HomeMy WebLinkAbout2023 CON Project Professionals Corp - National City Street Resurfacing CIP No. 22-19 Change Order No. 14' a° 1 3: 3
1
Cri C. TY
PPD4lLCT PRE F � d[7c+a;Tl_ rop.prigai,,I1 IOTA
CHANGE ORDER MEMORANDUM
October 25, 2023
To: Stephen Manganiello
Director of Engineering & Public Works/City Engineer
Engineering and Public Works Department
City of National City
From: Josh Johnson
Project Manager
Project Professionals Corporation
Project: National City Street Resurfacing FY 21/22
COP No.: 22-19
Subject: Change Order No. 14
Change Order No. 14 provides for:
The Contract adjustment to the line item quantities installed in the field.
Payment for this change order will be as agreed upon at a lump sum price.
Sup ortrnq:lnformation
During the initial investigation of the project streets to identify improvement needs, PPC estimated quantities of
asphalt and concrete improvements based upon surface conditions. During construction, the Contractor provided
recommendations to each site in order to best rehabilitate each street according to the existing conditions. These
recommendations resulted in the measured line item quantities exceeding the Contract bid quantities.
On Mann Ave the surface failures of asphalt paving were all captured within the 1.5" grind and overlay and no
additional digouts were necessary. To be ADA compliant, additional ped ramps were captured on this street which
resulted in increases to bid line item 9 as well as increases in the PCC improvements line items. The net increase
for line items on Mann Ave was $13,458A5.
n E. Plaza Blvd, extensive subgrade failures resulted in the need for additional 4" asphalt digouts. The limits of
work were extended to include the crosswalk areas on crossing streets which required additional AC paving as per
base bid line item 421. The net increase for line items on E. Plaza Blvd was ,08 .02.
At the El Toyon Fire Station 33, the limits of the PCC Driveway were extended to provide additional turning radius
for emergency vehicles and dump trucks resulting in an increase to bid line item 436. Approximately 12 TNs of
additional asphalt were required to complete the scope within this project area. The net increase for line items at
the El Toyon Fire Station 33 was $251801.65.
On National City Blvd the Contractor recommended performing a 2" grind and overlay to capture the failures in the
AC paving. The additional tonnage was paid at the bid line item for 1.5" AC paving and no additional digouts were
required. The limits of the grind and overlay were extended to include crosswalks on crossing streets which
PPCI.JEGT PiRC] FES SA C]f+ ;L5 cO PC7l l=:
required additional AC paving as per bid line item 443. Cracking in adjacent sidewalk panels resulted in an increase
to the SF for PCC improvements. The net increase for line items on National City Blvd was ,41 .61..
4n 16' St additional AC paving was placed to rehabilitate crosswalk areas on crossing streets. The net increase for
line items on 16th St was 9,45 , 0.
Due to extensive cracking in many of the driveways along Roosevelt Ave, the Contractor was directed to remove
and replace additional PCC driveways. However, the City received a net savings on Roosevelt Ave by directing the
Contractor to perform an edge grind and overlay to help raise the crown of the road and increase drainage. This
resulted in savings to the City by deleting the 4" digouts and replacement of the unsuitable subgrade. The net
decrease in the line items on Roosevelt Ave was $78,535.08.
Time Adjustment.
Zero (0) additional working days are to be added to the Contract.
Cost Adjustment:
The additional cost for this change in the scope of work has been agreed upon at a lump sum price of 138,679.55.
Each line item will be paid in full and the remaining costs will be as a lump sum on this change order.
The pay method and amount have been reviewed by the Project Manager and are considered fair and reasonable. The
supporting documentation is on file with the project records.
Josh J oh nson 11/21/23
Date
Project g any . Manager
CALIFORNIA
ATIONAL CI
el 3
INCORPGRATFD
National City Street Resurfacing FY 21/22 CHANGE ORDER NO. 14
CIP NO. 22-19 October 16, 2023
Contractor: Eagle Paving Company, Inca
13915 Danielson Street
Poway, CA 92064
This Change Order modifies Contractor's and the City's obligations and rights under the abovementioned
contract. This change order is not effective until approved by the City.
