Loading...
HomeMy WebLinkAboutCC RESO 15,651RESOLUTION NO. 15,651 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY ADOPTING THE BUILDING VALUATIONS MULTIPLIERS FOR 1988-1989 WHEREAS, the San Diego Chapter of the International Conference of Building Officials (I.C.B.O.) has prepared a Building Multiplier for the 1988/89 year; and WHEREAS, the tables are prepared utilizing data contained in the Building Standards Publication and data from the various jurisdictions in San Diego County; and TOPEREAS, the valuation standards are prepared each year to assure construction cost valuations remain basically the same in all jurisdictions within the county. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of National City that the San Diego Area Chapter, International Conference of Building Officials, Proposed Building Valuation Multipliers for 1988-1989, a copy of which is attached hereto as Exhibit "A", is hereby adopted. PASSED and ADOPTED this 21st day of June, 1988. ATTEST: TONE IONE BY: APP CLERK n a �, H. EISER, III CITY ATTORNEY RGE ]� , MAYOR EXHIBIT "A" SAN DIEGO AREA CHAPTER INTERNATIONAL CONFERENCE OF BUILDING OFFICIALS PROPOSED BUILDING VALUATION MULTIPLIERS FOR 1988-1989 Occupancy and Type Value Per Sq Ft. 1988-1989 APARTMENT HOUSES: *Type I or II-F.R. $ 77.00 Type V or III (Masonry) 60.00 Type V Wood Frame 57.00 Type I Basement Garage 26.00 BANKS: *Type I or II-F.R. 103.00 Type II 1-Hour 75.00 Type II-N 72.00 Type III 1-Hour 85.00 Type III-N 81.00 Type V 1-Hour 75.00 Type V-N 72.00 CHURCHES: Type I or II-F.R. 70.00 Type II 1-Hour 53.00 Type II-N 50.00 Type III 1-Hour 57.00 Type III-N 54.00 Type V 1-Hour 52.00 Type V-N 49.00 CONVALESCENT HOSPITALS: *Type I or II-F.R. 97.00 Type III 1-Hour 70.00 Type V 1-Hour 64.00 DWELLINGS: *** Type V Adobe 82.00 Type V Masonry 70.00 Type V Wood Frame 66.00 Basements (Non -habitable) 16.00 Additions - Wood Frame 66.00 Solariums 66.00 HOSPITALS: *Type I or II-F.R. Type III 1-Hour Type V 1-Hour 113.00 95.00 89.00 Occupancy and Type HOTELS & MOTELS: *Type I or II-F.R. Type III 1-Hour Type III-N Type V 1-Hour Type V-N Value Per Sq Ft. 1988-1989 $ 72.00 63.00 60.00 55.00 53.00 INDUSTRIAL PLANTS: Type I or II-F.R. 40.00 Type II 1-Hour 28.00 Type II (Stock) 27.00 Type III 1-Hour 31.00 Type III-N 29.00 Tilt -up 20.00 Type V 1-Hour 28.00 Type V-N 27.00 MEDICAL OFFICES: *Type I or II-F.R. Type II 1-Hour Type II-N Type III 1-Hour Type III-N Type V 1-Hour Type V-N 85.00 63.00 60.00 69.00 66.00 64.00 61.00 OFFICES: Type I or II-F.R. 75.00 Type II 1-Hour 49.00 Type II-N 47.00 Type III 1-Hour 54.00 Type III-N 51.00 Type V 1-Hour 50.00 Type V-N 48.00 PRIVATE GARAGES: Wood Frame 17.00 Masonry 20.00 Open Carports 12.00 PUBLIC GARAGES: *Type I or II-F.R. Type II-N Type III 1-Hour Type III-N Type V 1-Hour 34.00 20.00 24.00 23.00 21.00 Occupancy and Type RESTAURANTS: Type III 1-Hour Type III-N Type V 1-Hour Type V-N SCHOOLS: Type I or II-F.R. Type II 1-Hour Type III 1-Hour Type III-N Type V 1-Hour SERVICE STATIONS: Value Per Sq Ft. 1988-1989 $ 68.00 64.00 60.00 57.00 79.00 51.00 58.00 55.00 53.00 Type II-N 47.00 Type III 1-Hour 48.00 Type V 1-Hour 42.00 Canopies 18.00 STORES: *Type I or II-F.R. 58.00 Type II 1-Hour 36.00 Type II-N 34.00 Type III 1-Hour 42.00 Type III-N 40.00 Type V 1-Hour 34.00 Type V-N 32.00 THEATRES: Type I or II-F.R. Type III 1-Hour Type III-N Type V 1-Hour Type V-N WAREHOUSES: ** Type I or II-F.R. Type II 1-Hour Type II-N Type III 1-Hour Type III-N Type V 1-Hour Type V-N 78.00 57.00 54.00 52.00 49.00 34.00 20.00 19.00 24.00 23.00 20.00 19.00 Occu2ancy and Ty2e EQUIPMENT: Air Conditioning (Commercial) Air Conditioning (Residential) Sprinkler Systems BUILDING VALUATION DATA: Value Per Sq Ft. 1988-1989 2.80 2.40 1.50 The valuations shown were formulated by taking the unit cost per square foot and multiplying it to a regional modifier (1.00) and rounding off to the nearest