HomeMy WebLinkAboutCC RESO 15,651RESOLUTION NO. 15,651
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY
ADOPTING THE BUILDING VALUATIONS MULTIPLIERS FOR 1988-1989
WHEREAS, the San Diego Chapter of the International Conference of
Building Officials (I.C.B.O.) has prepared a Building Multiplier for the
1988/89 year; and
WHEREAS, the tables are prepared utilizing data contained in the
Building Standards Publication and data from the various jurisdictions in
San Diego County; and
TOPEREAS, the valuation standards are prepared each year to assure
construction cost valuations remain basically the same in all jurisdictions
within the county.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
National City that the San Diego Area Chapter, International Conference of
Building Officials, Proposed Building Valuation Multipliers for 1988-1989,
a copy of which is attached hereto as Exhibit "A", is hereby adopted.
PASSED and ADOPTED this 21st day of June, 1988.
ATTEST:
TONE
IONE
BY:
APP
CLERK
n a �,
H. EISER, III
CITY ATTORNEY
RGE ]� , MAYOR
EXHIBIT "A"
SAN DIEGO AREA CHAPTER
INTERNATIONAL CONFERENCE OF BUILDING OFFICIALS
PROPOSED BUILDING VALUATION MULTIPLIERS FOR 1988-1989
Occupancy and Type
Value
Per Sq Ft.
1988-1989
APARTMENT HOUSES:
*Type I or II-F.R. $ 77.00
Type V or III (Masonry) 60.00
Type V Wood Frame 57.00
Type I Basement Garage 26.00
BANKS:
*Type I or II-F.R. 103.00
Type II 1-Hour 75.00
Type II-N 72.00
Type III 1-Hour 85.00
Type III-N 81.00
Type V 1-Hour 75.00
Type V-N 72.00
CHURCHES:
Type I or II-F.R. 70.00
Type II 1-Hour 53.00
Type II-N 50.00
Type III 1-Hour 57.00
Type III-N 54.00
Type V 1-Hour 52.00
Type V-N 49.00
CONVALESCENT HOSPITALS:
*Type I or II-F.R. 97.00
Type III 1-Hour 70.00
Type V 1-Hour 64.00
DWELLINGS: ***
Type V Adobe 82.00
Type V Masonry 70.00
Type V Wood Frame 66.00
Basements (Non -habitable) 16.00
Additions - Wood Frame 66.00
Solariums 66.00
HOSPITALS:
*Type I or II-F.R.
Type III 1-Hour
Type V 1-Hour
113.00
95.00
89.00
Occupancy and Type
HOTELS & MOTELS:
*Type I or II-F.R.
Type III 1-Hour
Type III-N
Type V 1-Hour
Type V-N
Value
Per Sq Ft.
1988-1989
$ 72.00
63.00
60.00
55.00
53.00
INDUSTRIAL PLANTS:
Type I or II-F.R. 40.00
Type II 1-Hour 28.00
Type II (Stock) 27.00
Type III 1-Hour 31.00
Type III-N 29.00
Tilt -up 20.00
Type V 1-Hour 28.00
Type V-N 27.00
MEDICAL OFFICES:
*Type I or II-F.R.
Type II 1-Hour
Type II-N
Type III 1-Hour
Type III-N
Type V 1-Hour
Type V-N
85.00
63.00
60.00
69.00
66.00
64.00
61.00
OFFICES:
Type I or II-F.R. 75.00
Type II 1-Hour 49.00
Type II-N 47.00
Type III 1-Hour 54.00
Type III-N 51.00
Type V 1-Hour 50.00
Type V-N 48.00
PRIVATE GARAGES:
Wood Frame 17.00
Masonry 20.00
Open Carports 12.00
PUBLIC GARAGES:
*Type I or II-F.R.
Type II-N
Type III 1-Hour
Type III-N
Type V 1-Hour
34.00
20.00
24.00
23.00
21.00
Occupancy and Type
RESTAURANTS:
Type III 1-Hour
Type III-N
Type V 1-Hour
Type V-N
SCHOOLS:
Type I or II-F.R.
Type II 1-Hour
Type III 1-Hour
Type III-N
Type V 1-Hour
SERVICE STATIONS:
Value
Per Sq Ft.
1988-1989
$ 68.00
64.00
60.00
57.00
79.00
51.00
58.00
55.00
53.00
Type II-N 47.00
Type III 1-Hour 48.00
Type V 1-Hour 42.00
Canopies 18.00
STORES:
*Type I or II-F.R. 58.00
Type II 1-Hour 36.00
Type II-N 34.00
Type III 1-Hour 42.00
Type III-N 40.00
Type V 1-Hour 34.00
Type V-N 32.00
THEATRES:
Type I or II-F.R.
Type III 1-Hour
Type III-N
Type V 1-Hour
Type V-N
WAREHOUSES: **
Type I or II-F.R.
Type II 1-Hour
Type II-N
Type III 1-Hour
Type III-N
Type V 1-Hour
Type V-N
78.00
57.00
54.00
52.00
49.00
34.00
20.00
19.00
24.00
23.00
20.00
19.00
Occu2ancy and Ty2e
EQUIPMENT:
Air Conditioning (Commercial)
Air Conditioning (Residential)
Sprinkler Systems
BUILDING VALUATION DATA:
Value
Per Sq Ft.