Time adjustment:
Zero (0) additional working days are to be added to the Contract as the additional work did not affect
the critical path of the approved schedule.
Cost of Change Order:
The City and the Contractor agree to the line item adjustments shown on the attached sheet. As stated
in the Contract, the bid quantities were estimated values that would be more accurately measured in
the field during installation. The net result of the installed improvements exceeded the bid quantities.
The total increase for all labor, material, equipment and all other associated work is 13 , 7 .55.
Recommended by Project Manager: lash Johnson, PPC
Date: 10/ / 3
i this Changeiscompletely familiar with and has fairly
signing � Order the Contractor confirms that he/she caimp et �
negotiated its price, terms and conditions. 1 this Change Order is approved, Contractor will provide all of the
equipment, materials and labor necessary to provide a complete work as described above at that the price
stated herein. Contractor confirms that the price is fair and complete and represents all costs associated with
the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds,
insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the
original contract documents are incorporated herein. The signer for the Contractor confirms that he/she is
authorized to bind the Contractor to this Change Order.
Agreed and Accepted by Contractor:
(Print Naa m and TWO Marisa arl;Inci, CFO 701-eidid
Date: 10/19/23
Approved by Project Coordinator.
).'
Date: ►
Approved by Assistant Director of E & PW:
Date:
Approved by City Engineer:2
Date: /1/9' Z. I
7
Approved by City Manager:
(Required for change orders $25,000 and above)
Date: it ifi) /443
1
-1CALIFORNIA
N*UONAL
„:3 :cy
Tigl
r CORPoRAT1D
NATIONAL CITY STREET RESURFACING FY 21-22
CIP NO. 2 19
DATE: October 13, 2023
CHANGE ORDER NO. 14
WORK PERFORMED BY: Eagle Paving
DESCRIPTION RIPTION OF RK: Line Item Adjustment
ACCOUNTING FOR TIME, MATERIALS, AND EUIPMENT
BASE BID QUANTITIES
Bid Subtotal
Earned Amount
Delta
1)
Mann Ave
$ 77,789.90
$ 91,248.35
13,458.45
2)
E. Plaza Blvd
$ 699,775.25
$ 798,863.27
99,088.02
2)
El Toyon Fire Station 33
$ 165,985.00
$ 191,786.65
25,801.65
)
National City Blvd
634,015.65
$ 703,429.26
69,413.61
2)
16th St
$ 122,069.25
$ 131,522.15
9,452.90
2)
Roosevelt Ave
$ 372,883.95
$ 294,348. 88
(78,535. O8)
Subtotal:
GRAND TOTAL:
$ 18, 679.55
138, 79. 55
Eagle Paying
13915 Danielson Street V201
Poway, CA 92064
4- 0141101I1KIA
NATIONAL Ciinir
f
r . Iscortronklay
tUC street Ftesrrrfaci#tg FY 7102
CIP !il, 22-19
Line Item Adjustment Change Order
5eptember 30, 7023
Origrnal C_orrtract
Thus &Illir,r
r0 Date
D=;t e
No. loam
UnitQuantity
UnIL Price
Amount.
QusrnrtV
Rmaurt
Quantity
Aril vunt
Quantity
Amount
Base Sict
Base air - Main AV - 8eU Street to Alpha. Street
1
Mlobi Itaationf0ernobiiaation
LS
1
8,30Q.00
8,300.00
1.00
6,3t]0.Ci0
-
3,00
8.3X.;t-•
Traffic Control
LS
500.00
500O0
1,00
500,00
._
1007
S*, .L0
.