dollar. This building valuation data is contained in the January -February 1988 issue of the Building Standards Magazine, published by the International Conference of Building Officials. * ** * * * Add 0.5 percent to the total cost for each story over three Deduct 11 percent for mini -warehouses. For subdivisions with 10 or more single-family dwellings which have plancheck and building permit issuances in groups of 10 or more, the valuation may be decreased by 10 percent. MISCELLANEOUS ALTERATIONS TO EXISTING STRUCTURES: Where no additional floor area or roof coverage is created, such as the conversion of a patio or conversion of garages to habitable rooms. etc., the valuation shall be determined as the difference in valuations between the two occupancies. AGRICULTURAL BUILDING $ 12.75 /sq.ft. ALUMINUM SIDING 3.75 /sq.ft. ANTENNAS Radio, over 30 ft. in height Dish, 10 ft. dia. w/decoder AWNING OR CANOPY (supported by building) Aluminum Canvas BALCONY 2,325.00 each 2,825.00 each 13.75 /sq.ft. 6.00 /sq.ft. 9.50 /sq.ft. CLOSE EXTERIOR WALL OPENING 9.50 /sq.ft. DECKS (Wood) $ 9.50 /sq.ft. FENCE OR FREESTANDING WALL Wood or Chain Link 1.25 /sq.ft. Wire 1.25 /sq.ft. Masonry 6.00 /sq.ft. Wrought Iron 3.75 /sq.ft. FIREPLACES Concrete or Masonry Prefabricated Metal GREENHOUSE INTERIOR PARTITION INSTALL WINDOW OR SLIDING GLASS DOOR PATIO Wood Frame with Cover Metal Frame with Cover Wood Frame - Cover and Walls Metal Frame - Cover and Walls Screen or Plastic Walls PILE FOUNDATIONS Cast -in -Place Concrete Steel 2,325.00 each 1,575.00 each 3.75 /sq.ft. 32.00 /lin.ft. 10.00 /sq.ft. 6.00 /sq.ft. 7.50 /sq.ft. 8.50 /sq.ft. 9.50 /sq.ft. 2.00 /sq.ft. 14.25 /lin.ft. 34.25 /lin.ft. PLASTERING Inside 2.00 /sq.ft. Outside 2.00 /sq.ft. RETAINING WALL Concrete or Masonry 11.50 /sq.ft. REROOFING (1 square = 100 square feet) Built-up 89.00 /sq. Composition Shingles 82.50./sq. Fiberglass Shingles 82.50 /sq. Cement Shingles 195.00 /sq. Wood Shingles 195.00 /sq. Wood Shakes 195.00 /sq. Aluminum Shingles 295.00 /sq. Clay Tile 245.00 /sq. Concrete Tile 210.00 /sq. ROOF STRUCTURE REPLACEMENT $ 9.50 /sq.ft. SAUNAS (Steam) 5,800.00 each SHELL BUILDINGS A shell building is defined as a building for which HVAC, lighting, suspended ceilings, plumbing and electrical systems, partition layouts and interior finish are not shown on the plans and for which separate tenant improvement plans will be submitted for plan check at a later date showing these items. Warehouses and industrial buildings shall not be considered shell buildings. The valuation for shell buildings shall be taken as 80 percent of the valuation for the completed building. SIGNS WALL 1 Face PROJECTING 1 Face 2 Face POLE 1 Face 2 Face Non -Illuminated $11 . 50 /sq.ft,. 16.50 /sq.ft. 24.25 /sq.ft. 17.25 /sq.ft. 24.25 /sq.ft. Illuminated $24.25 /sq.ft. 34.25 /sq.ft. 39.50 /sq.ft. 28.00 /sq.ft. 39.50 /sq.ft. SUPPORTING STRUCTURE 39.50 /lin.ft. SPA OR JACUZZI 4,750.00 each STAIRS 9.50 /sq.ft. SWIMMING POOL (per sq.ft. of surface area) Vinyl lined 22.25 /sq.ft. Gunite 24.25 /sq.ft. Fiberglass 26.50 /sq.ft. STONE AND BRICK VENEER 6.00 /sq.ft. TENANT IMPROVEMENTS The valuation of tenant improvements shall be $18.50 per sq.ft. or the actual construction cost estimate. MANUFACTURED HOUSING - DEMOLITION OF BUILDING AUTHORITY TO DETERMINE The determination of provisions of this official. The value permit and building of all construction ADDITIONAL ITEMS 25% of value for piece -built house - $20.00 plus sewer cap permit (when applicable) VALUE - UBC Section 304 value or valuation under any of the code shall be made by the building to be used in computing the building plan review fees shall be the total value work for which the permit is issued, as well as all finish work, painting, roofing, electrical, plumbing, heating. air conditioning, elevators, fire - extinguishing systems and any other permanent equipment.