Loading...
HomeMy WebLinkAboutCC RESO 2005 - 40RESOLUTION NO. 2005 — 40 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY AUTHORIZING THE CITY ENGINEER TO EXECUTE CHANGE ORDER NO. 1 WITH FRANK & SON PAVING, INC. IN THE AMOUNT OF $72,633.99 FOR COSTS ATTRIBUTABLE TO DETERIORATED CONDITIONS IN PAVEMENTS, SIDEWALKS, CURBS, GUTTERS AND DRIVEWAYS, AND THE REPLACEMENT OF EXPANSIVE SOIL BASE MATERIAL (ENGINEERING SPECIFICATION 03-011) WHEREAS, the contract for the National City Street Resurfacing Project was awarded to Frank & Son, Inc. on August 17, 2004, by the adoption of Resolution No. 2004-163; and WHEREAS, Change Order No. 1, in the amount of $72,633.99, is necessary to cover costs attributable to deteriorated conditions in pavements, sidewalks, curbs, gutters and driveways, and the replacement of expansive soil base material. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of National City hereby authorizes the City Engineer to execute Change Order No. 1 with Frank & Son, Inc. in the amount of $72,633.99 to cover costs attributable to deteriorated conditions in pavements, sidewalks, curbs, gutters and driveways, and the replacement of expansive soil base material. PASSED and ADOPTED this 1st day of March, 2005. ATTEST: c ael Mi Della, ity Clerk APPROVED AS TO FORM: lir George H. Eiser, III City Attorney