HomeMy WebLinkAbout2023 CON Innovative Construction Consulting Services LLC - Las Palmas Pool Renovation CIP No. 22-01 Change Order No. 12Innovative Construction Consulting Services, LLC P.0, Box 11 Norco CA 92860 Phone (1) 532 - 6 8 3 t if 671810 sgill@iccsinc.net. CHANGE ORDER ERMEMORANDUM September 29, 2023 To: Luca Zappiello National City Engineering and Public Works Department City of National City From: Sean Gill Project: Las Palmas Pool Renovation OP No.: 22-01 Subject: Change Order No. 12 ECF 1 1 i r. T t - 1fl'OQT 2 A L iy ;if` i Q A L C,f y Change Order No. 12 provides for: The City redesigned the deck layout and as a result the revised plans required handrails at all locker room entrances with ramps. All work has been authorized at the agreed price listed below. Payment for this change order will be at the lump sum prince identified on C012. Supporting Information: The original bid drawings did not show any handrails as the existing design did not meet ADA compliance. The revised deck design was required to comply with ADA standards. The contractor submitted a price for the additional handrails and after negotiation, the contractor was directed to perform all work at the lump sum price listed below. Time Adjustment: The work will take five days to complete and the contract time will be adjusted accordingly. CAAdjustment: The change will increase the original contract amount by $14,473.41 per the attached proposal. The payment method and amount have been reviewed by ICCS and are considered fair and reasonable compared to past projects. The supporting documentation is on file with the project records. 9-29-23 ject Manager Date NATI itik" 1W/ ..(711.6", r INCORis on AT at Las Palmas Pool Renovation CHANGE ORDER NO 12 CIP NO. 22-01 September 29, 2023 Contractor: California Commercial Pools The City redesigned the deck layout and as a result the revised plans required handrails at all locker room entrances with ramps. Alt work has been authorized at the agreed price listed below. This Change Order modifies Contractor's and the City's obligations and rights under the abovementioned contract. This change order is not effective until approved by the City. Timeaddlustmant: Five (5) working days were added to contract time due to accommodate the installation. Cost_of + on a Order; There is a cost increase to the original contract per the Iury p sum price shown. $14,473.41 • Recommended by Project Manager: Date: 9_7 _ 3 By signing this Change Order, the Contractor confirms that he/she is completely familiar with and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. The signer for the Contractor confirms that he/she is authorized to bind the Contractor to this Change Order. Agreed and Accepted by Contractor; (California Commercial pools) Approved by Project Coordinator: -pi (4'14 Ap4F Approved by Assistant Director of E & PV':f"Ef Approved by City Engineer: Date: � /zi 2.21 Date: 2/2-02.43 Date: l ( j�J 7i 2,3 date: l LA/23 Approved by City Manager: (Required for change orders $25,000 and above) Date: 2255 East Auto Centre Dr Glendora, CA 91740 phone (909) 394-1 80 fax (909) 394-1630 -� CALIFURNIA commercial pools Change Oi'der Request JOB NAME: LOCATION DESCRIPTION: LIU Palms Pool 1800 E. 22nd St National City, CA Install (4) new ADA ! and ails per upd t d drawing on DP-2 DATE: Project # C.C.P.% CHANGE ORDER # 8/2212023 22054 LABORER IRON WORKER OPERATOR ELECTRICIAN PLUMBER CARPENTER PROJECT MGR & TECH 16 $76.61 $85.64 U M.H,@ $89.88 0 M, H. a $92.47 0 M.I.@ $90.71. 