3MdPPP, Water Qtralkly Control
LS
800,0{1
&)0 001.00
8.0Ci.00
•1
OCl
SC''
Survey Monument and 6enchmafkTie-Out and Corner Reterd=
Eli
2
630,
1.*•
630,00
Cold Milling Asphalt Pavement-15Depth
5F
9.tiO4
0.40
3,600,03
9.20O0O
3,680,00
3,530.00
SB:00
Remo/al, disposal and reRiacemont Unsuitabie Bale/ 5ubgrade
CY
S0
75.010
3.750.00
-
-
(3, Oti}
LS" Asihelt Concrete (AC) Pavement wittiPorta•fi
TN
d35
180.00
15 300.00151.d6
27.262 80
151.Ab27.252.80
_J,91 8d
4"' ihalt Concrete A Di;; . is
TAB
35
19r}:0i
6,550.00
-
RerTove and replace PCC Pedestrian Curb; Ramps per SDRSt0
EA
2
4,725,0?Ci
'24SU,CJS?
4.00
16.900,00
-
-
A,4CJ
18,900,00
10
Rrmeue and replace PCCSidetvalk (5DR505•07)
SrP
200
113;
2,lryp,p0
3ii7.Ctli
3.853 SO
-
-
36 ,UL]
3.853.50
1.753.5C►
fterrto+re and replace P0r Curb aru! Gutter (Still SD G-02)
LF
251
52.5t7
12,127501
222,5d
11.651.75
-
-
222.St
11,681.25
12
Remove end replace PCC Goss Gutter (5Cl•Fta 5 G-12)
SF
402
25,70
12,144i_Ar!
5574,00
1t5,,:6 },8Q
'.14.00
14,44 80
13
Reset Svrrap' Manumerrn and Eienchrrarls and Corner Records
EA
2
1.00
53;7.C'7
1.00
53DCO
.Q0I
14
Roadway Striping, 145ir4ings _ _
EA
1
5-46.00
5»b.cO
1.00
S45.09
-
-
1. 7
SdS.o3
— —
Subtotal
77,759 �?J
9i,2+1$.35
1.3,458.4S
15ase Bltl - E. Pia it Bautrvird - 0 Avenue err Phi AVent92
1`
MebilbtatIOnfDern b-lIleettr7
i
9.000.00
8.0CXJ.00
1.00
• • s i•
1.00
9, CD.QQ
.
16
Traffic Control
LS
1
14,000.00
14.Ci}O:00
1.00
14.000.00
1.0(1
1+t000,017•
17
S PTIP, WaierQualiy Control
L5
1
5UO00
5O[1P0
3..00
soor03
1_00
S000i3
.
18
Survey Monument and Benchmark Tie -Out and Comer Records
EA
I2
420.00
8_00
3. KW
-
8.00
3,36t?:t},
4 LSO;
Card Klima Asphalt Pavement-'2. Depth
SF
220,000
024
52,8O0Qi0
7.23,875.00
53,730 00
223,87500
53,7r3€1.Or7
930,170
20
0lenttroal, disposal and replacement Urtsuitabre Base/ 5u r-ade
CY
305
75.00
22,875.04
28.00
1,95{i_(k3
-
-
25.00
1.950,00.I
21
2" Asphalt Concrete (AC) Pavement with forta-Fr
TN
133.50
353,120.t7a
3.0 9.77
-
-
3,023.77
404,47430
41,354.30
22
4" Asphalt Concrete (AC) bigoits
TN
313c
13I.00
53,515.0t1
348.87
117;941.93
-
S48:87
64.477.93
23
Remove and re•laCa PCC Pedestrian Curb Ramps p-e 5i1?l50
EA
i 7
4,20 _•
=s44p.[
13
60,07.01
-
13_00
E-0 0• w .
