Loading...
HomeMy WebLinkAboutCC ORD 1958-931 Adds § 4 to Ord. 927, electrical installations (Repealed by 1115)For each additional sign on same building .75 2. Permit fees for gaseous tube outline lighting, decorative lighting and/or formed for advertising purposes shall be based on the following: First two (2) transformers and/or flashes therefor $1.50 For each additional transformer and/or flasher .25 For each sign requiring inspection before erection 2.50 3. Incandescent Tamp signs: For each incandescent lamp sign including sign flashers 1 to 10 lamp holders for each sign .25 11 to 25 lamp holders for each sign .50 26 to 50 lamp holders for each sign 1.00 51 to 100 lamp holders for each sign 2.00 101 to 200 lamp holders for each sign 3.00 Over 200 lamp holders for each sign 5.00 (h) Fees for each item of equipment such as generators, rectifiers, motors, transformers or other similar equipment including controlling and distributing apparatus shall be in accordance with the following table: First or Largest TVA -faring Equipment Additional Equipment 1/3 or less y .25 $ .25 Over 1/3 and not over 1 .50 .50 Over I and not over 5 .75 .75 Over 5 and not over 10 2.00 1.00 Over 10 3.00 1.50 Plus 5 cents for each additional HP, KW or KVA over 10 1. Fees for busways, trolley ducts and similar equipment shall be based on the following schedule: Each 20-foot section or major fraction thereof for busway or trolley duct operating at a maximum of 120-240 volts single-phase $ .25 Each 20-foot section or major fraction thereof for busway or trolley duct operating at a maximum of 240 volts 3-phase .50 Each 20-foot section or major fraction thereof for busways or trolley duct operating at a maximum of 600 volts 3-phase. 1.50 2. No fee shall be required for moving any motor from one place to another after a permit has once been obtained for such motor and the fee required for thereof has been paid. -3- 3 No fee shall be required for any motor which is a part of any appliance provided the required fee is paid for such appliance. 4. No fee shall be required for any such equipment provided the required fee is paid for such equipment. (1) For heating equipment outlets not grouped on a branch circuit, including ranges, welding outfits, furnaces and the like anc their connections and following fees shall be paid: Not more than 2 KW .50 Not more than 5 KW .75 Not more than 10 1.00 Over IC 1.00 Plus 5 cents for each additional KW or KVA over 10 (j) The fee for an electrical utility connection shall be twenty-five cents (:a .25) for each such connection. (k) For each set of service entrance conductors including one (1) meter, the fees shall be as follows: 1. Entrance conductors: Not larger than No. 1 :31.00 Not larger than 200 i.1CM 1.50 Not larger than 400 MCM 2.50 Larger than 500 i.1CP. 3.50 Plus 25 cents for each additional service meter 2. Fees for temporary services: Construction pole assembly $1.50 Temporary service other than construction pole 1.50 (1) In addition to any other penalty provided in this code for violations thereof, any person who has done any electrical work without a permit where a permit is required by this article, or who has caused any such work to be done without a permit, shall pay a fee of ten dollars (>10.00) in addition to the regular permit fee for inspection of such work. PASSED AND ADOPTED by the City Council of the City of National City, California, this .., 7 day of , 1958 by the following vote: Ayes: Allen, Fessman, Noes: None Absent: None ATTEST): CITY CLERK Hart, Hollingsworth, Hodge MAYOR