HomeMy WebLinkAbout1988 CC RESO 15,488RESOLUTION NO. 15,488
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY
ACCEPTING WORK AND AUTHORIZING FILING OF NOTICE OF COMPLETION
FOR LANDSCAPE BEAUTIFICATION - PLAZA BOULEVARD AND HIGHWAY 805,
ENGINEERING SPEC. 1005
BE IT RESOLVED by the City Council of the City of National City,
California, as follows:
It appearing to the satisfaction of the City Engineer that all
work required to be done by Landscape Irrigation Specialists, Inc., for
landscape beautification at Plaza Boulevard and Highway 805, has been
satisfactorily completed. The City Council of National City hereby accepts
said work and authorizes the filing of a Notice of Completion and orders
that payment for said work be made in accordance with said contract.
PASSED and ADOPTED this 5th day of January, 1988.
Gr Waters, Mayor
-- eo
Ar'r'EST:
Io - Campbell, City VClerk
APPROVED AS TO FORM:
George H. Eiser, III -City Attorney
RECORDING REQUESTED BY
/ 2 4743
`-a— %Zo S o
AFTER RECORDING MAIL TO
SPACE ABOVE FOR RECORDER'S USE ONLY
NOTICE OF COMPLETION
1. NOTICE IS HEREBY GIVEN, PURSUANT TO SECTION 3093 OF THE CIVIL CODE OF CALIFORNIA.
CITY OF NATIONAL...CITY
whose address is 1243 Nat.j Qnaj,---City- CA. 9.2.05.0
2. That the undersigned is an owner of the (fee) interest or estate in that real estate located
at "see below" in the City of National City County
of San Diego, State of California, more particularly described as:
Landscape Beautification at Plaza Boulevard and Highway 805
(Engineering Spec. 1005)
3. The street address of said property is None
(If no street address has been officially assigned, insert "none")
4. That the names and addresses of all co -owners of such estate and interest are:
CO -OWNERS NAMES ADDRESS
5. That a work of improvement was completed upon said real property on
6. That the contractor (if any) for such work of improvement was
Landscape Irrigation Specialists, Inc.
7. That such work of improvement was caused by the above named owners, or, in the event such work of
improvement was caused by predecessors to the above named owners their interest was transferred to
them from:
TRANSFERORS
ADDRESS
State of California
County of San Diego
SS:
The undersigned, being first duly sworn, deposes and says:
O That the undersigned is the owner of the above subscribed;
That the undersigned is one of the partners of the partnership owner above
subscribed: and on behalf of said partnership;
® That the undersigned is the .mavpo.r of the Corporation owner above
subscribed, and on behalf of s8id corporation;
and has read the foregoing notice and knows the contents thereof and that the
facts stated therein are true
Signature_.
FORGE 4i. WATERS, NAY -OR of -National City
SUBSCRIBED AND SWORN TO BEFORE ME. THIS 7.DAY OF
19..re
Public in anfo said Courkty nd State
2t�t Gz- 74.E s t
FOR NOTARY SEAL OR STAMP
Specification No.
Change Order No.
CO N'T:.ACT C:iA:;GE ORDEP,
1005
1 (ONE) REVISED
Date
October 21, 1987
PROJECT NO. 6045
Location
National City
Landscape Beautification - Plaza Blvd. and Hwy. 805
To: (Contractor)
You are hereby requested to comply with the following changes from the contract plans and
Specifications:
Item
No.
(1)
Description of changes --Quantities, Units,
Unit Prices, Change in Completion Schedule,
Etc.
(2)
Decrease in
Contract Price
(3)
Increase in
Contract Price
(4)
Deleted
Item
Extra
Work
•
BOLLARDS:
Delete installation of 52 Bollards, 435 ft.
chain, 92 Eye bolts, and 110 ft. Class 160
PVC Pipe.
L.S. @ $12,704.06
1. PIPING & TRENCHING
Provide and install 110'-6" steel pipe,
7'-6" steel coupling, 60'-2" PVC Class 315
pipe, 8-90 ELLS and 240 ft. No. 14
Control Device per Caltrans Standard trench
resurfacing plans.
