Loading...
HomeMy WebLinkAboutCC RESO 2003 - 118RESOLUTION NO. 2003 —118 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY AUTHORIZING THE CLOSURE OF THE SWEETWATER CHANNEL LEVEE BIKE PATH WHEREAS, the California Department of Transportation is constructing a section of the Bay Shore Bikeway, Class I bike path along Interstate 5, between F Street in the City of Chula Vista and 24th Street in the City of National City, which requires the temporary closure of the existing bake path and rerouting of bicycle and pedestrian traffic for approximately six (6) months, beginning September 15, 2003, and ending no later than March 15, 2004, in order to construct a temporary falsework structure; and WHEREAS, the falsework structure will be assembled atop the existing Class 1 bike path that runs along the north levee of the Sweetwater River Flood Control Channel, and would provide insufficient vertical and horizontal clearance, creating unsafe conditions for bike path users. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of National City hereby authorizes the closure of the Sweetwater Channel Levee bike path during the construction of a temporary falsework structure by the California Department of Transportation, beginning September 15, 2003, and ending no later than March 15, 2004. PASSED and ADOPTED this 19th day of August, 2003. ATTEST: Mich I rijR. Dalla, ity Clerk APPROVED AS TO FORM: /73 George H. Eiser, Ill City Attorney