HomeMy WebLinkAboutCC RESO 13,948RESOLUTION NO. 13,948
RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF NATIONAL CITY, CALIFORNIA, APPROVING AN
AGREEMENT WITH THE CITY OF SAN DIEGO TO
IMPROVE DIVISION STREET
BE IT RESOLVED by the City Council of the City of
National City, California, that the Mayor is hereby
authorized to execute that certain Agreement between the
City of National City and City of San Diego to improve
Division Street.
PASSED AND ADOPTED this llth day of January, 1983.
ATTEST:
AGREEMENT TO IMPROVE DIVISION STREET
This agreement, entered into on ' , 198 is between the City of
National City and the City of San Diego.
RECITAL
1. Division Street needs to be resurfaced from National City Blvd. to Highland
Avenue.
2. The boundary of the City of National City and the City of San Diego runs
approximately along the t of Division Street.
3. Both cities will benefit from this improvement.
4. The scope of the work is shown in Exhibit A, attached and made part of this
agreement, and the estimate of cost is shown in Exhibit B, attached and
made a part of this agreement.
5. The City of National City and the City of San Diego mutually desire to
cooperate and jointly participate in construction of the aforesaid improve-
ments and desire to specify herein the terms and conditions under which
said improvements shall be constructed and financed.
SECTION 1
\ The City of National City agrees to:
1. Provide plans and specifications for the widening of said Division Street,
including the City of San Diego's portion, and to pay the entire expense
thereof.
2. To advertise, award, and administer this project, including construction
engineering, and to pay the entire expense thereof.
3. To construct this project by contract and to pay the entire expense thereof.
SECTION 2
The City of San Diego agrees to:
1. To deposit with the City of National City, upon execution of agreement by
both cities and upon billing therefor, the amount of $53,000, which figure
represents the City of San Diego's total estimated share of expense of
preparation of plans and specifications, advertising for bids, awarding
and administration of contract required to complete the project.
2. The City of San Diego's share of expense shall be one-half of all costs des-
cribed in Section 1. Before contract is awarded, the City of San Diego
will give the City of National City its approval in writing.
3. After completion of the construction and after all the true costs described
in Section 1 are finalized, the City of San Diego will be billed or refunded
for the amount that these costs exceed or are under the deposit.
SECTION 3
1. This agreement can be modified, altered or revised only with the written
consent of both parties.
2. This Agreement shall terminate upon completion and acceptance of project
by both cities or on December 1, 1983, whichever is earlier in time.
CITY OF SAN DIEGO CITY OF NATIONAL CITY
By: By:
Attest: Attest.
i City Clerk
w
SA N DIEGO
DIVISION
O FIRST
W. 2ND E. SECOND
U
w 3RD
E THIRD
r
W 4TH QE.FOURTH
z L
0
W 5TH ZE.FIFTH
-In
.- 4 tr
tr
d
❑ ^ u' L' O
c' >
= H 4 w Z
g InII ImI °J
z
4
w
4
eE
STREET
STREET
TONAL
STREE T
STREET
w
a
w
4
w
4
1
NORDICA ST
w
FOURTH
w
4
ET4
STREE M
nnETnnnnnnnn
ar
11/2 " A. C. OVERLAY ON STRESS
ABSORBING MEMBRANE
I" = 500'
EXHIBIT "A"
COST ESTIMATE
DIVISION ST. FROM NATIONAL CITY BLVD. TO HIGHLAND AVE.
Portion Belonging to City of San Diego
1. 12" A.C. Overlay:
V = 26' (3,630') 0.125 = 11,798 ft.3 = 437 C.Y.
= 874 Tons
COST = 874T @ $34 = $29,776
2. Stress Absorbing Membrane
A = 26 (3630) = 94,380 ft.2 = 10,487 yd.2
COST = 10,487 yd @$1.60= $16,779
SUB -TOTAL = $46,555
+10% CONTINGENCY = 4,655
TOTAL = $51,210
DESIGN & CONSTR. ENGRNG = 1,790
TOTAL = $53,000
EXHIBIT B