it,4/i1_00
Remove and replace PCCSdilew:tlk (SCRS0 G-07)
SF
500
:Li,
5250.00
730.08
'7,665.84
-
73008
r
24
25
Remove and ire.lace PCr~ Curb aril Gtrtto- (Sk7d##b G•021
LF
300
51.6
t5;750 CO
389 5l1
.C1,448.75
339_50
210.448.7S
Fr empire and replace PCC Cross Gutter (SOBSd 0.12)_
SF
420
25_70
1C#,5R.1_L
3B0_ f
9,576_00
•
380.00
•
__ --: ' i
27
PCC Bun Pad
SF
1,500
27-30
Q3,6Et .C+O
1,654,00
45.154.20
-
-
1.69400
45,154.20
1,474.20
28
Rernow'e and replace 5' Type E loop and Limit Line Type 1= Loop (Cattrarts Standard Plan ES-58
EA
65
472_50
30,712.50
69.0EJ
32,602_50
-
-
69.00
32 •+ +
1,830.00
29
Beset Survey Monurnarrts and Benchmarks and Corner Records
€A
6
42000
7,520.00
8.00
3.360.00
-
-
SOD
+ +a
240dIO
30
Roadway Striping, Markings
LS
1
14,988.75
1.3988.75
3..Ob
14,983:75
.
.
1.00
14,988.75
.
Skil-notl
6951775:25
798,863.27
-
798,863,27
99;0E8:01
Base Bid - Ell rayon Fire Stalker 33
31
NlebilitatioiVDen,obiFFzatioii
LS
1
2,500,00
2,500,00
1.00
2,500.00
-
-
I.,00
2,500.IX1
52
Pale in,1n andTrai1iCConti❑t
L.5
1
1,500.00
1,500,V0
].
],5 ,00.
1_OCI
1,��`Q41-q{J
33
5WPPP,Water Quality Comrol
LS
1
50000
500,00
1.00
503.00
-
-
1:DO
50r3.OG
-
34
Cold Millin; As .halt Pavement- 3"Cie th
SF
9,000
040
3.600:1;}0
9,O ,t7C1
3,600,0
-
9,07,000
3,617tC7OK]
.
3" Asphalt C AC) Pali-rne_nii witty Forte -Fa
TN
160
175.00
28,000,00
172.2T
-
-
172.27
3 ,I�ii'_Z5
2,14t7.5
36
NI
PCC Drtvewa
SF
7.700
16.80
129,360.00
153,014,40
-
9,108 00
1530I4.411
23,654,40
Rvadwa Stti pine, trier-H,zngs
L°,
1
525.00
52ar_OD
1.O0
525,w
-
100-
Subtotal
155,985.00
191.78.5.55
.9I,385.a`S
25,8��1 =,
Bass Bid - NNaitlanal City Butrlavatd-16th StrereI. tv W. 33rd Street
38
Mob] lkratie rti,DernobliizatInn
L5
1
10.003.00
10.00000
L-00
.10,MCO.00
-
-
1 00
10,0 0.00
-
34
raft Control
LS
1
79,04406
24,0001:00
1.+70
79,000.{{J+7
100
2.9.0 6_00
40
SWPPP,Waterquality Control
LS
1
500.00
503.00
1.00
500.00
-
100
500.0]
-
41
5iJveyMonument and Benchmark Tie-aura-ndCorner he2vrds
EA
20
42000
9,400.CC
11-000
4,52iJ,r7Ct
11.00
4,620.0CI
;(3:7801Jr1)
42
Cold MtilrnF Asphalt PavBrrtent-1-5" Depth
SF
310,0()
0.23
7.1300_00
353,900.00
131 3 7_00
S53.900.003
81,39?.000
10,0 .7_iX.J
43
1.5" Asphalt Concrete (AC) Pavement with Fnfta-Fi
TN
2,900
126-50
366.850.00
3,786,77
479,0226.41
-
-
3,785.77
479.076.43
117,176.41
4.3
4' Asp,`iait C4naete (AC) bIgavls
TN
38s
139.00
5.3,515.00
-
(59,515.00)
45
Re rirtrYee anti repeats PCC Pedestrian Curb Ramps per S0R5a
EA
22
.16.20
1,016_40
18.00
831,60
-
-
18.00
831.60
(164,30)
46
Remove and replace PCC Sidewalk (SPRSD G-07)
SF
1,G•Lr0
10 5Cr
10,500.00
1.150,00
122,075.00
•
1,150.00
12,075.0{1
1,5Y5.00
Page 1 of 2
eagle Paving
13915 Danielson Street 4231
Poway, CA 92054
.0AL.iFOMMPA -
NATIONAL City
[WCbrrC�'rt 4'jN -
Original Contract
previous Billing
This BiPliny.