2. MANHOLE COVERS:
Sanblasting, Cleaning and painting two -
manhole covers.
Total cost of extra work No. 1 & 2
is $1,627.26 L.S.
$12,704.06
$1,627.26
CoNT::ACT C:iA::GE ORDER
Specification No. 1005
Change Order No. 1 (ONE) REVISED
Date
October 21, 1987
PROJECT NO.
6045
Location National City
Landscape Beautification - Plaza Blvd. and Hwy 805
To: (Contractor) Landscape Irrigation Specialist, Inc. 15275 Olde Hwy 80 El Cajon, Ca 92021
You arc hereby requested to comply with the following changes from the contract plans and
Specifications:
[tem
No.
(1)
Description of changes --Quantities. Units,
Unit Prices, Change in Completion Schedule,
Etc.
(2)
Decrease in
Contract Price
(3)
Increase in
Contract Price
(4)
3. BACKFLOOD PREVENTION VALVE:
Provide and install two reduce pressure
Vacuim Breakers.
L.S. @ 382.00
4. WOOD STRIPS
Provide and install 3-2"x6" red wood strips
across the planted westerly. traffic island.
Wood strips shall be supported with stakes
and the soil between wood stripes shall be
graded to be leveled.
L.S. @ $250.00
JUSTIFICATION:
The deleted item and added item No. 1 were
done to conform with the conditions set
by Caltrans for the approval of the project
plans. Extra work item No. 2 was added to
the project for beautification purposes.
Extra work item No. 3 was added per
Sweetwater Authority's request to replace
the pressure Vacuum Breakers as specified
in the project plans with reduced pressure
Vacuum Breakers.
$382.00
$250.00
CONTRACT CHANGE ORDER
Specification No.
Change Order No.
1005
1 (ONE) REVISED
Landscape Beaufication - Plaza Blvd. and Hwy.
Date
October 21, 19887
PROJECT NO. 6045
Location
805
National City
To: (Contractor) Landscape Irrigation Specialist, Inc. 15275 Olde Hwy._80 El Cajon, Ca 92021
You are hereby requested to comply with the following changes from the contract plans
Specifications:
and
Item
No.
Description of changes --Quantities, Units,
Unit Prices, Change in Completion Schedule,
Etc.
(2)
Decrease in
Contract Price
(3)
Increase in
Contract Price
(4)
Extra work item No. 4 was added to eliminate
accumulation of rain and irrigation water
at the westerly end of the westerly traffic
island due to longitudinal profile of the,
island.
Change in contract price due to this
Change Order:
Total decrease
Total increase
Difference between Col. (3) and (4)
Net (increase)(decrease) contract price
..
$ 12.704 06
$ 2,259.26
$ 10,444.80
$ 10,444.80
The
and
sum of $ 10,444.80 is hereby adli*o, deducted from, the total contract price,
the total adjusted contract price to date thereby is $ 58,124.20
The time provided for completion in the contract is unchanged, irkc2}zased, dtsgenttd, by
.79' calendar days. This document shall become an amendment -to the contract and
. all provisions of the contract will apply hereto. The Contractor accepts this Change Order as
t4
full compensation
�diona1 wo % a any delay to the project caused by this Change Order.
• Accented by: CO- c./ / o ""'c,94 9 ?
` Recommended b
Dproved by:
tractor_
_..-4112541119110!-e A(
�r
% � y.,1/
N THE CO' PAC" " W B ALLOWED FIFTEEN (15) DAYS IN WHICH TO PROTEST IN WRITING THE
COR " CTNESS OF THE CHANGE ORDER; OTHERWISE THE CHANGE ORDER SHALL BE DEEMED TO HAVE
BE ACCEPTED BY THE CONTRACTOR AS CORRECT.
Date
//--
Date
//-//c'2
Date
"CERTIFIED MAIL"
Resolution No. 15,448 on Nov. 10, 1987'`