HomeMy WebLinkAboutCC RESO 15,945RESOLUTION NO. 15,945
A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF NATIONAL CITY, CALIFORNIA, CERTIFYING THE FINAL
ENVIRONMENTAL IMPACT REPORT PREPARED FOR THE BONITA MEADOWS
SUBDIVISION (S-1-87) AND PLANNED UNIT DEVELOPMENT (PUD-1-87)
REQUESTED BY SEYMOUR OSTROW
(CASE FILE NO. IS-87-15)
WHEREAS, a Draft Environmental Impact Report (EIR) was prepared in
accordance with the California Environmental Quality Act (CEQA), the State CEQA
Guidelines and the National City Environmental Guidelines; and
WHEREAS, a public notice of the availability of the draft EIR,
designating a 30-day public review period ending on October 28, 1988 was
provided in accordance with Section 21092 of the Public Resources Cute of the
State of California; and
WHEREAS, a final EIR was prepared in accordance with CEQA, State CEQA
Guidelines and the National City Environmental Guidelines, and consists of the
draft EIR, the list of individuals, organizations or agencies commenting on the
draft EIR, comments received on the draft EIR and responses to comments; and
WHEREAS, on March 6, 1989 the Planning Commission held a duly noticed
public hearing and considered the final EIR, at which time staff reported on the
major issues, significant impacts and mitigations, as well as comments received
fiuu individuals, organizations, and public agencies on the draft EIR and the
responses given thereto; and
WHEREAS, the Planning Commission heard public testimony on the final EIR
and adequately addressed such testimony; and
WHEREAS, the final EIR identified certain significant environmental
impacts requiring mitigation at the development stage; and
WHEREAS, the Planning Commission found that changes or alterations have
been required in, or incoipurated into, the proposed project, which mitigate or
avoid the significant environmental effects thereof as identified in the final
EIR; and
WHEREAS, the Planning Commission found that the proposed (revised)
project, and originally proposed project, would have significant but mitigated
effects in the areas of noise, aesthetic/visual character, landform, hydrology
and biology as explained in the Planning Department Report to the City Planning
Commission regarding Case File No. IS-87-15 dated March 6, 1989; and
WHEREAS, the Planning Commission certified that the final EIR has been
completed in compliance with the requirements of the California Environmental
Quality Act (CEQA), State CEQA Guidelines and National City Environmental
Guidelines; and
WHEREAS, the Planning Commission recommended that the City Council,
having final approval authority over the project, make the above findings, and
adopt the explanation of findings, certify that the final EIR has been completed
in compliance with CEQA, the State CEQA Guidelines, and National City
Environmental Guidelines, and review and consider the information contained in
the EIR prior to rendering the final decision on project approval, and
WHEREAS, the City Council has considered the Final Environmental Impact
Report and environmental findings and recommendations of the Planning
Cbnmission;
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of
National City, California, finds that changes or alterations have been required
in, or incorporated into, the proposed project, which mitigate or avoid the
significant environmental
effects thereof as identified in the final EIR; and
BE IT FURTHER RESOLVED that the City Council finds that the proposed
(revised) project, and originally proposed project, would have significant but
mitigated effects in the areas of noise, aesthetic/visual character, landform,
hydrology and biology as explained in the Planning Department Report to the City
Planning Caurnission regarding Case File No. IS-87-15 dated March 6, 1989;
attached and made a part hereof as Exhibit "A"; and
BE IT FINALLY RESOLVED that the City Council certifies that the final EIR
has been cumpleted in compliance with the requirements of the California
Environmental Quality Act Law, State CEQA Guidelines and National City
Environmental Guidelines.
PASSED AND ADOPTED this 18th day of April, 1989.
,t-e� tc ILL- C.c —
GEORGE H. WATERS, MAYOR
ATTEST:
LOR
ANNE PEOPLES, ITY CLERK
APPROVED AS TO FORM:
GEO}7GE H. EISER, III -CITY ATTORNEY
EXPLANATICti OF ENVIRCRENTAL FINDINX TO BE ADOPIED
wrix C ERTIFICATICN OF THE FINAL EIR
NOISE
The southern and eastern boundaries of the project are adjacent to
Sweetwater Road and proposed Reo Drive, respectively. Expected noise
levels from traffic on adjacent roadways will exceed levels permitted in
the City's noise ordinance for single-family residential use. The results
of the noise study indicate that the average hourly sound levels of 60 dBA
or more will occur within 176 ft. fran the centerlines of Sweetwater Road
and Reo Drive.
Required conditions (mitigation):
a. Sound attenuation walls or berms along the eastern and southern
property lines, varying fran 2 ft. to 8 ft. in height, based on an
acoustical study, shall be constructed to reduce traffic noise to
acceptable levels of 60 dBA or less for outdoor yard areas.
b. An acoustical study shall be submitted with building plans to
determine and provide adequate noise attenuation, i.e. maximum
interior noise levels of 45 (MA fran 10 p.m. to 7 a.m. and otherwise
55 dBA for residences within the 176 ft. distance from the centerlines
of Sweetwater Road and Reo Drive, consistent with the City's noise
ordinance.