To mate
Delta
Na.
Item
Linn.
Qttaritlty
Unit Price
Amount
Q01101 y
Amount
Lluanhty"
r TcLirit
Quantity
Amount
47
Remove and raeplacf IBC Curb and Gutter 150R50 G-021
tF
I16
52 17
4,515.fX1
148,00
7,770.00
149.00
7,770,00
3,255.0D
48
Retm nve.arrd replace 6' Type E Loop arid Limit Uri Type F Lop (Ca !trans 5tandafd Plan ES -SE
EA
90
472.50
42,525_00
#a.ro
40,E3S-Cr0
-
86_00
43.635_07
.t1 d,
49
Roadway Striping, Markings
1.5
1
26,234,25
26,234,25
,LOO
26,25415
-
-
1
26,234.n
`
50
Resit 5uway fv10numants and 8enthrrmarlis and CorttEr ale00d_,
Eh
7
420,03
2,940.00
21-00
4,670.1X)
-
-
11.00
4,620.00
1_06003
5.1
eti ckeren Goss Wallis (National Oty $purl j
EA
; d
1.630,00
6,720.00
4 00
6,72CJ 00
-
-
400
6,720.03
-
Subtotal
63,1r015.65
703,429 26
-
703.429.26
+6.9.413.61
ase Bid - 16th Stro=et • D Avenue to Highland Avenue
52
Mobilization/earn obi l!a:ation
LS
1
3,250.00
3;2SCL00
1_00
3,250.130
-
-
1,00
3,250.00
53
Traffic Control
LS
1
6,00531.00
6.000.00
1.00
6,00000
1,00
6000.00
54
SWPPP, Water Quality Central
L5
3
500.00
bCJQ,c4
1.00
1300,00
-
-
1.00
800.00
•
55
Cold Manz Asphalt Pa4errr,=nt-1.5` Depth
tE
65400
4,25
16.250.00
66,916,00
15. tZ`a_OQ
•
66.916:00
16,729.007
47900
56.
1.5` Asphalt Concrete {AC) Paverent with Forte
6
TN
610
130,00
7 t,300.00
675.{}3.
96,273,90
-
679,03
88,273-.50
8,973,901
57
Remove aitd replace 5' Type E Lgap anti Lrrnit tine Type F Loop (Caltran5 Standard Non ES-5B
cA
15
472.50
7r0S7,50
15_00
7,08250
-
15.00
7,097.50
-
5-9
Roadway striping. Markings
- l7..
9.3J31.75
9.3u1.75
_ 1_r1O
9.381,75
-
1,00
9,381.75
-
5trlat+ot3l
127,M8.25
151,522_15
131,522.15
5,+R5
B2.10 Bid - Roosevelt Avenue - ath Street to 15th Street
59
NIobilfsation/Demotxlllratlun
L5
2,500_03
2_5O0.00:
1.00
2,500.CO
•
1_03I
2,300.00
60
Traffic Control
L5
1
9,693.70
9,696,70 ,
1-tea
9.693,70
-
-
1,00
9,698.70
61
SWRPP, Water quality Crarstrat
LS
1
60040
000.00 '
1.00
800,00
-
-
1_00
600_00
-
61
Survey Monument and BenchmarkT.i.e-Clot and Conner Records
EA
5
420 to
2.103,00 '
-
•
-
-
-
12 'CO
63
Cold Milling Asphalt Pavement - 2' Depth with Petromal
5f
1211:1Cks3
0.=5
30,00900
1.1,197 CC
3,549.75
-
141,197.00
3.5.19.
