Loading...
HomeMy WebLinkAboutCC RESO 14,876RESOLUTION NJ. 14,876 RESOLUTION AUTHORIZING APPROPRIATION AND TRANSFER OF SUPPLEMENTAL FUNDS TO ENGINEERING SPECIFICATION NO. 949 BE IT RESOLVED by the City Council of the City of National City that it hereby authorizes, appropriates and directs the following transfer of supplemental funds be made in order to meet necessary budget requirements: AMOUNT: $48,598.28 FROM: 122-509-500-598-6029 Las Palmas & El Toyon Parking Lot and Comfort Station Amount - $35,629.78 FROM: 122-509-500-598-7015 Repair Paradise Creek N/O 8th Amount - $8,531 TO: 122-509-500-59- 7015 Kimball Park ChanneT PURPOSE: Kimball Park Channel PASSED and ADOPTED this 25th day of Febr . 1986. Rile Morgan, Oror ATTEST: Ion= Campbell, City Ck APPROVED AS TO FORM: George H.iser, III - City Attorney ATTACHMENT I The Kimball Park flood control channel project has had erosion and other problems due to the high intensity storms of November, the inadequacy of the outlet structure of the triple 66" pipe crossing "D" Avenue, and the lack of grass cover along both banks. We have investigataed the problems, and have estimated the cost to solve them, plus other required work as follows: 1. Widening of concrete splash pads for existing drainage pipes to prevent further erosion. 2. Placing imported fill along the eroded portions of the channel. 3. Removal of the concrete walks of the existing outlet structure of the triple 66" pipes, and construction of a standard reinforced concrete wingwall and riprap energy dissipator. $ 2,790 3,015 23,070 4. Connection of drainage from existing inlet at 15th Street and "C" Avenue to the channel. 10,575 5. Removal of silt and debris from channel bottom. 2,350 SUBTOTAL $ 41,800 CONTINGENCY $ 6,798.28 TOTAL $ 48,598.28 Aproximately $3,000 of the estimated cost for Item 3 above is associated with correcting the existing outlet structure. The $5,4000 cost for Items 2 and 5 results from flood damage during the November 1985 storm. The remaining estimated cost of $40,000 is for upgrading the system. This work will be accomplished by change order to the present Contractor, T.B. Penick and Sons, Inc. or by re -advertising for bid. T.B. Penick will re -landscape the north bank as part of the original contract. The remainder of the landscaping and irrigation work for the south bank is as follows: 1. Soil preparation prior to planting of south bank. 2. Irrigation system installation for south side 3. Hydroseeding of south bank. 9,600 6,000 3,500 It is planned to get funding for this work during the 1986-87 Fiscal Year and to do the work during the summer dry season. Plans and specifications are being prepared. ATTACHMENT 2 FINANCIAL STATEMENT ATTACHMENT 1. Transfer $35,629.78 left from Account No. 122-509-500-598-6029 (Las Palmas and El Toyon Parking Lot and Comfort station) to Account No. 122-409- 500-598-4015 (Kimball Park Channel). These funds are in P.O. 30596 ($31,192.28) and P.O. 30595 ($4,437.50) 2. Transfer $8,531 left from Account No. 122-5.09-500-598-7015 (Repair Paradise Creek N/O 8th) to Account No. 122-409-500-598-4015 (Kimball Park Channel). These funds are in P.O. 30848.1 rna ya yr b y fl N a N PLAN /ll=*/ �ScALE EDOceD Th SAwe'r EXIST Cove, SAwcuT EX/s7: co'c. co vsr. 6 "coNc. sLA8 RCR D-86-8 CAL MA/ STANDARD exiST co,/c. CNANNEL) BED To REMAIN COMST. WARRED whVG I WALLS PER D-86-8 CAL 77TAN STANDARD 7E' 72" C.l. R. NORTH S/DE (w/A/GWALL) fSAwcur DOWELS -# 4 0 /'-0" O• S4wcur FxiSr6"cavC rI SECT/OA/ t B-3 SOUTH S/DE(W/NGWALL) /" = #' (SCALE REDUCED) KIMBALL PARK CHANNEL /NL,E'T STR(JCTURE 4,47; //22/84