety Cameras
(629-409-500-598-8040)
Infrastructure
Replace existing cameras that are no longer
operational and/or require upgrades; install
new cameras and associated infrastructure;
locations prioritized by public safety needs
based on collaboration between NCPD, MIS
and Engineering
$ -
$ 200,000
$ 200,000
Traffic Monitoring/
Safety Enhancements
(001-409-500-598-6573)
Infrastructure
Provide traffic safety enhancements, roadway
rehab, new sidewalks and curb ramps for
Americans with Disabilities Act (ADA)
compliance; traffic data collection, analysis
and reporting; funding provides local match
for transportation grant projects and TransNet
Maintenance of Effort (MOE)
$ 1,000,000
$ -
$ 1,000,000
Paradise Creek Park
Site Remediation
(001-409-500-598-1597)
Parks &
Recreation
Provide site remediation, grading and
infrastructure improvements to construct a
new approximately 4-acre Community Park
with amenities on the west side of Paradise
Creek between W. 22nd Street and W. 19th
Street; General Fund will be reimbursed
through the Recognized Obligation Payment
Schedule (ROPS)
$ 2,000,000
$ -
$ 2,000,000
Total
$ 3,200,000
$ 200,000
$ 3,400,000
FY 2018 CIP Funding Recommendatio
Enterprise Lease Program (Annual Payment- Existing Vehicles)
FY 2018 Cost Funding Source
$ 72,171 General Fund (001)
57,422 Parks Maintenance
Fund (105)
22,622 Sewer Fund (125)
5,626 Section 8 (502)
18,599 Facilities
Maintenance Fund
176,440 Total
# Vehicles Vehicle Type (Department)
11 4 sedans (Police); 1 hybrid sedan (Building); 1 light -duty truck (Engineering); 2 light -duty
trucks, 1 medium -duty truck and 1 hybrid sedan (Neighborhood Services); 1 passenger van
(Community Services)
9 8 light -duty trucks and 1 medium -duty truck (Public Works -Parks)
3 1 light -duty truck and 2 heavy-duty trucks (Public Works -Streets & Wastewater)
1 1 hybrid sedan (Section 8 Housing)
3 3 light -duty trucks (Public Works -Facilities)
27
Equipment Replacement Reserve (Purchase Price w/ Aftermarket Equipment - New Vehicles) *
FY 2018 Cost Funding Source
$ 1,010,000 General Fund (001)
260,000 Sewer Fund (125)
210,000 Trash Rate
Stabilization Fund
# Vehicles Types
16 3 sedans and 6full-size SUVs (Police); 1 heavy-duty, 10-yard dump truck (Public Works -
Streets & Wastewater); 1 heavy-duty patch truck and 1 street striper (Public Works -Streets);
1 gang mower (Public Works -Parks); 1 electric scooter (Neighborhood Services -Parking
Enforcement); 1 F-450flatbed truck (Neighborhood Services -Graffiti); and 1 sedan
(Neighborhood Services -Code Enforcement)**
2 1 backhoe and 1 rodder (Public Works -Streets & Wastewater)
1 1 street sweeper (Public Works -Streets)
1,480,000 Total 19
* Reserve will be reimbursed through internal service charges by estimating the vehicle replacement costs over the life cycles
** Public Works heavy-duty, 10-yard dump truck will be funded in part by Sewer Fund ($40,000)
Questions?
See our Progress at:
nationalcityprojects. com
City of National City
Engineering & Public Works
1243 National City Boulevard
National City, CA 91950
619-336-4380
engineering@nationalcityca.gov
4-4 CALIFORNIA
TIoN L airy
INCORPORATED
NONA
Future Impacts
Future Impacts
Pension costs
Deferred maintenance
State -mandated minimum wage increase
113
_,,,,\IF.6,-13-iiii;t•.:).._-.
