RESOLUTION NO. 14,471
RESOLUTION AUTHORIZING THE MAYOR TO SIGN
ANIMPROVEMENT AGREEMENT BETWEEN GROVE PLAZA, LTD.
AND THE CITY OF NATIONAL CITY
BE IT RESOLVED by the City Council of the City of National City,
California, that the Mayor is hereby authorized to execute on behalf of the
City, a Cooperative Agreement between Grove Plaza, Ltd. and the City of
National City as it applies to the installation of traffic signal at the corner of
Grove Street and Plaza Boulevard.
PASSED and ADOPTED this 13th of November, 1984.
ATTEST:
AGREEMENT TO INSTALL A TRAFFIC SIGNAL
AT INTERSECTION OF
PLAZA BOULEVARD AND GROVE STREET
This agreement, entered into on October 11
City of National City and Grove Plaza, Ltd.
oper).
RECITAL
, 19 84 , is between the
herein called Devel-
1. A traffic study prepared by Federhart & Associates, traffic engineering con-
sultant, has warranted the installation of a traffic signal at this loca-
tion.
2. The City of National City and the Developer will benefit from this improve-
ment.
3. The City of National City and the Developer mutually desire to cooperate and
jointly participate in construction of the aforesaid improvement and desire
to specify herein the terms and conditions under which said improvements
shall be construed and financed.
SECTION 1
The Developer agrees to:
1. Provide plans, specifications and Engineer's Cost Estimates for the
construction of the traffic signal.
2. To advertise, award and administer this project, including construction
engineering, and to pay one-half (1/2) the entire expense thereof.
3. To construct this project by contract and to pay one-half (1/2) of the ex-
pense thereof.
SECTION 2
The City of National City agrees to:
1. Pay one-half (1/2) of the Traffic Engineer's fee for preparation of plans,
specifications and cost estimates after these documents are approved by the
City's Engineering Department. Approval and payment not to be unreasonably
withheld. (Preliminary estimate of this is $4,000/2 = $2,000.)
2. Pay one-half (1/2) of the construction engineering.
3. Make progress payments on completed work after this is verified to the
satisfaction of the City. Approval and payment not to be unreasonably with-
held. The City of National City will pay one-half (1/2) of the project
cost. (Preliminary estimate is $86,000/2 = $43,000).
SECTION 3
1. Any change orders or modifications to the Scope of the Work shall not be
authorized by the Developer without the concurrence of the City of National
City unless said change order or modification materially affects the respec-
tive obligations of the parties.
2. This Agreement can be modified, altered or revised only with the written
consent of both parties.
3. This Agreement shall terminate upon completion and acceptance of project by
both parties or on march 31, 1985, whichever is earlier in time.
DEVELOPER
CITY OF NATIONAL CITY
By:-t201,,E- Xn7r1 L.;7)) By:
Attest: � . _ Atte
STATE OF CALIFOR:
COUNTY OF _ % SS.
on QG _//. �9�
before me. the undersigned, a otan P blic in and for; id, tale, 'rsonally appeared
� / known to me
to b'iof the partners of the partnership
that eYecuted the within instrument, and acknowledged( to me that
such partnership executed the same.
WITNESS my hand nd official seal.