Loading...
HomeMy WebLinkAboutCC RESO 2005 - 158RESOLUTION NO. 2005 —158 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY AUTHORIZING THE CITY ENGINEER TO EXECUTE CHANGE ORDER NO. THREE WITH HMS CONSTRUCTION, INC. FOR THE SWEETWATER ROAD AT THE CALMOOR STREET AND FAIRLOMAS DRIVE TRAFFIC SIGNAL IMPROVEMENT PROJECT IN THE AMOUNT OF $2,421.66 FOR COMPLIANCE WITH STATE ENERGY COMMISSION EFFICIENCY STANDARDS FOR TRAFFIC SIGNAL LIGHTS (Engineering Spec. No. 03-10) WHEREAS, the contract for the Sweetwater Road at Calmoor Street and Fairlomas Drive Traffic Signal Improvement Project was awarded to HMS Construction, Inc. on August 3, 2004, by the adoption of Resolution No. 2004-141; and WHEREAS, California law requires that appliances for traffic signal modules or lamps manufactured on or after March 1, 2003, comply with the Energy Commission's efficiency standards; and WHEREAS, the 16 yellow traffic signal incandescent lamps planned for this project must be substituted with LED equipment to comply with state law. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of National City hereby authorizes the City Engineer to execute Change Order No. 3 with HMS Construction, Inc. in the amount of $2,421.66 to substitute the incandescent lamps for the 16 yellow traffic signal lamps with LED equipment to comply with state law at the Sweetwater Road at Calmoor Street and Fairlomas Drive Traffic Signal Improvement Project. PASSED and ADOPTED this 2nd day of August, 2005. APPROVED AS TO FORM: 2r George H. Eiser, III City Attorney un.-, layor