26 2475)
64
Rem&Fa], disposal and replacement Ur sritable Base/ Sub de
Ct'
20
90'
1.800,00
-
-
-
-
-
-
00
65
2' Asphalt Crincrote (AC;) Pevernerit with Farts-F1
TN
1500
173.51
185, 50,00
1,246.59
153,9135.9H
-
-
1,246.115
1:13,9B5-9
3' 173)
66
4" Asphalt Concrete (AC1 Dlgouts
TN
150
150.
22,500.00
-
-
-
-
-
-
f22.5t0
67
Rerncve and replace ?CC Sidewalk I.S0ltSD0 071
sr
2643
10.S
13,064,00t
201,0
7,173.5ii
-
207,67
2173,50
(t1
6$
Rem ors and replace PC.0 Driveway
5f
750
18-9
14,175.00
1,393.00
26,127.70
1,393.00
26,327_70
69
RUM eve BmarefiliiceMCCtirband Gutter (SDFSDG•02)
LF
1561
52
57,20250
1,+548.00
ab.5zaoo
-
•
1,645.00
86,520.00
1161. 1
70
11UFTECt2 and replace 6" Type E Loop and Limit Lire Tyrre 11 Loop (Ca ltraras Standard Plan ES-Sli
EA
12
472.5
5.67000
12 0CI
5,6713_Ci0
•
12.00
5.670.00
,
71
Roadway Striping, Markings -
1.5
1
3123.75
3,123.75
J OCJ
3,123.75
-
1.00
3,121.75
Subtotal
.572,99395
294,3 .38
294,348.56
. t ,_--fagfia
BASE BID TOTALS
2;072,519.00
2,211,19E_55
-
2,211,196.55
1t3'8,r679,S5
change
Orators:
1
Install ternpdrary asphalt paving rn ti.cg pest area
15
1
5,021.29
5,021,29
1 ?
5,021.79
-
-
1,00
5,021,229
2
Rein a and replace utility lamte.. gang E. PIa2a Blvd
1
1,627.50
1,627 50
1J7t
1,62 750
-
•
1,00
1.627,50
3
South side demolition of bus Pad area
10,090.65
10,090,65
1 00
10,090.65
-
1.00
10,090.65
4
North side demolition of bus pad area
4,26fi_49
4,266.49
1.OG
4,266.49
-
1_00
4,266.49
5
Install3" asphalt oar bin pads
LS
1
5.915.22
9.915.22
L0Cl
9,41522
-
•
1..00
9,91522
Additional concrete `rending on Roosevelt Ave
t __.
1
, r,591.49
15,591,49
1.00
15591,49
-
1.00
15,591_49
13
Place flashing message boards along National City Blvd
t_
1
2,310.00
7,910.00
1_03
2,310.00
1.00
2,310.00
9
Additional trafficcontral5 for p.. d moire.r►stallatiwn Isar Pl. a Blvd
05
1
3,77475
3,774,75
1.00
5,774,75
-
-
i_00
3,774L75
1[}
Remove and rePlace checkeredcrosswalls on National City8livd and install continental
uusswalld at Plaza Blvd and Highland Ave
t.
1
95,842.16
35,842.16
1,r30
95,342.16
COF.
5,$.1215
11
5unary rnorwment adj tratent on Roosevelt Aire
LE
L .
1
6291.67
6,694.67
1.00
6,1394,67
1_01
6.894.67
12
Additional trait -it loops on 16th 5t
1
14,070,00
14,070.00
i
- •
•-
-
13
Traffic loop tie-in on 16th 5t
L�
t
10,314,92
70,314.92
1,00
1A,31492
1_00
10,314.92
CHA N G E ORDER TOTALS: 17.9,719.14 165, 645.14 •
165,649.14
GRAt40 TOTAL BID(8A5E t#JD+Q'IANGE 0RDER5)4I 252,2383_14
f 2,316, 47.69 I - I - !
