HomeMy WebLinkAboutCC RESO 15,026RESOLUTION NO. 15,026 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY APPROVING CHANGE ORDER NO. 1 FOR INSTALLATION OF SIDEWALK CURB AND GUTTER AT VARIOUS LOCATIONS IN NATIONAL CITY (ENGINEERING SPECIFICATION NJ. 976) BE IT RESOLVED by the City Council of the City of National City that, pursuant to Resolution No. 13,924, Change Order No. 1 in the amount of $15,642 is hereby approved for the installation of sidewalk curb and gutter at various locations in National City. - PASSED and ADOPTED this 22nd day of July, 1986. Ali ST: Ione ampbell, City Clfk APPROVED AS TO FORM: vJiat Geor a H. iser, III -City Attorney Specification No. Change Order No. ^,ACT CHANGE ORDER 976 1 Date July 14, 1986 PROJECT NO. 1331 Location National City Replacement and Installation of Sidewalk, Curb and Gutter at Various Location in National City To: (Contractor) Dvno Constrnrtinn. Tnr. 8045 Raytheon Rd__ San Tliagr. rA 09111 You are hereby requested to comply with the following changes from the contract plans and Specifications: P ( Extra Work 1 Extra Work 2 Extra Work 3 Description of changes --Quantities, Units, Unit Prices, Change in Completion Schedule, Etc. (2) Relocation of the chain link fence at Division and Laurel Street. Lower the two water line fronting residences at 832 and 904 "L" Avenue. Modify Civic Center entrance at National Citj Boulevard for the Handicapped Access per Plan No. 5878D. Extra Work 4. Construct concrete Handicapped ramp and handrail at the entrance of the El Toyon Park Community Building per Plan No. 6112D. Extra. Work 5. Cut existing curb in El Toyon Park and construct two pedestrian ramps at $826 per each. Decrease in Increase in Contract Price Contract Price (3) (4) $ 200.00 $ 300.00 $ 4,040.00 $ 9,450.00 $ 1,652.00 Change in contract price due to this Change Order: Total decrease $ =` ` `xx Total increase X7xXXXX=XXX-X`000 $ 15,642.00 .Difference between Col.--(3)-and (4) $ Net (tncrease)(decrease) contract orice $ sum of $ 15.642.00 is hereby added to, deducted2fp om othe total contract price, acid the total adjusted contract price to date thereby is $ The time provided for completion in the contract is unchanged, increased, decreased, by -0- calendar days. This document shall become an amendment to the contract and all provisions of the contract will apply hereto. Accepted by: Contractor Recommended by: Approved by: 7 /. 9' Date 7/I1%‘ .aC Date JUSTIFICATION: 1. This chain link fence is located at the street right-of-way. In order to install new sidewalk at this location, it is required to relocate the fence to the property line. 2. In order to install new sidewalk at these two locations, it is required to lower the existing two water service below the new sidewalk. 3. The work involves removal of concrete curb and gutter, construct PCC pavement, curb, gutter and pedestrian ramp and sidewalk, per Plan No. 5878D. 4. The work involves constructing of concrete ramp and handrail per plan No. 6112D. 5. The work involves sawcutting concrete curb and constructing two pedestrian ramps in El Toyon Park. CB/JCS:tcg