2. AESTHETIC/VISUAL CHARACTER
The dhange from a vacant field with grasses and eucalyptus trees to
residential development with the permitted density of one detached dwelling
per 5,000 sq.ft. will alter the app.arance of the property. Immediately
to the west of the site is a church, and a 114 unit condominium project on
16.42 acres. TO the south across Sweetwater Road are single-family
residences on minimum 5,000 sq.ft. lots and vacant property. The area to
the east, located in the County and primarily rural in character, is
developed with single-family residences. TO the north is a single-family
residence on a 3-acre parcel zoned RS-2-PUD.
Reo Drive is proposed for construction in the Circulation Element of the
City's General Plan. The original plans indicated portions of the project
site and property to the east in the County were to be dedicated for
construction of Reo Drive along the entire length of the project's easterly
boundary. Information received fran the County of San Diego requires
realignment of Reo Drive so that it is situated entirely within National
City. The plans have been revised showing the 74 ft. right-of-way located
entirely within the site. Relocation of Reo Drive has resulted in a
reduction of net buildable area. Therefore, the original proposal. of 47
units has been reduced to 45 units. This 74 ft. wide right-of-way will
separate the project from residences to the east in the County.
EXHIBIT A
Required mitigation:
Landscaping shall be provided to buffer the project from adjacent roadways
as well as to lessen visual impacts of the development to the rural
character of properties to the north and east. The landscape plan would be
subject to subsequent approval by the City. Conditions of approval for the
landscape plan should include planting of trees along the perimeter of the
site, planting of creeping vine along noise attenuation walls, and
landscaping treatment to identify the two entryways to the project.
3. /ANDEORM (GRADING, SDIL STABILITY)
The low lying portion of the site carries drainage from properties to the
north and northeast. Time central portion of the property is approximately
10-15 ft. below the grade of Sweetwater Road. Approximately 27,000 cubic
yards of fill is to be imported to raise the site. Approximately 8,000
cubic yards are to be cut. Because of the disturbed character of the site,
no archaeological artifacts are expected to be uncovered during grading.
The soils report, prepared by Geotechnical Exploration, Inc., indicates
groundwater was encountered at the surface of the site. Unsuitable soils
having a medium expansion potential were encountered in the upper 5 ft. of
the site. Recommended measures include the reworking and placement of
unsuitable soils to a minimum depth of 5 ft. below existing grade. A
minimum of 10 ft. of compacted fill, consisting of 5 ft. of reworked soils
below existing grade and 5 ft. of imported fill, will be placed beneath all
structures and improvements. Recommended measures in the soils report also
include specialized grading techniques and dewatering should groundwater -
saturated soils be encountered during excavation for the drainage channel.
All grading activities should be overseen by a qualified geotechnical
engineer.
Required mitigation:
Grading plans shall be submitted to the satisfaction of the City engineer
and incorporate necessary measures identified in the soils report prepared
by Geotechntcal Exploration, Inc., dated October 31, 1987, or other soils
report required by the City Engineer. All grading activities shall be
overseen by a cualified geotechnical engineer.
4. HYDROLOGY
The major portion of the low-lying site is affected by drainage from
properties to the northeast.
Proposed plans indicate an underground channel, 26 ft. in width, within a
35 ft. wide easement. It will be adequate for a 100-year flood. On -site
iraprovenents above the 35 ft. wide drainage easement include private
roadways, parking spaces, walkways, and a small pond. No buildings are
proposed over the easement. The Public Works Dept. has indicated that
underground channels are generally easier to maintain than open, uncovered
channels. Also, undergrounding the channel mitigates safety concerns for
accidental drownings as well as concerns for the dumping of debris, which
may occur with an open channel.
Required mitigation:
A covered channel with a capacity for carrying a 100 year flood shall be
constructed.
5. BIOLOGY
A biological survey was completed at the site on September 16, 1987. None
of the species identified in the survey were found to be classified as
rare, endangered or otherwise sensitive species. There is a small pond
along the central -eastern property line formed by channelized runoff fram
properties to the east. Drainage traverses the site from northeast to
southwest. Garments from the California Department of fish and Game
indicate that the small pond and drainage area is classified as wetlands.
As indicated in their comments, as wetland compensation plan is required to
avoid cc offset the net loss of wetland acreage and wetland habitat prior
to certification of the final EIR. In addition, they require notification
for diversion of drainage (natural flow) onsite after the project has been
approved. The applicant applied for a Department of the Army Permit with
the Army Corps of Engineers for proposed filling of the wetlands. The Army
Corps comments indicate that the project is covered under the nationwide
permit for discharge of fill into non -tidal wetlands; an individual permit
is not required. The verification of the nationwide permit requires
compliance with standard conditions and is valid for two years.
Removal of 45 eucalyptus trees from the southeastern portion of the site
will have a non -significant effect on biological resources. They will be
replaced by other trees with project landscaping.