NAvv-i-IoNAL-
4
Next Steps
^- CALIFORNIA ^*
NATIONAL CITi
IWCOO* ED 1
Next Steps
Council -directed budget adjustments (if necessary)
Additional staff review and refinement
Neighborhood Council budget presentations (May
3rd, 11 th, & 17th)
Budget workshop, if needed (May 23rd)
Pension and/or OPEB pre -funding plan
Budget adoption June 6th
115
4- CALIFORMIA
NATIONAL Orr
133!
\-- INCORPOH AT>� J
Request for Direction
Staff seeks direction on:
• Revisions to the preliminary budget
• Pension and/or OPEB pre -funding — $1,000,000
• Aquatic Center — $181,000
• Additional Council priorities, staffing, or programmatic
adjustments
• Second budget workshop, 4:00 pm on May 23rd (if
necessary)
116
'•' CALIFORNIA
NATIONAL Cfl y
�NCOA►OKAT:O -
Deficit Spending
General Fund
Preliminary budget, as presented:
Projected Unassigned Fund Balance, 6/30/17
Estimated Structural Deficit, FY 18
1-time Capital Spending (Capital Expenses)
Estimated Remaining Unassigned Fund Balance, 6/30/18
With all potential adjustments:
Projected Unassigned Fund Balance, 6/30/17
Estimated Structural Deficit, FY 18
1-time Capital Spending (Capital Expenses)
Adjusted Estimated Remaining Unassigned Fund Bal., 6/30/18
$ 9,150, 509
(2,480,836)
(1,336,706)
$ 5,332,967
$ 9,150, 509
(2,789,101)
(1,987,744)
$ 4,373,664
117
Public Comments
ilONALei
enlr
Comments/Direction
119
CASH DE SALUD
IMPROVEMENTS
WEST$IDE IMPROVEMENTS
WESTSIDEIMPR 1 ENTS
• PARADISE CREEK PARK
• COMMUNITY GARDENS, NATIVE VEGETATION
PATHWAYS, BENCHES, PLAYGROUND
• STREET IMPROVEMENTS
• ROUNDABOUT, SIDEWALKS, ADA, LIGHTS,
PUBLIC ART
• CASA DE SALUD
PPP'
CASH DE SALUD IMPROVEMENTS
• IMPROVE SAFETY
• PROVIDE ADDITIONAL PROGRAMS THAT FOCUS ON HEALTH, FITNESS AND OVERALL WELL BEING
• INCREASE ATTENDANCE AND SERVE MORE NATIONAL CITY YOUTH
• CREATE AN INVITING SPACE YOUTH CAN CALL THEIR OWN
OVERVIEW
• RELOCATION OF FRONT ENTRANCE/LOBBY WITH HISTORICAL MURALS
• IMPROVED FACADE WITH HISTORICAL AND CURRENT PHOTOS
• IMPROVED USE OF MAIN HALL FOR SPORTS, ACTIVITIES, ARTS AND CRAFTS AND SNACK TIME
" SAFER SOCCER ARENA AND FITNESS AREA
• RELOCATION OF STUDY AREA AND LOUNGE
• SUMMER LUNCH PROGRAM
FRONT ENTRANCE & FACADE
' CREATE A HISTORICAL MURAL IN THE FRONT ENTRANCE/LOBBY OF CASA DE SALUD CELEBRATING AND
TEACHING YOUTH ABOUT THE HISTORY OF THE MANUAL PORTILLO CASA DE SALUD YOUTH CENTER
• CURRENT HISTORICAL PHOTOS AT CASA DE SALUD WILL BE INCORPORATED INTO THE DESIGN
