HomeMy WebLinkAboutCC RESO 2000-12 (11)RESOLUTION NO. 2000 —127
RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF NATIONAL CITY
AUTHORIZING THE MAYOR TO EXECUTE AN AGREEMENT
WITH BLAYLOCK ENGINEERING GROUP TO PREPARE THE
STRUCTURAL PLANS FOR THE SEISMIC RETROFIT OF ALL FLOORS
AND THE BASEMENT REMODEL OF THE CIVIC CENTER
WHEREAS, the City desires to employ a contractor to prepare construction
documents for the seismic strengthening of all floors and a remodel of the basement of the
National City Civic Center as specified in Attachments "A" and "B"; and
WHEREAS, the City has determined that Blaylock Engineering Group is a
structural engineering firm and is qualified by experience and ability to perform the services
desired by the City, and is willing to perform such services.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of
National City hereby authorizes the Mayor to execute an agreement with Blaylock Engineering
Group to prepare the structural plans for the seismic retrofit of all floors and the basement
remodel of the Civic Center. Said agreement is on file in the office of the City Clerk.
PASSED and ADOPTED this 3rd day of October, 2000.
George H. Waters, Mayor
ATTEST:
-;;-",e,r)/(tjh
Micha 1 R. Dalla
ay
Clerk
APPROVED AS TO FORM:
// Z4:. ar
George H. Eiser, III
City Attorney
ATTACHMENT A
C
1'
O 0
s-0'
H
L
m-0'
DOTING
CONCRETE
FOOTING
TYPICAL r 7''4
I
al
WSDNO
CONCRETE
COLUMN
TYPICAL
24'.r
L
O O 0 O
SAWCUT, CHIP AND
REMOVE EXIST.4"
CONC. SIAB-0140RADE
E4O
u.r
❑
r---1
1 1 1
1 ❑ 11 ❑ 1 1 ❑ 1 1 0
1
1 1 1
METING
' CONCRETE
WALL.TYP.
EDIT. 4' CONC. SUB-
ON4iRADEWIWmWIA
xW1AWELDEDWIRE MESH'
0
MST. r CONC.
BLOCKNONBEARING
PARTIDCN WALLS
BASEMENT DEMOLITION PLAN
SCALE IMI'.1'4c
r
204r
PHASE 2-TENANT
IMPROVEMENTS
I
f
..1
0 0
21'.tr
rir;
1
I
DEMOLISH WEST.
r CONC. BLOCK
PARTITION WALLS
Blaylock
Engineering SEISMIC STRENGTHENING INVESTIGATION
Group NATIONAL CITY CIVIC CENTER
City of National City
California
0
eo 2I-0•
H
L
0 0
2NY-0'
u'4'
r___r
I I
I❑ I 1 I❑ I
0 0
y 24,.o y
12.0 1r-0• y
re
11
YoFCO,V
WALL &FTG.
NEW fr
CONC. WALL
A�Rs m.
❑ -'I ikt
�1 ix
NEW CONC.
FOOTING
r
I
101
I ❑
2' .
FOUNDATION PLAN
ICMF: Im' 1,.O
0
rJ
0
21'd
I
1 _J
1— PHASE2 OF TENANT
IMPROVEMENTS
❑ 1
I i
r--I--I- -
I 1 1
0
r-
1 0 NEWNr
CONC.• WAIl
r-1•
irtr
Blaylock
Engineering
Group
SEISMIC STRENGTHENING INVESTIGATION
NATIONAL CITY CIVIC CENTER
City of National City
California
.o1.5,,waxer ,V,M01111/
0
0
0
PHASE 1 OF TENANT
IMPROVEMENTS
SOW
7N-0"
CI 0 a 0
24'.O
'4V-4-fr AN1 °FD PWAANEL
I '
t
'I f
P
MJMNEW12
• CONC. WALL
• TYP.
0 111... I
o
LISTING PRECAST EXIEMNO CONCRETE
CONCRETE pANEL., WAFFLE SLN3, TYPICAL
.
Ityp
FIRST FLOOR FRAMONG PLAN
SCALE: wow.
1
• 3'.4'
211.1“:1
-
NEW Ir
CONC. WALL 1
r.
Irl VQ 1
21LO"
V I
FIBER.REIATORCED
COMPOSITE WRAP
AT COUJMNS
0
PHASE 2 OF TENANT
IMPROVEMENTS
Blaylock
Engineering
Group
SEISMIC STRENGTHENING INVESTIGATION
NATIONALCITY CIVIC CENTER
City of National City
California
0
ma
E%IST81O PRECAST
CONCRETE PANEL,
TYPICAL
0
EXISTING CONCRETE
WAFFLE SLAB, TYPICAL
uw
. 3.7,
0
24'4
0
NEW 17
CONC.WALL
SECOND FLOOR FRAMING PLAN
SCALE 1/r.1'0
O
0
17
zra
FACE OF
PANEL
0
Blaylock Engineering
SEISMIC STRENG'1'HLNING INVESTIGATION
Group oineering NATIONAL CITY CIVIC CENTER
City of National City
California
ATTACHMENT B
existing
Util ty Ram
existing
Conference Ram
existing
Noah
eden
Program Manager
6
MI5
11
Janitor
iCl oset
existing
erectors
Office
sting II
for Accountant II
Office II
I 1
Pr,., d Ctgy
�Ity'(reasurisl'' s
Office 11
J
existing
Financial Services
Officer
existing
Office
(2 People)
existing
Restroom
A
n
II
II
II
II
16
existing
Restrain
A
L
How
.919,9
existing
File Ram
JJ
mg
or Accountant'
Office 1
1
existing
`apply Roan
existing
break Ram
f
4',9'*M. 4',4
d Community Cale nce Room
Public Corridor
IstN
'treasurer' d
Office
I COUNT
- 1
existing Ft - repartxnent
Copy Ram
,4
Personnel PIrectar
Per , -I Reception
(2 Persons)
Proposed Publ < orridcr
Pr d City
or Accountant
Office
SCFPC
Pr d City
nia Accountant
Office
sax
existing File Ram
Revision Pate
Mau 22.2000
June 28, 2000
July 19, 2000
July 25, 2000
Legend
New Construction
I 1 existing Construction
® 5eismic Strengthening/ Remodel Area
C===7 Construction to be Removed
MIMI Areas to be F illed
Glass Wall
10 existing 5eour[ty Poor
02 Proposed 5ecurky Poor
) Existing Fire Poor to be Removed
Qg existing Fire System
Notes:
A Future possibly eliminate one or both
bathrooms and covert ale to an unisex
bathroom,
6. Passible future MI5,
Proposed Public Condor
Closet
SCFPC
SCFPC
9' ,4'
Proposed Personnel
Conference/ to
Room
rJ
Prank tank
Cell
Cell
9_
Cell
Cell
[tors Closet
Storage Roan
C,el
Feild ensower
Trash
Mechanical Room
holler Room
Mechanical Ram
Cell
Cell
Meduaical Ram
Proposed Public Corridor
Proposed Public Corridor