HomeMy WebLinkAboutCC RESO 15,026RESOLUTION NO. 15,026
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY
APPROVING CHANGE ORDER NO. 1 FOR INSTALLATION OF SIDEWALK CURB AND
GUTTER AT VARIOUS LOCATIONS IN NATIONAL CITY
(ENGINEERING SPECIFICATION NJ. 976)
BE IT RESOLVED by the City Council of the City of National City
that, pursuant to Resolution No. 13,924, Change Order No. 1 in the amount
of $15,642 is hereby approved for the installation of sidewalk curb and
gutter at various locations in National City. -
PASSED and ADOPTED this 22nd day of July, 1986.
Ali ST:
Ione ampbell, City Clfk
APPROVED AS TO FORM:
vJiat
Geor a H. iser, III -City Attorney
Specification No.
Change Order No.
^,ACT CHANGE ORDER
976
1
Date
July 14, 1986
PROJECT NO. 1331
Location National City Replacement and
Installation of Sidewalk, Curb and Gutter at Various Location in National City
To: (Contractor) Dvno Constrnrtinn. Tnr. 8045 Raytheon Rd__ San Tliagr. rA 09111
You are hereby requested to comply with the following changes from the contract plans and
Specifications:
P
(
Extra
Work 1
Extra
Work 2
Extra
Work 3
Description of changes --Quantities, Units,
Unit Prices, Change in Completion Schedule,
Etc.
(2)
Relocation of the chain link fence at
Division and Laurel Street.
Lower the two water line fronting residences
at 832 and 904 "L" Avenue.
Modify Civic Center entrance at National Citj
Boulevard for the Handicapped Access per
Plan No. 5878D.
Extra
Work 4. Construct concrete Handicapped ramp and
handrail at the entrance of the El Toyon
Park Community Building per Plan No. 6112D.
Extra.
Work 5. Cut existing curb in El Toyon Park
and construct two pedestrian ramps at
$826 per each.
Decrease in Increase in
Contract Price Contract Price
(3) (4)
$ 200.00
$ 300.00
$ 4,040.00
$ 9,450.00
$ 1,652.00
Change in contract price due to this
Change Order:
Total decrease $ =` ` `xx
Total increase X7xXXXX=XXX-X`000 $ 15,642.00
.Difference between Col.--(3)-and (4) $
Net (tncrease)(decrease) contract orice $
sum of $ 15.642.00 is hereby added to, deducted2fp om othe total contract price,
acid the total adjusted contract price to date thereby is $
The time provided for completion in the contract is unchanged, increased, decreased, by
-0- calendar days. This document shall become an amendment to the contract and
all provisions of the contract will apply hereto.
Accepted by:
Contractor
Recommended by:
Approved by:
7 /. 9'
Date
7/I1%‘
.aC
Date
JUSTIFICATION:
1. This chain link fence is located at the street right-of-way. In order to
install new sidewalk at this location, it is required to relocate the fence
to the property line.
2. In order to install new sidewalk at these two locations, it is required to
lower the existing two water service below the new sidewalk.
3. The work involves removal of concrete curb and gutter, construct PCC
pavement, curb, gutter and pedestrian ramp and sidewalk, per Plan
No. 5878D.
4. The work involves constructing of concrete ramp and handrail per plan No.
6112D.
5. The work involves sawcutting concrete curb and constructing two pedestrian
ramps in El Toyon Park.
CB/JCS:tcg