2,376,947.69
ItE rEN110N:
AMOUNT DUE TNISINV0{CEL
Page 2of2
Tirza Gonzales
From:
Sent:
To:
Cc:
Subject:
Attachments:
Randy Garcia <rand @ppc-sd.con-r__.
Tuesday, November 21, 2023 2:1 -1 PM
PWE Invoices
Josh Johnson; Mercedes Munoz; Luca Zappiello
Re: NC Street Resurfacing - Change Order
CO#14 - Partially Signed.pdf
CAUTION: This email originated from outside your organization. Exercise caution when opening attachments
or clicking links, especially from unknown senders.
Hello Tirza,
Please process the revised change order *14 for the line item adjustments.
Randy Garcia
Project Manager
Project Professionals Corporation
4700 Spring Street, Suite 100
La Mesa, CA 91942
Office: 858.634 8180
Mobile: 805.62 i .2225
ppc-sd.com
NOTICE TO E IPIENT This email and its contents are protected under attorney --client privilege and may be attorney work product, If you are not the intended
recipient or an authorized aced :ofthe recipient, innmediately inform the sender .pia email or call at 85.8..8 e ` 8 and permanently destroy all'copies of the
message that you.0 have received, including printed or other backup copies of the message e and any attachments Unauthorized copying, storage, forty r fin , and
dissemination of this message Or any atiaChnlentS are strictly prohibited Ali rights are expressly reserved.
On Nov 2, 2023, at 1:45 PM, Randy Garcia rand @ppe-sd. eo wrote:
Luca.,
Will do!
Thank you
Randy Garcia
Project Manager
Project Professionals Corporation
4700 Spring Street, Suite 100
La Mesa, CA 91942
Office: 858.63 .8180
Mobile: 805,624.2225
ppc-sd,corn
NOTICE. 1 fE 1PfENT_ This email and Its contents are protected under attorney -client privilege and may he attorney work product. If you
are not the intended recipient or an authorized agent of the recipient. immmedrately inform the -sender via email or call at 858.634.8180
and permanently destroy all copies of the message that_ you have receiVed_ including printed or other l' a krrp copies of the message and
any aftachi`r ertts Unauthorized copying. storage, forwarding and disserrunation of this message or any attachments are strictly
prohibited_ Al rights are expressly reserved_
1
On Nov L 2023. t 4:48 PM, Luca Zappiello <1 a ► i 1l ati n 1cit . ov
wrote:
Thank you Randy{
For future Co, please send the
Luca
request directly to PWEInvoices_@nationalcitvca.gov.
From:Randy Garcia <randv@ppc-sd.co_ >
Sent: Thursday, October 6, 2023 3:52 PM
To: Luca Zappiello Iappie llo@natio naicitrn.ov>
Cc: Josh Johnson josh ppc-sd.com>; Mercedes Munoz mercedes@ppc-sd.corrt
Subject: NC Street Resurfacing - Change Order
CAUTION. This email originated from outside your organization.
Exercise
opening attachments or clicking links, especially from u nknown senders.
Hello Luca,
caution when
Please review the attaches change order #14. This change order accounts for all of the
line item adjustments throughout the project. Please let us know if you have any
questions.
Randy Garcia
Project Manager
Project Professionals Corporation
4700 Spring Street, Suite too
La Mesa, CA. 1 42
Office: 858.634.8180
Mobile: 805.6242225
p.p - d.com
NOTICE. TO F E IPIEN i . This email and its contents are protected underattorney-chi .raj_ privilege and may be attorney
r product, If you are not the intended recipient or n authorized- agent of the recipient, immediately inform the
sender via email or call at 858 B34 81 and permanently destroy all copies of the message that you have received.
including printed or other backup copies of the- message and any attachments, Unauthorized .COPyiI1g
Storageforwarding and dissemination of this Hues -;gage or -any attachments aare-Strictly prohibited i'kll rights
are expressly reserved