' COVER OUTSIDE WINDOWS IN VINYL USING HISTORICAL AND CURRENT PHOTOS
' UTILIZE COMMUNITY ENGAGEMENT
• CASA DE SALUD YOUTHS PARENTS
• OLD TOWN NATIONAL CITY REUNION COMMITTEE
• A REASON TO SURVIVE
FRONT ENTRANCE/LOBBY
BEFORE & AFTER PHOTOS
NORM FIONT MANGE EXAMPLES OF POSSIBLE DESIGNS
--1177.—•ernm,
OUTSIDE WINDOWS
BEFORE & AFTER PHOTOS
CURRENT OUTSIDE WINDOWS EXAMPLE OF VINYL WRAP ON WINDOWS
NW- -
WXF1mtlf:J. q;WPRIMMIMilE1011111=1
MAIN NAIL
• THE MAIN HALL IS THE ONLY AIR CONDITIONED SPACE MAKING IT IMPORTANT TO USE THE SPACE FOR A VARIETY OF ACTIVITIES
YEAR ROUND
• CREATE A MULTIPURPOSE SPACE WITH NEW FLOORING, ACOUSTIC PANELS AND MURAL
• THE NEW SPACE WOULD BE ABLE TO ACCOMMODATE:
• SPORTS
• FITNESS CLASSES
• ARTS AND CRAFTS
• MOVIE NIGHT
" SNACK TIME
" SPECIAL EVENTS
• MEETINGS
MAIN NAIL
BEFORE & AFTER PHOTOS
CURRENT SOUTH WALL a TILE FLOORING
SOUTH WALL AFTER MURAL PAINTING
FLOOR AFTER MULTIPURPOSE FLOOR INSTALLED
WITH BASKETBALL HOOP AND PADS
MAIN NALL
BEFORE & AFTER PHOTOS
CURRENT SIDE WALL IN MULTIPURPOSE AREA
ADD ACOUSTIC WALL PANELS 8, TILES WITH ARTWORK
a SOLID COLORS THAT CAN BE CHANGED PERIODICALLY
UPSTAIRS SOCCER ARENA it FITNESS AREA
• CREATE A SAFE FITNESS AND SOCCER AREA FOR YOUTH OF ALL AGES
• NEW AGE APPROPRIATE FITNESS EQUIPMENT
• NEW GYM FLOORING
• NEW TURF
• INCORPORATE PHOTOS OF LOCAL SPORTS LEGENDS, INFLUENTIAL ATHLETES, AND MOTIVATIONAL QUOTES
IN THE FITNESS AREA
UPSTAIRS SOCCER ARENA
BEFORE g AFTER PHOTOS
CURRENT CONCRETE SOCCER ARENA MR
ADDING INDOOR SPORTS TURF FOR SAFETY
UPSTAIRS FITNESS AREA
BEFORE & AFTEII PHOTOS
CURRENT UPSTAIRS WORKOUT AREA
ADD ADDITIONAL PADDED FLOORING &
ADDITIONAL FITNESS EQUIPMENT FOR ALL AGES
UPSTAIRS FITNESS AREA
BEFORE g AF1ER PHOTOS
CURRENT CORNER WORKOUT AREA
ADDING BODY WEIGHT EXERCISE STATION INCLUDES ELEVEN
DIFFERENT EXERCISES IN SEVEN WORK OUT STATIONS
STUDY AREA & LOUNGE
• MOVE THE OFFICE TO FRONT ROOM ADJACENT TO THE FRONT ENTRANCE/LOBBY
• INCREASES SAFETY AND IMPROVES CHECK IN PROCESS
• REDECORATE THE OLD OFFICE AND TURN IT INTO A STUDY AREA AND LOUNGE FOR YOUTH
' QUIET ROOM
' TUTORING
• READING
• COMPUTERS
" GROUP PROJECTS
" TEEN CLUB
STUDY AREA & LOUNGE
BEFORE & AFTER PHOTOS
CURRENT OFFICE SPACE
EXAMPLE OF NEW STUDY
AREA/LOUNGE FOR YOUTH
SUMMER LUNCH PROGRAM
• JUNE THROUGH MID JULY
• 12 PM -1 PM
• FREE FOR ALL YOUTH UNDER 17
Nki /
Vz.
cltt 1001
/110 4,
Kids
VI teens