Loading...
HomeMy WebLinkAboutCC RESO 15,475RESOLUTION NO. 15,475 RESOLUTION OF 'nit CITY COUNCIL OF THE CITY OF NATIONAL CITY ACCEPTING WORK AND AUTHORIZING FILING OF NOTICE OF COMPLETION OF INSTALLATION OF AIR CONDITIONING FOR PUBLIC LIBRARY BASEMENT. ENGINEERING SPEC. NO. 999. BE IT RESOLVED by the City Council of the City of National City, California, as follows: It appearing to the satisfaction of the City Engineer that all work required to be done by San Diego Builders for installation of air conditioning for Public Library basement, Engineering Specification No. 999, has been satisfactorily completed, the City Council of National City hereby accepts said work and authorizes the filing of a Notice of Completion and orders that payment for said work be made in accordance with said contract. PASSED and ADOPTED this 15th day of December, 1987. George Waters, Mayor A'rrJ T: Ioije Campbell, CitClerk APPROVED AS TO FORM: George H. Eiser, III -City Attorney RECORDING REQUESTED BY AFTER RECORDING MAIL TO CITY CLERK C1TY..QF._NAIIO.FIAL.CITY 1243 NATIONAL AVENUE NATIONAL CITY, CALIFORNIA 92050 SPACE ABOVE FOR RECORDER'S USE ONLY NOTICE OF COMPLETION 1. NOTICE IS HEREBY GIVEN, PURSUANT TO SECTION 3093 OF THE CIVIL CODE OF CALIFORNIA. whose address is 7C.ITY...OE...NATIONAL .-.CZ TY 1243 National City Boulevard, National City., CA 92Q5.Q 2. That the undersigned is an owner of the (fee) interest or estate in that real estate located at "see below" in the City of NATIONAL. CITY County of San Diego, State of California, more particularly described as: Installation of air conditioning for Public Library basement. 3. The street address of said property is 20Q E.ast...1.2.th...Street (1f no street address has been officially assigned, insert "none") 4. That the names and addresses of all co -owners of such estate and interest are: CO -OWNERS NAMES ADDRESS 5. That a work of improvement was completed upon said real property on 6. That the contractor (if any) for such work of improvement was SAN DIEGO BUILDERS 7. That such work of improvement was caused by the above named owners, or, in the event such work of improvement was caused by predecessors to the above named owners their interest was transferred to them from: TRANSFERORS ADDRESS State of California County of San Diego SSt The undersigned, being first duly sworn, deposes and says: ❑ That the undersigned is the owner of the above subscribed; ❑ That the undersigned is one of the partners of the partnership owner above subscribed: and on behalf of said partnership; 32( That the undersigned is the _.mayor of the Corporation owner above subscribed. and on behalf of said corporation. and has read the foregoing notice and knows the contents thereof and that the facts stated therein are true. Signature. RGE In �4layor of Natibr"a"T 'City SUBSCRIBED AND SWO N TO BEFORE FIE, THIS DAY OF FOR NOTARY SEAL OR STAMP Signature .. and for sr s i� an d Public in y State • Specification No. Change Order No. CONT:.ACT C:IAN CE ORDER 999 Date September 14, 1987 1 (one) PROJECT NO. 1111 Location National City Installation of air conditioning for Public Library basement. To: (Contractor) San Diego Builders, 7297 Ronson Road, Suite D, San Diego, CA 92111 You are hereby requested Specifications: to comply with the following changes from the contract plans and n Description of changes --Quantities, Units, Unit Prices, Change in Completion Schedule, Etc. (2) Decrease in Contract Price (3) Increase in Contract Price (4) TIME EXTENSION: Extension of contract completion time by 10 working days. The date for completion of all work under the contract will be Sept. 28, 1987. JUSTIFICATION: Inability of the contractor to obtain Krueger air distribution equipment in a timely manner in accordance with sequence of their operations and the approved construction schedule per Section 6-6.1 of the Standard Specifications for Public Works Construction. The time extension is granted based on: 1. The Krueger air distribution equip- ment delivery date of Sept. 9, 1987 per attached Exhibits A and B, 2. Assumption that the contractor has • , completed all the work items that could be completed prior to the air distri- bution installation. Change in contract price due to this Change Order: Total decrease Total increase Difference between Col. (3) and (4) Net (increase)(decrease) contract price $ 0.00 XXXXXICCCOCGCMCCX $ 0.00 $ 0.00 mommacmccxxxyaccxx $ 0.00 $ 0.00 $ 0.00 sum of $ 0.00 is hereby EBi$ the total contract price, and the total adjusted contract price to date thereby is $ 32,000.00 The time provided for completion in the contract is XlitWitigiag increased,F3€SS4 by 10 (ten) working days. This document shall become an amendment to the contract and all provisions of the contract will apply hereto. The Contractor accepts this Change Order as full compensation for additional work and any delay to the project caused by this Change Order. Accepted by: Recommended by Approved by: tractor ,z.//_// �� irta wegpT"--er oc. Civil Engr. 'H( g7 Date Date Date CONT?..ACT C:IANGE ORDER Specification No. 999 Change Order No. (2) Two Date November 5, 1987 PROJECT NO. 1111 Location National City Installation of Air Conditioning for Public Library Basement. To: (Contractor) San Diego Builders, 7297 Ronson Road, Suite D, San Diego, CA 92111 You are hereby requested to comply with the following changes from the contract .eecifications: plans and !em ha. l) Extra Work Description of changes --Quantities, Units, Unit Prices, Change in Completion Schedule, Etc. (2) Item No. 1 — Electrical Relocate electrical duplex receptacles to avoid conflict with the new duct work at the eastern wall of the basement. Item No. 2 — Mechanical Redesign and build new transition for the duct work to avoid physical conflict with the existing electrical conduits @ the r eastern wall of the basement. Total Cost is $391.26 Change in contract price due to this Change Order: Total decrease Total increase Difference between Co1. (3) and (4) Net (increase)(decrease) contract price Decrease in Contract Price (3) $ 0 $ 0 $ 0 Increase in Contract Price (4) $391.26 CCQCX $ 391.26 $ 391.26 $ 391.26 The and The all full sum of $ 391.26 is hereby added to, dOMMOLVEUDWil, the the total adjusted contract price to date thereby is $ 32,391.26 total contract price, time provided for completion in the contract is unchanged, ilWAIAM, aMicia, by 1 become an amendment to the contract and provisions of the contract will apply hereto. The Contractor accepts this Change Order as compensation for additional work and any delay to the project caused by this Change Order. 1H--$7 0 calendar days. This document shal Accepted by: Contractor Recommended by: Assoc. Civil Eng. Date it•1-er Date /.2 .7. 8 7 Date