Loading...
HomeMy WebLinkAboutCC RESO 13,948RESOLUTION NO. 13,948 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY, CALIFORNIA, APPROVING AN AGREEMENT WITH THE CITY OF SAN DIEGO TO IMPROVE DIVISION STREET BE IT RESOLVED by the City Council of the City of National City, California, that the Mayor is hereby authorized to execute that certain Agreement between the City of National City and City of San Diego to improve Division Street. PASSED AND ADOPTED this llth day of January, 1983. ATTEST: AGREEMENT TO IMPROVE DIVISION STREET This agreement, entered into on ' , 198 is between the City of National City and the City of San Diego. RECITAL 1. Division Street needs to be resurfaced from National City Blvd. to Highland Avenue. 2. The boundary of the City of National City and the City of San Diego runs approximately along the t of Division Street. 3. Both cities will benefit from this improvement. 4. The scope of the work is shown in Exhibit A, attached and made part of this agreement, and the estimate of cost is shown in Exhibit B, attached and made a part of this agreement. 5. The City of National City and the City of San Diego mutually desire to cooperate and jointly participate in construction of the aforesaid improve- ments and desire to specify herein the terms and conditions under which said improvements shall be constructed and financed. SECTION 1 \ The City of National City agrees to: 1. Provide plans and specifications for the widening of said Division Street, including the City of San Diego's portion, and to pay the entire expense thereof. 2. To advertise, award, and administer this project, including construction engineering, and to pay the entire expense thereof. 3. To construct this project by contract and to pay the entire expense thereof. SECTION 2 The City of San Diego agrees to: 1. To deposit with the City of National City, upon execution of agreement by both cities and upon billing therefor, the amount of $53,000, which figure represents the City of San Diego's total estimated share of expense of preparation of plans and specifications, advertising for bids, awarding and administration of contract required to complete the project. 2. The City of San Diego's share of expense shall be one-half of all costs des- cribed in Section 1. Before contract is awarded, the City of San Diego will give the City of National City its approval in writing. 3. After completion of the construction and after all the true costs described in Section 1 are finalized, the City of San Diego will be billed or refunded for the amount that these costs exceed or are under the deposit. SECTION 3 1. This agreement can be modified, altered or revised only with the written consent of both parties. 2. This Agreement shall terminate upon completion and acceptance of project by both cities or on December 1, 1983, whichever is earlier in time. CITY OF SAN DIEGO CITY OF NATIONAL CITY By: By: Attest: Attest. i City Clerk w SA N DIEGO DIVISION O FIRST W. 2ND E. SECOND U w 3RD E THIRD r W 4TH QE.FOURTH z L 0 W 5TH ZE.FIFTH -In .- 4 tr tr d ❑ ^ u' L' O c' > = H 4 w Z g InII ImI °J z 4 w 4 eE STREET STREET TONAL STREE T STREET w a w 4 w 4 1 NORDICA ST w FOURTH w 4 ET4 STREE M nnETnnnnnnnn ar 11/2 " A. C. OVERLAY ON STRESS ABSORBING MEMBRANE I" = 500' EXHIBIT "A" COST ESTIMATE DIVISION ST. FROM NATIONAL CITY BLVD. TO HIGHLAND AVE. Portion Belonging to City of San Diego 1. 12" A.C. Overlay: V = 26' (3,630') 0.125 = 11,798 ft.3 = 437 C.Y. = 874 Tons COST = 874T @ $34 = $29,776 2. Stress Absorbing Membrane A = 26 (3630) = 94,380 ft.2 = 10,487 yd.2 COST = 10,487 yd @$1.60= $16,779 SUB -TOTAL = $46,555 +10% CONTINGENCY = 4,655 TOTAL = $51,210 DESIGN & CONSTR. ENGRNG = 1,790 TOTAL = $53,000 EXHIBIT B