HomeMy WebLinkAboutCC RESO 15,870RESOLUTION NO. 15,870
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL
CITY AUTHORIZING THE MAYOR TO EXECUTE AN APPLICATION AND
ALL OTHER NECESSARY DOCUMENTS FOR A LOAN FROM THE
CALIFORNIA ENERGY COMMISSION TO CONVERT THE EXISTING
STREETLIGHT SYSTEM TO ENERGY EFFICIENT LAMPS
WHEREAS, the California Energy Commission has developed
a Streetlight Conversion Loan Program to provide loans to local
governments and special districts to convert existing inefficient
streetlight systems to ones using high efficieny lamps.
NOW THEREFORE, BE IT RESOLVED, that the National City
Council authorizes Mayor George H. Waters to apply for a loan
from the California Energy Commission to convert to energy
efficient lamps.
BE IT FURTHER RESOLVED, that if recommended for funding
by the California Energy Commission, the National City Council
authorizes Mayor Waters to accept a loan up to the amount of this
application for $38,590.00.
BE IT FURTHER RESOLVED, that the amount of the loan
will be paid in full, plus interest, under the terms and
conditions of the loan agreement and promissory note with the
California Energy Commission.
BE IT FURTHER RESOLVED, that Mayor George H. Waters is
hereby authorized and empowered to execute in the name of the
National City Council all the necessary documents to implement
and carry out the purposes of this resolution.
PASSED and ADOPTED this 7th day of February, 1989.
ATTEST:
I ANNE ITY
CLE
RK
PEOPLES,
APPROVED AS TO
GEORGE
e
GEORGE H. WATERS, MAYOR
EISER, III -CITY ATTORNEY
Streetlight Conversion Loan Application
I. APPLICANT INFORMATION
Name of Organization City of National City
Mailing Address 1243 National City Blvd.
Street Address same
City National City
State CA zip 92050
II. SYSTEM INFORMATION
Name of Utility Supplying Power San Diego Gas and Electric
For Leased Streetlight Systems:
Owner Of Streetlight System N/A
Term Of Lease: From
To
(Month)
(Day)
(Year)
(Month)
(Day)
(Year)
III. SUMMARY OF TOTAL STREETLIGHT CONVERSION COST
1. Labor
2. Engineering/Design
3 Construction/Improvement Fees
4 Materials (specify)
104 HPSV lamps, ballasts and heads
5. Inspection Fees
6. Removal Fees (if applicable)
7. Other (specify)
8. PROJECT TOTAL
9. Local Government or Special District Funds
Appropriated for Project (if available)
10. STATE LOAN FUNDS REQUESTED
$15,000
4,000
none
19,590
none
none
38,590
38,590
4
IV. PROJECT SCHEDULE
Installation of all projects must be completed by March 31,1992.
1. Estimated Project Start Date
1 January 1990
2. Estimated Project Completion Date 1 January 1991
Authorized Representative
The undersigned acknowledges that it is a crime
punishable by fine or imprisonment or both, to
knowingly make any false statements concerning any of
the information in this application:
Edward Donnelly a-07 `7f4
Name (Type or Print) Signature
Deputy Public Works Director 619- 336-4360
Title Phone Number
31 January 1989
Date
Contact Person
Identify a contact person for the project if it is different than the authorized
representative shown above.
Edward Donnelly
619 - 336-4360
Name (Type or Print) Phone Number
For Commission Use Only
Senate District
Assembly District
FORM SL-3
STREETLIGHT CONVERSION SUMMARY FORM
Annual System Cost
I
Cirr"uit
Type
II
Lamp
Type
III
Lamp
Wattage
IV
Ballast
Wattage
V
Conversion
CosULamp
VI
Operating
Hours/Year
VII
Electricity
Cost/Year/Lamp
VIII
Number of
Lamps
IX
Electricty
Cost
(VII x VIII)
X
Electricity
Cost
Savings
XI
Total System
Conversion Cost
(V x VIII)
Existing
M
MV
175
35
4165
58.56
25
1464.00
4.
Proposed
Conversion
M
HPS
100
21
350
4165
39.24
25
981.00
483.00
8750.00
Existing
M
MV
400
60
KA� "';;
4165
128.16
77
9868 .32�
•
✓.�•
Proposed
Conversion
M
HPS
200
36
W
380
4165
68.52
77
5276.04
4592.28
29260.00
Existing
M
I
400
52
'01* Fry"('F%:
. , .44
4165
97.32
2
194.64
,,,,��f'f{: i':F::Fi': nib{Y
t; ;
Proposed
Conversion
M
HPS
70
15
290
4165
28.20
2
56.40
138.24
580.00
Existing.,,
y
Proposed
Conversion
Existing
: ++ .
Proposed
Conversion
Existing
4,/
++u+
Proposed
Conversion
Applicant: City of National City
Total Electricity Cost Savings: $ 5 213 .5 2
Total Conversion Cost: $ 3 8, 5 9 0