HomeMy WebLinkAboutCC RESO 14,742RESOLUTION NO. 14,742
RESOLUTION AUTHORIZING THE CITY ENGINEER TO
SIGN RIGHT-OF-WAY CERTIFICATION FOR EUCLID AVENUE
FROM PLAZA BOULEVARD TO 16TH STREET
BE IT RESOLVED by the City Council of the City of National City,
California, that the City Engineer is hereby authorized to sign the right-of-way
certification for Euclid Avenue from Plaza Boulevard to 16th Street, necessary
to release of construction funds by the Federal Highway Administration.
PASSED and ADOPTED this 17th day of September, 1
ATTEST:
L- -72m
Ione Campbell, City/Clerk
APnPROVED AS TO FORM:
Kile Mor
or
City of National City
Office of the City Engineer
1243 National City Boulevard, National City, Ca.92050-4397
(619) 474-8528 (619) 477-1181, EXT.73
Right-of-way Certification Format A
CITY OF NATIONAL CITY
August 23, 1985 11-SD-O-NAT CITY-0
Date
Identification Number
RIGHT-OF-WAY CERTIFICATION _IAU S- 155
Federal Program
Euclid Avenue
Street, Road, or Project Name
From Plaza Boulevard to 16th St.
Job Limits
All required right-of-way for construction of this project has now been acquired
covered by Right -of —Entry or Order of Possession, as set forth in detail below:
1. STATUS OF RIGHT-OF-WAY ACQUISITION
a. Total number of parcels required 21
b. Parcels acquired outright 21
c. Parcels covered by right -of -entry or
order for possession. None
2. STATUS OF AFFECTED RAILROAD FACILITIES
3. DESIGNATED MATERIALS SITES
4. DESIGNATED DISPOSAL AREAS
None
None
None
5. STATUS OF UTILITY RELOCATION
A. Status of Relocations
Company Type Facility Relocation Type
See Attachment
B. High and Low Risk
(1) This will be a locally administered project and I certify that City
of National City has been informed in writing of Caltrans' high and
low risk underground facilities policy. I am aware that the State assumes
no liability for compliance or noncompliance with said policy.
6. SCHEDULE FOR REMOVAL OF IMPROVEMENTS AND OBSTRUCTIONS Houses located at 2502
and 2524 E. 13th St. were removed on June 6, 1985
7. UNAUTHORIZED ENCROACHMENTS NONE
8. COMPLIANCE WITH FEDERAL AND STATE REQUIREMENTS REGARDING THE ACQUISITION OF
REAL PROPERTY.
X All right-of-way has been acquired in accordance with Title III of the
Federal Uniform Relocation Assistance and Real Property Acquisition
Policies Act of 1970 (Public Law 91-646) and all applicable current
FHWA directives covering the acquisition of real property.
ATTACHMENT
5A. Status of Utility Relocation
COMPANY
San Diego Gas &
Electric (SDG&E)
TYPE FACILITY
2" gas main and overhead
electric facilities
running E-W along 13th St..
Sweetwater Authority 6" water pipe running
E-W along 13th St.
Pacific Bell
Overhead telephone
facilities running
E-W along 13th St.
RELOCATION TYPE
The utility relocation will
be done by SDG&E, when
contractor excavates 13th St
Coordination with the cont-
ractor will be required. Ten
days needed to do the work.
The utility relocation will
be done by Sweetwater Auth-
ority, when contractor exca-
vates 13th st. Coordination
with the contractor will be
required. Ten days needed tc
do the work.
The utility relocation will
be done by the same cont-
ractor as SDG&E when the con
tractor excavates 13th St.
It requires relocation of
one pole.
Possible relocation of tele-
phone underground conduit
at intersection of Euclid
Avenue and Plaza Blvd.,
(south side).
EXHIBIT 14-2c
1983-2
DISTRICT 11
9. COMPLIANCE WITH RELOCATION ADVISORY ASSISTANCE AND PAYMENTS PROVISIONS OF
FEDERAL AND STATE LAW
The project has no occupied parcels, and all persons have been relocated to decent,
safe and sanitary housing or have been offered decent, safe and sanitary housing in
accordance with the current FHWA regulations. No person displaced by this project
has been required to vacate without at least 90 days written notice.
a. Number of dewllings displaced 2
1. Owner occupied 1
2. Rental Units 1
b. Farm operation(s) and business(es) displaced NONE
I HEREBY CERTIFY the right-of-way on this project as conforming to Statement
No. (1) of Paragraph 5c of FHPM 6-4-2-1. I further certify that all environmental
mitigations and right-of-way obligations entered into in the acquisition of this
right-of-way have been duly noted and complied with in the plans and specifications
for the above project.
STAFF()
City Engineer
DATE 9/20/85