Loading...
HomeMy WebLinkAboutCC RESO 15,448RESOLUTION NO. 15,448 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY APPROVING CHANGE ORDER NO. ONE FOR LANDSCAPE BEAUTIFICATION - PLAZA BOULEVARD AND HIGHWAY 805. (ENG. SPEC. NO. 1005) BE IT RESOLVED by the City Council of the City of National City that, pursuant to Resolution No. 13,924, Change Order No. One in the amount of $10,444.80 is hereby approved for Landscape Beautification - Plaza Boulevard and Highway 805. (Eng. Spec. No. 1005). PASSED and ADOPTED this loth day of November, 1987. George . Waters, Mayor ATTEST: Campbell, City Cl-•' k APPROVED AS '10 FORM: 4L. George H. Eiser, III - City Attorney Specification No. Change Order No. CO:rr:.ACT C:IA:.GE ORDER 1005 1 (ONE) REVISED Date October 21, 1987 PROJCCT NO. 6045 Location National City Landscape Beautification - Plaza Blvd. and Hwy. 805 To: (Contractor) You are hereby requested to comply with the following changes from the contract plans. and Specifications: Item No. (1) Description of changes --Quantities, Units, Unit Prices, Change in Completion Schedule, Etc. (2) Decrease in Contract Price (3) Increase in Contract Price (4) Deleted Item Extra Work BOLLARDS: Delete installation of 52 Bollards, 435 ft. chain, 92 Eye bolts, and 110 ft. Class 160 PVC Pipe. L.S. @ $12,704.06 1. PIPING & TRENCHING Provide and install 110'-6"steel pipe, 7'-6" steel coupling, 60'-2" PVC Class 315 pipe, 8-90 ELLS and 240 ft. No. 14 Control Device per Caltrans Standard trench resurfacing plans. 2. MANHOLE COVERS: Sanblasting, Cleaning and painting two• manhole covers. Total cost of extra workNo. 1 & 2 is $1,627.26 L.S. $12,704.06 $1,627.26 . •�.cm— Specification No. Change Order No. 1 (ONE) REVISED co: r::.1Cr C: A ;GE ORDEP. 1005 Date October 21, 1987 PROJ::CT NO. Location Landscape Beautification - Plaza Blvd. and Hwy 805 6045 National City To: (Contractor) Landscape Irrigation Specialist, Inc. 15275 Olde Hwy 80 El Cajon, Ca 92021 You arc hereby requested to comely with the following changes from the contract plans and Specifications: Item No. (1) Description of changes --Quantities, Units, Unit Prices, Change in Completion Schedule, Etc. (2) Decrease in Contract Price (3) Increase in Contract Price (4) • 3. -BACKFLOOD PREVENTION VALVE: Provide and install two reduce pressure Vacuim Breakers. L.S. @ 382.00 4. WOOD STRIPS Provide and install 3-2"x6" red wood strips across the planted westerly. traffic island. Wood strips shall be supported with stakes and the soil between wood stripes shall be graded to be leveled. L.S. @ $250.00 JUSTIFICATION: The deleted item and added item No. 1 were done to conform with the conditions set by Caltrans for the approval of the project plans. Extra work item No. 2 was added to the project for beautification purposes. Extra work item No. 3 was added per Sweetwater Authority's request to replace the pressure Vacuum Breakers as specified in the project plans with reduced pressure Vacuum Breakers. $382.00 $250.00 CoNT: AGT CHANGE ORDER Specification No. Change Order No. 1005 1 (ONE) REVISED Date October 21, 19887 PROJECT NO, 6045 Location Landscape Beaufication - Plaza Blvd. and Hwy. 805 National City To: (Contractor) Landscape Irrigation Specialist, Inc. 15275 0lde Hwy._80 El Cajon, Ca 92021 You are hereby requested to comply with the following changes from the contract plans Specifications: and Item No. (1) Description of changes --Quantities, Units, Unit Prices, Change in Completion Schedule, Etc. (2) Decrease in Contract Price (3) Extra work item No. 4 was added to eliminate accumulation of rain and irrigation water at the westerly end of the westerly traffic island due to longitudinal profile of the island. Change in contract price d-ue to fEis Change Order: Total decrease Total increase Difference between Col. (3) and (4) Net (increase)(decrease) contract price $ 12.704.06 XXXIOCCOCCCOCLX:CCX $' Increase in Contract Price (4) X CCCCCC.,CCXX $ 2,259.26 $ 10,444.80 $ 10,444.80 The sum of $ 10,444.80 is hereby�S�d.o ad, deducted from, the total contract price, and the total adjusted contract price to date thereby is $ 58,124.20 The time provided for completion in the contract is unchanged, tad, d �, eacsoby calendar days. This document shall become an amendment -to the contract and provisions of the contract will apply hereto. The Contractor accepts thks Change Order as rknd any delay to the project caused by this Change Order. • all full compensation dditional Accented by: (kJ iCont:act� Recommended by,: ©/ Date NOTE: THE CONT I L - D FIFTEEN (15) DAYS IN WHICH TO PROTEST IN WRITING THE CORRECT SS OF THE CHANGE ORDER; OTHERWISE THE CHANGE ORDER SHALL BE DEEMED TO HAVE BEEN 'CEPTED BY THE CONTRACTOR AS CORRECT. Approved by: Date ate "CERTIFIED MAIL"