Loading...
HomeMy WebLinkAboutCC RESO 13,550RESOLUTION NO. 13,550 RESOLUTION AUTHORIZING EXECUTION OF AN AGREEMENT BETWEEN THE CITY OF NATIONAL CITY AND TESTING ENGINEERS OF SAN DIEGO FOR CONSTRUCTION INSPECTION ON THE 22ND STREET IMPROVEMENTS, BOX CULVERT, AND PARADISE CREEK CHANNEL LINING BETWEEN 22ND AND 24TH STREETS. WHEREAS, on the 21st Day of April, 1981, by Resolution 13,547, the City Council of National City awarded a construction contract for 22nd Street Improvements, Box Culvert and Paradise Creek Channel Lining between 22nd and 24th Streets; and, WHEREAS, the scope of said contract requires sub- stantial construction inspection effort beyond the capacity of City personnel; and, WHEREAS, the City Engineer having solicited and examined proposals finds Testing Engineers of San Diego th.e firm best qualified to perform the required construction inspections and testing; BE IT RESOLVED, by the City Council of the City of National City that the City Engineer is authorized to execute and the City Clerk to attest that certain agreement, as outlined in the letter of proposal dated April 14, 1981 and incorporated herein by reference as Exhibit "A", between the City of National City and Testing Engineers of San Diego for construction inspection and testing on the 22nd Street Improvements, Box Culvert and Paradise Creek Channel Lining between 22nd and 24th. Streets. PASSED AND ADOPTED this 28th Day of April, 1981. ATTEST: EXHIBIT "A" attached gTesting Engineers —San Diego 3467Kurtz St., P.O. Box 80985, San Diego, Ca. 92138 (714) 225 9641 1903 West Vista Way, Unit B, Vista, California 92083 (714) 758-3730 April 15, 1981 Mr. Ralph Grahl City Engineer City of National City 1243 National City Boulevard National City, California 92050 Subject: Resident Inspector, Testing,'Quality Control & Staking Project: 22nd Street Drainage Box Culvert/Road Work & Paradise Creek Channel Improvements Dear Mr. Grahl: As requested, we have carefully reviewed the contract documents and speci- fications for the proposed Twenty -Second Street and Paradise Creek Improve- ment Project. Testing Engineers -San Diego and its staff have provided like construction inspection and testing services on a number, of similar projects in the San Diego County area and feel we can best provide you with the experi- ence and expertise required for your program. Rased on the information presented and our understanding of the project, we have prepared the following proposal for this work. Owner's Representative/Project Inspector Based on our experience with_ similar projects and discussions with you, we believe a resident inspector on site an average of 80 percent of the total project time should be sufficient to monitor general construction activities and accomplish the required administrative tasks including review of plans, meetings, coordinating jobsite problems, general inspection, fill and con- struction control and project coordination. In this manner, the City of National City will insure that the project is completed in a quality manner according to specifications. More effort will be allocated to intense construction activity periods and less during non -construction or conclusion periods. -1— 4a "EXHIBIT "A" (Resolution No. 13,550) Resident Inspector, Testing, Quality Control & Staking 22nd Street Drainage Box Culvert/Road Work & Paradise Creek Channel Improvements Page Two April 15, 1981 We propose to assign William C. Allen as Resident Inspector for the City on this project. He will act as City inspector and review plans, construction, testing and engineering for the project to insure the project is built according to stan- dards. He will also represent and protect the City's interest in working with the Contractor on the project. A copy of his resume is attached. Bill's experi- ence includes owner's representation and resident inspection experience on a great number of projects ranging from one-half million to over 12 million dollars in costs. He is highly experienced with all areas required for the project and has been inspector on similar projects, some of which were the La Costa Storage Reser- voir, spillways, culverts, intake structures, weirs, headwalls and foundations, and the Carlsbad Sewer Plant at El Camino Plaza, including pipe, pumphouses and pressure systems. Bill is a registered reinforced concrete inspector and construction inspector. He is also certified by the Office of the State Architect as an OSA school inspector which encompasses the areas of foundation, site and structure. With his ten years of owner's representation, resident inspector and construction experience in the areas of private and governmental facilities, we feel he will makez. an excellent representative and inspector for the City of National City on the project. Our rate for Mr. Allen's services is $30.00/hour. Based on an estimate of 80% total service time for this project, we believe his services will be required for 108 days of work out of the 190 calendar days of the contract. The estimated cost of his services would be as follows: Resident Inspector - 108 days X 8 hours/day @ $30/hour = $25,920. Field Compaction Testing Field compaction testing of soil and base (including utilization of a mobile laboratory) and asphaltic concrete (utilizing a nuclear gage) would be performed by a technician from our own staff. Concrete sampling would be done by Mr. Allen. Technician - 110 hours X $29.50/hour = $3245.00. Laboratory Testing Laboratory testing of soils, asphalt, base materials, concrete and additional tests of uncertified materials would be performed at our own central facilities according to specifications and as required.. The fees would be according to our attached standard fee schedule. Laboratory testing allowance='$1850.00. Resident Inspector, Testing Quality Control & Staking 22nd Street Drainage Box Culvert/Road Work & Paradise Creek Channel Improvements Page Three April 15, 1981 Construction Staking Contruction staking would be provided through a sub -contract to Bement, Dain- wood and Sturgeon, Civil Engineers of San Diego. After reviewing the plans, we feel the contractor would need the following as a minimum for construction: A. 22nd Street Improvements Rough Grade Stakes Finish Curb Stakes Drainage Inlet Stakes Storm Drain Stakes Driveway Reconstruction Stakes B. Paradise Creek Channel Rough. Grade Stakes Finish Grade Stakes C. Box Culvert Alignment and Invert Stakes Based on the sub -contractors figures and using one set of stakes for each of the above operations, we estimate the cost as follows: Staking as above = $4600.00* *If additional staking is desired, the work would be done on a cost plus fixed fee basis. Based on the above figures, we estimate that we will perform all aspects of the above referenced work for a total price of approximately $35,600.00. Enclosed, for your review, is additional information regarding Testing Engineers - San Diego, its staff and our experience. We hope this will assist you in your selection process. If you have any question regarding this proposal, or would like any additional information, please feel free to contact me. We hope we -will have the opportunity to work with you and the City of National City on this project and appreciate your consideration of our firm for this work. Very truly yours, TESTING ENGINEERS-SAN DIEGO ohn C. Burns, P.E., Vice President JCB:am Enclosures