Required mitigation:
a. The existing small pond located along the central -eastern property
line is to be replaced with a man-made pond along the south property
line, as indicated on proposed plans. A wetlands compensation plan
which precludes a net loss of both wetland acreage and wetland habitat
values has be approved to the satisfaction of the California
Department of Fish and Game.
b. A Streambed Alteration Permit for alteration of on site drainage
obtained frau the Department of Fish and Game after the project is
approved.
c. Native riparian vegetation, including willow, sycamore and cottonwood
trees, shall be planted around the perimeter of the replacement pond
to replace wildlife habitat.
d. Related, native plant species shall be located in open space areas to
provide resource continuity throughout the project as recommended in
the biological survey report included in the Draft EIR as
attachment 4.
B. Non -significant Effects (Possible tiitigation)
6. Land Use
The project is a one -lot subdivision for 45 detached, single-
family oondaniniums, each with an attached 2-car garage. Access
and circulation within the site is provided by 24 ft. wide
private streets. Amenities include a pool, Jacuzzi, picnic and
barbecue area, children's playground, and a pond. 44 guest
parking spaces are provided; 25 of those spaces are on -site and
the remaining 19 spaces are on Sweetwater Road.
The net area of the site is 5.175 acres after dedications of
private streets within the project and Reo Drive (public right-of-
way). The proposed density is 1 unit per 5,009 sq.ft. or 8.7
dwelling units per acre. The proposed density is the maximum
that could be considered on the site, consistent with the RS-2-
PUD zone. The cne-lot subdivision involves the ormership of
airspace and a percentage (1/45) of the common area for each
condaniniva unit.
To the south across Sweetwater Road are single-family residences
constructed under the RS-2 designation (1 unit per 5,000
sq.ft.). TO the west of the project is a church on a 2.1 acre
parcel and 114 attached condaniniun units on 16.5 acres. TO the
east are single-family residences on large lots, minimum 1 acre
in size, located in the County. Adjacent to the north is a
single-family residence on a 3 acre parcel. Area to the east and
north of the site is rural in character with large trees and
mature landscaping. The site will provide a transition between
the attached condominium development to the west and the lower
density neighborhood to the east. Development of Reo Drive as a
74 ft. right-of-way will also provide a buffer to separate the
site fran properties to the east.
Recrninended mitigation: None
7. Traffic
The traffic study was prepared by Federhart and Associates. The
45 single-family, detached condominiums will be served by two 24
ft. wide private streets. Access to the site will be provided by
two intersections, one (existing) on Sweetwater Road at the
southwest corner of the site and the other on Reo Drive at the
northeast corner of the property. The Sweetwater Road
intersection exists as a private access easement for the church
located adjacent to the west.
Standard trip generation rates indicated in the San Diego Traffic
Generator's manual (SANDAG) are 10 average daily trips per
single-family residence. Therefore, the project's trip
generation is 450 average daily trips. The analysis addressed
short-term and long-term impacts to traffic in the project area.
Short-term traffic impacts address project traffic volumes prior
to the completion of the entire Reo Drive linkage to Route 54.
Long-term traffic impacts refer to project traffic volumes after
Reo Drive is constructed to connect with Route 54. Both short-
term and long -tern impacts were determined insignificant and
within the capacity of the street system. No short -tern irg:acts
to the level of service cr intersection capacity were identified
at the intersections of Sweetwater Road at Ring Road and proposed
Reo Drive at Route 54. An analysis of the Sweetwater Road and
proposed Reo Drive intersection indicates sight distance is
inadequate.
Recommended mitigation:
Recommended mitigation measures to reduce non -significant traffic
impacts include the following:
1. Widening of the private road at the Sweetwater Road
intersection north of Sweetwater Road to provide two
outbound and one inbound lane to mitigate potential delays
of outbound, right turn traffic caused by delays by
outbound, left turn traffic;
2. Full width improvements of the 74 ft. wide Reo Drive right-
of-way adjacent to the site including roadway, curb, gutter
and sidewalk;
3. Improvements to widen the northernhalf of Sweetwater Road,
including curb, gutter, sidewalk and parallel parking (19
off -site Guest parking spaces);
4. Signing and physical barriers to prohibit left turns onto
Sweetwater Road fran Reo Drive and onto Reo Drive fran
Sweetwater Road until Reo Drive is completed to Route 54 and
a traffic light is installed;
5. Payment by the developer of the project's share of costs, to
be determined by the Engineering Department, for
installation of the required traffic signal at the
intersection of Reo Drive and Sweetwater Road.
8. OJt• IUNITY FACILITIES AND CES
Comments received fran the Chula Vista School District (Elementary) and
Sweetwater Union High School District indicate that the development will
impact existing school facilities. The Chula Vista School District and
Sweetwater Union high School District expect the increase in enrollment to
be 13 and 14 students respectively. Payment of school fees or voluntary
agreement by the developer to participate in some other funding mechanism
will mitigate non -significant impacts to educational facilities. Payment
of fees will be verified during the building permit process.
Other community facilities and services are available. Water and sewer
facilities are available in the area with adequate capacity to serve the
project. No increase in police and fire department staff or equipaent is
necessary to serve the project. Gas and electric facilities can be
extended to the site from Sweetwater Road
Reamed Mitigation:
1. The developer shall contribute $8,000 toward the project's share of
costs for completed sewer improvements.