HomeMy WebLinkAboutCC RESO 2005 - 176RESOLUTION NO. 2005 — 176
RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF NATIONAL CITY
APPROVING THE FINAL CONTRACT BALANCE
CHANGE ORDER WITH FRANK AND SON PAVING, INC.,
IN THE AMOUNT OF $33,238.72, FOR COSTS ATTRIBUTABLE TO
DETERIORATED CONDITIONS IN THE BASE AND PAVEMENT,
AND REPLACEMENT OF EXPANSIVE SOIL BASE MATERIAL
ON EAST 16TH STREET FROM "L" AVENUE TO "N" AVENUE,
ACCEPTING THE WORK, AND AUTHORIZING THE FILING OF
A NOTICE OF COMPLETION FOR THE NATIONAL CITY
RESURFACING PROJECT, FY 2003-2004, PROJECT
(Engineering Specification No. 03-11)
WHEREAS, at its regular meeting on August 17, 2004, the City Council adopted Resolution
No. 2004-163, which awarded a contract to Frank and Son Paving, Inc., for the National
City Resurfacing Project; and
WHEREAS, a change order is required to balance the final estimate, to add
and/or deduct items, to make quantity adjustments, and for costs attributable to deteriorated
conditions in the base and pavement, and replacement of expansive soil base material on
East 16th from "L" Avenue to "N" Avenue.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
National City hereby approves the Contract Final Balance Change Order for the National City
Resurfacing Project.
BE IT FURTHER RESOLVED by the City Council of the City of National City,
California, as follows:
It appearing to the satisfaction of the Engineering Department that all work
required to be done by Frank and Son Paving, Inc., Engineering Department Specification
No. 03-11, for the National City Resurfacing Project has been completed, the City Council of
National City hereby accepts said work, authorizes the filing of a Notice of Completion, and
orders that payment for said work be made in accordance with said contract.
ATTEST:
4
Mi• ael Dall. City Clerk
PASSED and ADOPTED this 16th day of August, 2005.
APPROVED AS TO FORM:
George H. Eiser, III
City Attorney
Passed and adopted by the Council of the City of National City, California, on August
16, 2005, by the following vote, to -wit:
Ayes: Councilmembers Inzunza, Morrison, Natividad, Parra, Zarate.
Nays: None.
Absent: None.
Abstain: None.
AUTHENTICATED BY:
NICK INZUNZA
Mayor of the City of National City, California
113
City y National City, California
CI f
By:
Deputy
I HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of
RESOLUTION NO. 2005-176 of the City of National City, California, passed and
adopted by the Council of said City on August 16, 2005.
City Clerk of the City of National City, California
By:
Deputy
RECORDING REQUESTED BY
WHEN RECORDED MAIL TO:
NAME: CITY OF NATIONAL CITY
ADDRESS: 1243 NATIONAL CITY BOULEVARD
NATIONAL CITY, CA 91950
NOTICE OF COMPLETION
CALIFORNIA CIVIL CODE SECTION 3093
NOTICE IS HEREBY GIVEN of the completion on August 16, 2005, of the NATIONAL CITY
RESURFACING PROJECT FY 03-04, SPEC. NO. 03-11
Work of improvement or portion of work of improvement under construction or alteration.
on the premises located at various locations in National City, Ca 91950
Street Address City State Zip Code
The undersigned owns the following interest or estate in said property:
City of National City
Nature of the interest or estate of owner (mortgagor, lessee, etc.)
Said work of improvement was performed on the property pursuant to a contract with
FRANK AND SON, INC.
Name of Original Contractor
The following work and material were supplied. Foreman, Laborers, Dump Trucks, Grinder,
Rackhoe, Paver, Concrete Mixers, Concrete Pumps, Milling Machine, Compaction Roller, and Tire
Roller
General statement of kind of labor, services, equipment or materials
The names and addresses of co -owners are: N/A
Dated:
Joint tenants, tenants in common, or other owners
August 16, 2005; 47
Signature of Owner Nick Inzunza, Mayor
City of National City, 1243 National City Blvd., National City, CA 91950
I, the undersigned, say: I have read the foregoing Notice of Completion and know the contents
thereof; the same is true of my own knowledge. I declare under penalty of perjury that the forgoing
is true and correct.
Executed on August 16, 2005, at National City, California.
Signature:
NICK INZUNZA, MAYOR
FORMS/N00097-10
CONTRACT CHANGE ORDER NO. 2
DATE: 8/16/05
PROJECT: National City Street Resurfacing Project, FY 03-04, Specification
No. 03-11
TO:
Mrs. Alicia Vasquez, President
Frank and Son Paving, Inc.
