RESOLUTION NO. 2005-122
RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF NATIONAL CITY
AUTHORIZING THE CITY ENGINEER TO EXECUTE
CHANGE ORDER NO. TWO WITH HMS CONSTRUCTION, INC. IN
THE AMOUNT OF $7,999.28 FOR MODIFICATION OF THE FOUNDATION
DUE TO EXISTING STORM WATER PIPES ENCOUNTERED
UNDER SIDEWALK FOR THE SWEETWATER ROAD AT
THE CALMOOR STREET AND FAIRLOMAS DRIVE
TRAFFIC SIGNAL IMPROVEMENT PROJECT
WHEREAS, the contract for the Sweetwater Road at Calmoor Street and
Fairlomas Drive Traffic Signal Improvement Project was awarded to HMS Construction,
Inc. on August 3, 2004, by the adoption of Resolution No. 2004-141; and
WHEREAS, during excavation for the footings of traffic signal locations I
and J, three storm drain pipes sixty-six inches (66) in diameter were encountered at a
depth of six feet two inches (6'2). The standard footing depth for each traffic signal is
eight feet (8'); and
WHEREAS, due to the storm drain pipes, modification of the standard
footings to a six-foot by six-foot (6' x 6) pad footing for traffic signal I, and a seven -foot
by seven -foot (7 x 7) pad footing for traffic signal J is required.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City
of National City hereby authorizes the City Engineer to execute Change Order No. 2
with HMS Construction, Inc. in the amount of $7,999.28 for the modification of the
standard footings to a six-foot by six-foot (6' x 6') pad footing for traffic signal I, and a
seven -foot by seven -foot (7 x 7) pad footing for traffic signal J at the Sweetwater Road
at Calmoor Street and Fairlomas Drive Traffic Signal Improvement Project.
PASSED and ADOPTED this 21st day of June, 2005.