Loading...
HomeMy WebLinkAboutCC RESO 2003 - 162RESOLUTION NO. 2003 — 162 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY APPROVING AN ADDENDUM TO THE NATIONAL CITY WAL-MART CERTIFIED ENVIRONMENTAL IMPACT REPORT WHEREAS, on February 4, 2003, pursuant to Resolution No. 2003-23, the City of National City ("City") as the CEQA responsible agency, certified the Environmental Impact Report for the Wal-Mart project ("EIR"); and WHEREAS, at the time the project was approved, it was determined that in order to mitigate both short-term and long-term traffic impacts, mitigation measures were required to be adopted in order to reduce those impacts to a level of insignificance; and WHEREAS, pursuant to Resolution No. 2003-23, the City adopted a Mitigation, Monitoring and Reporting Program ("MMRP"), in order to assure completion of the measures which would mitigate or avoid significant effects of the project upon traffic; and WHEREAS, since the certification of the EIR, the City of National City has implemented new programs to improve traffic circulation in the vicinity of the WaI-Mart Project, and additional traffic analysis has been conducted to determine whether or not the Project would impact streets and intersections as previously analyzed in the EIR; and WHEREAS, based upon the additional traffic analysis and new programs, an Addendum to the EIR (the "Addendum") was prepared to re-examine the need for traffic mitigation measures T-2, T-6, T-7 and T-9 and corresponding fair share contributions of the MMRP; and WHEREAS, as explained in the Addendum, the EIR is sufficient to satisfy CEQA requirements, and there is no substantial evidence that conditions are present which would require the preparation of a subsequent EIR; and WHEREAS, it is the conclusion of the Addendum that based upon additional analysis of the potential impacts of the project upon traffic, and because of new programs implemented by the City of National City to improve traffic circulation in the vicinity of the project, that Mitigation Measure T-2 should be modified, and that Mitigation Measures T-6, T-7 and T-9 and corresponding fair share contributions of the MMRP, are no longer required to mitigate impacts of the project upon traffic, and should be eliminated. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of National City hereby resolves and finds as follows: Section 1. That the Addendum to the EIR, together with all findings and conclusions set forth therein, is hereby approved. Said Addendum is on file in the office of the City Clerk. Section 2. That the revised Mitigation, Monitoring and Reporting Program, which is included in the Addendum, is hereby approved. Resolution No. 2003 — 162 November 11, 2003 Page Two Section 3. That Mitigation Measure T-2 is modified as set forth in the Addendum, and that Mitigation Measures T-6, T-7 and T-9 and corresponding fair share contributions, as set forth in the original MMRP, are no longer required to mitigate impacts of the project upon traffic, and are hereby eliminated. Section 4. That the EIR is sufficient to satisfy CEQA standards, and there is no substantial evidence that conditions are present which would require the preparation of a subsequent EIR. Section 5. That the City Manager is directed to file a Notice of Determination as to the Addendum with the County Clerk of the County of San Diego, following the adoption of this resolution. Passed and adopted this 18th day of November, 2003. ATTEST: f:f Mic ael Della, City/Clerk APPROVED AS TO FORM: George H. Eiser, III City Attorney