1019 Third Ave.
Chula Vista, CA 91911
DESCRIPTION OF CHANGE:
This change order is written to add item 28 to the contract (shown below)
Current Contract
Adjusted Contract
(CO #2)
No
Item
Unit
Bid Qty
Unit Price
Amount
Bid Qty
Unit Price
Amount
1
Mobilization
LS
1
$10,000.00
$10,000.00
1
S10,000.00
S10,000.00
2
Clearing and Grubbing
LS
1
S15,000.00
$15,000.00
1
$15,000.00
$15,000.00
3
Unclassified Excavation
CY
400
$30.00
$12,000.00
400
$30.00
$12,000.00
4
Traffic Control
LS
1
$20,000.00
S20,000.00
1
$20,000.00
$20,000.00
5
R&R Street Section 1.5" AC on
8" Base
SF
83,944
$2.70
$226,648.80
83,944
$2.70
$226,648.80
6
R&.R Street Section 2" AC on
10" Base
SF
39,454
$3.75
$147,952.50
39,454
$3.75
$147,952.50
7
R&R Street Section 3" AC on
8"
SF
4,900
$5.50
S26,950.00
4900
$5.50
$26,950.00
8
R&R AC Only
TONS
2,556
$55.00
$140,580.00
2,611.7
$55.00
$143,643.50
9
Pavement Milling
LF
26,043
$1.13
S29,428.59
30,119
$1.13
$34,034.47
10
Pavement Fabric
SY
66,082
$0.71
S47,050.38
66,082
$0.71
$46,918.22
11
A.C. Overlay
TONS
4,625
$47.70
$220,612.50
5,172.8
$47.70
$246,742.56
12
Adjust Manholes to Grade
EA
40
$350.00
$14,000.00
40
$350.00
$14,000.00
13
Adjust Monuments to Grade
EA
7
$550.00
$3,850.00
7
$550.00
$3,850.00
14
R&R Cross Gutter
SF
3,788
$7.50
$28,410.00
3,788
$7.50
$28,410.00
15
New Cross Gutter
SF
154
$7.00
S1,078.00
154
$7.00
$1,078.00
16
R&R Sidewalk
SF
3,696
$6.50
$24,024.00
4,922.5
$6.50
$31,996.25
17
NewG-1 Curb
LF
85
$16.00
$1,360.00
85
$16.00
$1,360.00
18
R&R Curb and Gutter
LF
203
$25.00
$5,075.00
324.30
$25.00
$8,107.50
19
Traffic Striping
LS
1
S13,000.
$13,000.00
1
$13,000.00
$13,000.00
20
Reinstall Traffic Loops
EA
19
$260.00
$4,940.00
19
$260.00
$4,940.00
21
New Driveway
SF
432
$6.00
$2,592.00
432
$6.00
$2,592.00
22
R&R Driveway
SF
386
S8.00
$3,088.00
2,901
$8.00
$23,208.00
Page 1
CONTRACT CHANGE ORDER NO. 2
23
Under sidewalk Drain D-27
EA
1
$1,300.00
$1,300.00
1
$1,300.00
$1,300.00
24
Storm Drain Cover D-25
EA
1
$600.00
$600.00
1
$600.00
$600.00
25
Fill Material
CY
12
$150.00
$1,800.00
12
S150.00
$1,800.00
26
Retaining Wall
SF
260
$85.00
S22,100.00
260
$85.00
$22,100.00
27
Extra work due to Base/sub-
base betterment of soil
conditions
LS
1
$4,000.00
$4,000.00
Extra Work Item
28
Extra work due to
Base/Subbase betterment of
pavement conditions on E.
16th Street
LS
1
$33,238.72
$33,238.72
Totals
$1,023,439.77
$1,129,312.49
DISCUSSION:
Line Item 28 has been added to the contract at the City's request to provide
compensation to the contractor for extra work needed to remove base/sub-base material
due to encountering expansive soils, which could not be compacted properly on E. 16°i
Street between L Avenue and N avenue. This item includes mobilization, removal and
replacement of base and AC pavement, removal and installation of traffic loops,
pavement fabric, milling a pavement hump, seal and sand finish and double yellow line
stripping. The work will include labor, material and equipment.
The requested work will ensure that the current street improvements currently being done
will provide quality and durability to our pavements.
CONTRACT ADJUSTMENT:
As a result of this change order the contract price is adjusted as follows:
1. The contract price is increased in the amount of $33,238.72 from the current
contract price of $1,096,073.77 to a new contract price of $1,129,312.49.
2. The contract time is increased by thirty (30) working days. The contract
completion date was previously established as Friday, February 25, 2005. The
new contract completion date is therefore established as Friday, April 8, 2005.
This change order shall be considered full compensation for furnishing and
installing the materials, labor, tools and equipment, profit, overhead, and all
incidentals for performing the work described above. Frank and Son Paving, Inc.
will not be entitled to damages or additional payment for delays as described in
the 1997 edition of the Standard Specifications for Public Works Construction,
Section 6-6.3, for performing the work as described above.
Page 2
CONTRACT CHANGE ORDER NO. 2
RECOMMENDED FOR APPROVAL BY:
Alberto Grie:e '' ss 'cia Ci 4i 'neer
Engineering
APPROVED BY:
Ms. Alicia Vasquez, President
Frank and Son Paving, Inc.
Date
Mr. Frank Vasquez, Vice President
Frank and Son Paving, Inc. Date
Stephen M. Kirkpatrick
City Engineer Date