0 M H $87.01 0 [ I 1 $105.00 PER FIR. PER HR. PER SIR. PER HR PER HR. PER 11R PER HR,. 2 SUBTOTAL OF LABOR HOURS COST 3 LIABILITY AND PROPERTY INSURANCE 0.00° OF LINE #2 4 MATERIAL 5 SALES'iA OFLINE I#4 6 SUBTOTAL OF MATERIAL COST 7 SUBTOTAL OF EQUIPMENT ENT 'OST 9 MATERIAL HANDLING & MISCELLANEOUS EXPENSE 0.00% OF LINE # 8 EQUPMENT & MATERIALS 15.00% 10 SUBTOTAL OF LABOR, MATERIAL & EQUIPMENT 11 SUBTOTAL OF SUBCONTRACTOR COST 12 SUBCONTRACTOR'S LABOR & MATERIAL MARGIN 13 LABOR MARGIN 5.00% S 1,225.76 $0.00 $0_00 $000 $0.00 OF LINE 11 $600 00 20.00% OF LINE 10 $245.15 14 SUBTOTAL OF LABOR,MATERJAL, EQUIPMENT, OVERHEAD, & PROFIT $14,473 41 15 BOND PREMIUM INCLUDED ABOVE 0% $0 00 16 SUBCONTRACTS & EQUIPMENT RENTAL MARGIN 0.00% $0.00 TOTAL S14,473.41 .-.,� CALIFORNIA commercial pools +C ty Description - ui rnent Extended Materials Extended Man Hours Extended Reference _Unit Layout and Core for Rail Posts $ 00 00 $200.(i - — 8 1 Set Posts! Si 50 0 $150 00 8 $0.00 :000 S200.00 S150.00 16.0 Subcontractor Work Reference I Qtv Unit Description Trantek Handrail Fabrication Alf Quote Extended 12.00 00 CSLB:1021573 P.0 Box 90631 City Of industry, CA 91715 Phone: 435-7237 Email: Fld l@Ir nt .pro Web: www.IRONTEK.pro Prepared For California Commercial Pools 2255 E. Auto Centre Drive Glendora, Ca 91740 (909) 394-1280 IRONTEK TE Estimate # 20160341 Date08112/2023 Description Rate Quantity Total Pipe Handrail $121000.00 1 $12,000.00 Fabrication of4 sets of Railings for a ramp access approximately 45 feet total Ramp 1 ; 5ft long Ramp :1 ft long Ramp 3 : 18ft long Ramp 4: 5ft long Materials 1-1/2" pipe s h 40 galvanized approximate O.D 1 . " ATM A53 A Notes: Project: Las Palmas Subtotal Total Si 2,000.00 $12/000,00 P cje 1 or CU0 1 EXTENDS IAGONAt LY ONE MEAD aIYtF! PWS WIDTH OF TREAD MN le, ErEticS 4I EXTENDS - DW3ONAE 1 Y ONE 1H HEAD WBDT H 1 u� waniaa wF+FFIE LI._ CUR S vz STD PIPE TYP 12' MIN LEVEL PIPE HANDRAIL POST MOUNTED Rail details provided by Iient • w imiwo $ECT O4 Hand rail design POST SHALL BE CENTERED IN STAIR TREAD. -i *M\rrt NQJ.SHRINk Q.ROUT MOUNTING DETAIL* Post footing detail GALVANIZED PIPE SCHEDULE (40)- 1- inINCHES Galvanized Pipe • schedule (40) • A - Width: 1-1/" 1) • B - Thickness! O,9 ."" �y1F + • DETAILS Galvanizing is the process of applying pratectNe zinc coating to prevent rusting. The zinc coating is applied by the continuous hot -dip process, producing a tight coat of prima spatter o€ the 1.25 oz. per square foot coating ck s Pipe as a tubular product intended primarily for such purposes as the conveying of tar, fuel, gas, air, steam, etc. Page 4 ()f — -- — -- VP V- 31 1I+ oleo' LV14,104, PAN Rapid Set CEMENTALL. MULTI -PURPOSE REPAIR MATERIAL & NON-SHP INK OROUT was station . NIT fill 'MID MM1&4 • p ILUirIi a aura Ilatia11111111 . tamituttrimma mak/ or( tat* •••1— =Mir .._ milimdigaT_. wt . 4.0 WM .�� ke- I it. _ it. , wIPPIValrl N,a]iSriA Bel LB 05 4. Anchoring concrete non shrink Ramp 1 �r�c.,5rfi (E) BATHHOUSE IfF z 61.12 TD ()11142" CW WITH WITH 'STRONG 5 C-3 $ LOW E TILES ENCLOSURE x vecw so..xa rt 1.3' ID Cut MO !i:1. ra rai 4rr_t.i i e1 r,rreGt4 TriptiAtri rode wort irrl Ail& vemodo*•r II R[ A •rsrbronirfar.r1111 i I Ramp 2 A VA LleArtD el tote. Pl. +5401 TIP [LI27 a AL T1iJ► r INre9 r'L�Ir fr • ACIALiolies presin, Of al SUJIMEING POOL t s 1tr0raA140r Ramp 3 r1 Is1k/!► — 00 Page )Ana tisigiiim oftvre .ate_■,bis, 50klmi1■ 1 I 3rj'c&p i6 @. lAt3A ttt ##on, V ' , | Ramp 4. PO 130 STE - A(IA tg § 1 mei ,r■ (AAA !#m■, |Oc q� TD California Commercial Pools Page 7 qt7