HomeMy WebLinkAboutCC RESO 2003 - 91RESOLUTION NO. 2003 — 91
RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF NATIONAL CITY
AUTHORIZING THE CLOSURE OF THE
BAYSHORE BIKEWAY PATH ADJACENT TO
THE NATIONAL CITY MARINA PROJECT
WHEREAS, the San Diego Unified Port District ("Port District") has
entered into a contract with R. E. Staite Engineering, Inc. for the dredging of the
Marina in National City adjacent to Pepper Park; and
WHEREAS, due to the impediment of bicycle traffic and safety
concerns, R. E. Staite Engineering is requesting a closure for 30 days beginning
July 7, 2003, of a section of the Bayshore Bikeway Path within an easement in the
SDG&E right-of-way leased and maintained by the City of National City to complete
Phase I of their construction, and an additional 30 days in the future once Phase II
of the project has been awarded by the Port District.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City
of National City hereby authorizes a 30 day closure beginning July 7, 2003, of a
section of the Bayshore Bikeway Path within an easement in the SDG&E right-of-
way leased and maintained by the City of National City, depicted in the attached
Exhibit "A", to complete Phase I of R. E. Staite Engineering's construction, and an
additional 30 days in the future once Phase II of the project has been awarded by
the Port District.
BE IT FURTHER RESOLVED that the City Council hereby approves the
temporary detour route, depicted in the attached Exhibit "A", for use during the
periods of time which the Bayshore Bikeway Path is closed.
ATTEST:
PASSED. and ADOPTED this 1" day of July 2003.
Mic el Della, Cij?jj Clerk
--el
NickrYza, Mayor
APPROVED AS TO FORM:
George H. Eiser, III, City
Attorney
11. OIH Sf.
7 ,1kir
7
W. 3aro
20h
CITY OF
NATIONAL CITY
mar
uuoar
swum
r—
SWEETWATER RNER FLOOD CONTROL CHANNEL
CITY OF
CHULA VISTA
■ PROPOSEDCB� RE ROUTE/PATH
PROPOSED TEMPORARY BIKE
ROUTE DETOUR
El MARINA SITE
MOIL
E 1S111
E SEVFIAEF111lH
41.
E 271H ST.
a
E. 7171H ST.
EXHIBIT "A"