HomeMy WebLinkAboutCC RESO 14,243RESOLUTION 14,243
RESOLUTION AUTHORIZING TIE MAYOR TO
EXECUTE A REVISED AGREEMENT WITH THE
CITY OF SAN DIEGO TO IMPROVE DIVISION
STREET
BE IT RESOLVED by the City Council of the City of National
City that the Mayor is hereby authorized to execute that certain
revised agreement between the City of San Diego and the City of
National City for improvement of Division Street.
PASSED and ADOPTED this 7th day of February, 1984.
ATTEST:
CITY CLERK
AGREEMENT TO IMPROVE DIVISION STREET
This agreement, entered into on
National City and the City of San Diego.
, 198 is between the City of
RECITAL
1. Division Street needs to be resurfaced from National City Boulevard to Highland
Avenue, except for the divided portion from Marine View Avenue eastwardly to
the alley approximately 180 feet west of Highland Avenue.
2. The boundary of the City of National City and the City of San Diego runs approxi-
mately along the center line of Division Street.
3. Both cities will benefit from this improvement.
4. The scope of the work is shown in Exhbit A, attached and made part of this agree-
ment, and the estimate of cost is shown in Exhibit B, attached and made a part
of this agreement.
5. The City of National City and the City of San Diego mutually desire to cooperate
and jointly participate in construction of the aforesaid improvements and desire
to specify herein the terms and conditions under which said improvements shall
be construed and financed.
SECTION 1
The City of National City agrees to:
1. Provide plans and specifications for the resurfacing of said Division Street,
including the City of San Diego's portion, and to pay the entire expense thereof.
2. To advertise, award and administer this project, including construction engineer-
ing, and to pay the entire expense thereof.
3. To construct this project by contract and to pay the entire expense thereof.
SECTION 2
The City of San Diego agrees to:
1. To deposit with the City of National City, upon execution of agreement by both
cities and upon billing therefor, the amount of $53,000, which figure represents
the City of San Diego's total estimated share of expense of preparation of plans
and specifications, advertising of bids, awarding and administration of contract
required to complete the project, and construction of work shown on Exhibit A.
2. After completion of the construction and after all the true costs described in
section 1 are finalized, the City of San Diego will be billed or refunded for
the amount that these costs exceed or are under the deposit.
SECTION 3
1. Any change orders or modifications to the Scope of the Work shall be authorized
by the City of National City without the concurrence of the City of San Diego
unless said change order or modification materially affects the respective obli-
gations of the parties.
2. This Agreement can be modified, altered or revised only with the written consent
of both parties.
3. This Agreement shall terminate upon completion and acceptance of project by both
cities or on December 31, 1984, whichever is earlier in time.
CITY OF SAN DIEGO
By:
Attest:
CITY OF NATIONAL CITY
By:
Attest---- ..( = /!
/ City Clerk,
Oct
lc
m
N No
0
7
SAN D/EGO
DIVISION
> -
z
0
2
z
4
ORTIU TH
►III!lu IIIIIIIIIII III !III I I MI III I I
FIRST
w.2ND E.SECOND
W }
4 V
W 3RD E THIRD
W 4TH QE.FOURTH
Z
0
h
Q
W 5TH ZE_FIFTH
L�
-n n
W
>
STREET
STREET
T/ONAL
STREE T
STREET
L
L
Iz
Icr
I,
0
0
z
I-
•
z
w
l�
•
NORDICA
J
IIIIST.IIIIIIIIII
ER /
W
>
w
>
I
W
Q
E SECOND
E
0
Z
-J
2
V
2
FOURTH
W
>
4
STREET E FIFTH
nn nn nn nn nn nn n.[J
l" = 500'
EXHIBIT "All
REVISED COST ESTIMATE
DIVISION STREET FROM MARINE VIEW AVENUE TO MAIN STREET AND FROM
HIGHLAND AVENUE TO FIRST ALLEY, APPROXIMATELY 200 FEET WEST.
PORTION WITHIN CITY OF SAN DIEGO
Pavement Reinforcing Fabric 6200 S.Y. @ $ 1.60 $ 9,920
1" Leveling Course (51,330 SF) 320 TON @ 34.00 10,880
11/2" Surface Course (55,800 SF) 523 TON @ 34.00 17,782
Raise Valve to Finish Pavement 16 EA @ 150.00 2,400
$40,982
Contingency @ + 10% 4,098
$45,080
EXHIBIT B