1988-1989
2.80
2.40
1.50
The valuations shown were formulated by taking the unit cost
per square foot and multiplying it to a regional modifier
(1.00) and rounding off to the nearest dollar. This building
valuation data is contained in the January -February 1988 issue
of the Building Standards Magazine, published by the
International Conference of Building Officials.
*
**
* * *
Add 0.5 percent to the total cost for each story over
three
Deduct 11 percent for mini -warehouses.
For subdivisions with 10 or more single-family dwellings
which have plancheck and building permit issuances in
groups of 10 or more, the valuation may be decreased by 10
percent.
MISCELLANEOUS
ALTERATIONS TO EXISTING STRUCTURES:
Where no additional floor area or roof coverage is created,
such as the conversion of a patio or conversion of garages to
habitable rooms. etc., the valuation shall be determined as the
difference in valuations between the two occupancies.
AGRICULTURAL BUILDING $ 12.75 /sq.ft.
ALUMINUM SIDING 3.75 /sq.ft.
ANTENNAS
Radio, over 30 ft. in height
Dish, 10 ft. dia. w/decoder
AWNING OR CANOPY (supported by building)
Aluminum
Canvas
BALCONY
2,325.00 each
2,825.00 each
13.75 /sq.ft.
6.00 /sq.ft.
9.50 /sq.ft.
CLOSE EXTERIOR WALL OPENING 9.50 /sq.ft.
DECKS (Wood) $ 9.50 /sq.ft.
FENCE OR FREESTANDING WALL
Wood or Chain Link 1.25 /sq.ft.
Wire 1.25 /sq.ft.
Masonry 6.00 /sq.ft.
Wrought Iron 3.75 /sq.ft.
FIREPLACES
Concrete or Masonry
Prefabricated Metal
GREENHOUSE
INTERIOR PARTITION
INSTALL WINDOW OR
SLIDING GLASS DOOR
PATIO
Wood Frame with Cover
Metal Frame with Cover
Wood Frame - Cover and Walls
Metal Frame - Cover and Walls
Screen or Plastic Walls
PILE FOUNDATIONS
Cast -in -Place Concrete
Steel
2,325.00 each
1,575.00 each
3.75 /sq.ft.
32.00 /lin.ft.
10.00 /sq.ft.
6.00 /sq.ft.
7.50 /sq.ft.
8.50 /sq.ft.
9.50 /sq.ft.
2.00 /sq.ft.
14.25 /lin.ft.
34.25 /lin.ft.
PLASTERING
Inside 2.00 /sq.ft.
Outside 2.00 /sq.ft.
RETAINING WALL
Concrete or Masonry 11.50 /sq.ft.
REROOFING (1 square = 100 square feet)
Built-up 89.00 /sq.
Composition Shingles 82.50./sq.
Fiberglass Shingles 82.50 /sq.
Cement Shingles 195.00 /sq.
Wood Shingles 195.00 /sq.
Wood Shakes 195.00 /sq.
Aluminum Shingles 295.00 /sq.
Clay Tile 245.00 /sq.
Concrete Tile 210.00 /sq.
ROOF STRUCTURE REPLACEMENT $ 9.50 /sq.ft.
SAUNAS (Steam) 5,800.00 each
SHELL BUILDINGS
A shell building is defined as a building for which HVAC,
lighting, suspended ceilings, plumbing and electrical systems,
partition layouts and interior finish are not shown on the
plans and for which separate tenant improvement plans will be
submitted for plan check at a later date showing these items.
Warehouses and industrial buildings shall not be considered
shell buildings. The valuation for shell buildings shall be
taken as 80 percent of the valuation for the completed
building.
SIGNS
WALL
1 Face
PROJECTING
1 Face
2 Face
POLE
1 Face
2 Face
Non -Illuminated
$11 . 50 /sq.ft,.
16.50 /sq.ft.
24.25 /sq.ft.
17.25 /sq.ft.
24.25 /sq.ft.
Illuminated
$24.25 /sq.ft.
34.25 /sq.ft.
39.50 /sq.ft.
28.00 /sq.ft.
39.50 /sq.ft.
SUPPORTING STRUCTURE 39.50 /lin.ft.
SPA OR JACUZZI 4,750.00 each
STAIRS 9.50 /sq.ft.
SWIMMING POOL (per sq.ft. of surface area)
Vinyl lined 22.25 /sq.ft.
Gunite 24.25 /sq.ft.
Fiberglass 26.50 /sq.ft.
STONE AND BRICK VENEER 6.00 /sq.ft.
TENANT IMPROVEMENTS
The valuation of tenant improvements shall be $18.50 per sq.ft.
or the actual construction cost estimate.
MANUFACTURED HOUSING -
DEMOLITION OF BUILDING
AUTHORITY TO DETERMINE
The determination of
provisions of this
official. The value
permit and building
of all construction
ADDITIONAL ITEMS
25% of value for piece -built house
- $20.00 plus sewer cap permit
(when applicable)
VALUE - UBC Section 304
value or valuation under any of the
code shall be made by the building
to be used in computing the building
plan review fees shall be the total value
work for which the permit is issued, as
well as all finish work, painting, roofing, electrical,
plumbing, heating. air conditioning, elevators, fire -
extinguishing systems and any other permanent equipment.