Loading...
HomeMy WebLinkAboutCC RESO 15,870RESOLUTION NO. 15,870 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY AUTHORIZING THE MAYOR TO EXECUTE AN APPLICATION AND ALL OTHER NECESSARY DOCUMENTS FOR A LOAN FROM THE CALIFORNIA ENERGY COMMISSION TO CONVERT THE EXISTING STREETLIGHT SYSTEM TO ENERGY EFFICIENT LAMPS WHEREAS, the California Energy Commission has developed a Streetlight Conversion Loan Program to provide loans to local governments and special districts to convert existing inefficient streetlight systems to ones using high efficieny lamps. NOW THEREFORE, BE IT RESOLVED, that the National City Council authorizes Mayor George H. Waters to apply for a loan from the California Energy Commission to convert to energy efficient lamps. BE IT FURTHER RESOLVED, that if recommended for funding by the California Energy Commission, the National City Council authorizes Mayor Waters to accept a loan up to the amount of this application for $38,590.00. BE IT FURTHER RESOLVED, that the amount of the loan will be paid in full, plus interest, under the terms and conditions of the loan agreement and promissory note with the California Energy Commission. BE IT FURTHER RESOLVED, that Mayor George H. Waters is hereby authorized and empowered to execute in the name of the National City Council all the necessary documents to implement and carry out the purposes of this resolution. PASSED and ADOPTED this 7th day of February, 1989. ATTEST: I ANNE ITY CLE RK PEOPLES, APPROVED AS TO GEORGE e GEORGE H. WATERS, MAYOR EISER, III -CITY ATTORNEY Streetlight Conversion Loan Application I. APPLICANT INFORMATION Name of Organization City of National City Mailing Address 1243 National City Blvd. Street Address same City National City State CA zip 92050 II. SYSTEM INFORMATION Name of Utility Supplying Power San Diego Gas and Electric For Leased Streetlight Systems: Owner Of Streetlight System N/A Term Of Lease: From To (Month) (Day) (Year) (Month) (Day) (Year) III. SUMMARY OF TOTAL STREETLIGHT CONVERSION COST 1. Labor 2. Engineering/Design 3 Construction/Improvement Fees 4 Materials (specify) 104 HPSV lamps, ballasts and heads 5. Inspection Fees 6. Removal Fees (if applicable) 7. Other (specify) 8. PROJECT TOTAL 9. Local Government or Special District Funds Appropriated for Project (if available) 10. STATE LOAN FUNDS REQUESTED $15,000 4,000 none 19,590 none none 38,590 38,590 4 IV. PROJECT SCHEDULE Installation of all projects must be completed by March 31,1992. 1. Estimated Project Start Date 1 January 1990 2. Estimated Project Completion Date 1 January 1991 Authorized Representative The undersigned acknowledges that it is a crime punishable by fine or imprisonment or both, to knowingly make any false statements concerning any of the information in this application: Edward Donnelly a-07 `7f4 Name (Type or Print) Signature Deputy Public Works Director 619- 336-4360 Title Phone Number 31 January 1989 Date Contact Person Identify a contact person for the project if it is different than the authorized representative shown above. Edward Donnelly 619 - 336-4360 Name (Type or Print) Phone Number For Commission Use Only Senate District Assembly District FORM SL-3 STREETLIGHT CONVERSION SUMMARY FORM Annual System Cost I Cirr"uit Type II Lamp Type III Lamp Wattage IV Ballast Wattage V Conversion CosULamp VI Operating Hours/Year VII Electricity Cost/Year/Lamp VIII Number of Lamps IX Electricty Cost (VII x VIII) X Electricity Cost Savings XI Total System Conversion Cost (V x VIII) Existing M MV 175 35 4165 58.56 25 1464.00 4. Proposed Conversion M HPS 100 21 350 4165 39.24 25 981.00 483.00 8750.00 Existing M MV 400 60 KA� "';; 4165 128.16 77 9868 .32� • ✓.�• Proposed Conversion M HPS 200 36 W 380 4165 68.52 77 5276.04 4592.28 29260.00 Existing M I 400 52 '01* Fry"('F%: . , .44 4165 97.32 2 194.64 ,,,,��f'f{: i':F::Fi': nib{Y t; ; Proposed Conversion M HPS 70 15 290 4165 28.20 2 56.40 138.24 580.00 Existing.,, y Proposed Conversion Existing : ++ . Proposed Conversion Existing 4,/ ++u+ Proposed Conversion Applicant: City of National City Total Electricity Cost Savings: $ 5 213 .5 2 Total Conversion Cost: $ 3 8, 5 9 0