HomeMy WebLinkAboutCC RESO 2005 - 40RESOLUTION NO. 2005 — 40
RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF NATIONAL CITY
AUTHORIZING THE CITY ENGINEER TO EXECUTE
CHANGE ORDER NO. 1 WITH FRANK & SON PAVING, INC.
IN THE AMOUNT OF $72,633.99 FOR COSTS ATTRIBUTABLE TO
DETERIORATED CONDITIONS IN PAVEMENTS, SIDEWALKS,
CURBS, GUTTERS AND DRIVEWAYS, AND THE
REPLACEMENT OF EXPANSIVE SOIL BASE MATERIAL
(ENGINEERING SPECIFICATION 03-011)
WHEREAS, the contract for the National City Street Resurfacing Project
was awarded to Frank & Son, Inc. on August 17, 2004, by the adoption of Resolution
No. 2004-163; and
WHEREAS, Change Order No. 1, in the amount of $72,633.99, is
necessary to cover costs attributable to deteriorated conditions in pavements,
sidewalks, curbs, gutters and driveways, and the replacement of expansive soil base
material.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City
of National City hereby authorizes the City Engineer to execute Change Order No. 1
with Frank & Son, Inc. in the amount of $72,633.99 to cover costs attributable to
deteriorated conditions in pavements, sidewalks, curbs, gutters and driveways, and the
replacement of expansive soil base material.
PASSED and ADOPTED this 1st day of March, 2005.
ATTEST:
c ael
Mi Della, ity Clerk
APPROVED AS TO FORM:
lir
George H. Eiser, III
City Attorney