HomeMy WebLinkAbout2006 CC RESO 2006-194 CDCRESOLUTION NO. 2006 — 194 RESOLUTION OF THE COMMUNITY DEVELOPMENT COMMISSION OF THE CITY OF NATIONAL CITY APPROVING DOWNTOWN SPECIFIC PLAN CONSISTENCY REVIEW FOR DEVELOPMENT PROJECT, 'PARK LOFTS' LOCATION: 1509, 1531, 1535 NATIONAL CITY BOULEVARD AND 49 EAST 16TH STREET APPLICANT: WILLMARK COMMUNITIES, INC. CASE FILE NO.: DSP-2006-1 WHEREAS, .the applicant has filed an application for Downtown Specific Plan Consistency Review; and WHEREAS, the adopted procedures for Consistency Review require the Community Development Commission Board to consider all development proposals at a public hearing; and WHEREAS, the Community Development Commission Board considered the application at a duly advertised public hearing held on August 22, 2006 at which time oral and documentary evidence was presented; and WHEREAS, at said public hearing the Community Development Commission Board considered the recommendation and findings of the staff report contained in Case File No. DSP-2006-1, which is incorporated herein by reference, along with the evidence and testimony at said hearing; and WHEREAS, this action is taken pursuant to all applicable procedures required by State law and City law; and WHEREAS, the action recited herein is found to be essential for the preservation of public health, safety, and general welfare; and WHEREAS, the Community Development Commission Board desires to achieve the goals and implement the policies of the Downtown Specific Plan; and WHEREAS, the Community Development Commission Board has determined that the adoption of the action recited herein would further the goals and policies of the Downtown Specific Plan. NOW, THEREFORE, BE IT RESOLVED that the Community Development Commission Board finds that the testimony and evidence presented at the public hearing support the following findings: 1. Basic Compliance — The project complies with the maximum height, minimum setback, maximum floor -area -ratio, maximum density (where applicable), minimum build -to -line, and minimum parking requirements and standards of the Specific Plan. 2. Creating a Place for People — The project enhances the pedestrian experience with attractive and distinctive design and amenities. 3. Enrich the Existing — The project enriches the qualities of the existing downtown by exhibiting a distinctive design that arises from and complements its setting, including the scale of the downtown, the block, and the street. Resolution No. 2006 —194 September 5, 2006 Page 2 4. Make Connections — The project is integrated physically and visually with its surroundings. The project exhibits attention on how to get around by foot, bicycle, public transportation and automobile — in that order. 5. Work with the Landscape — The project strikes a balance between the natural and man- made environment and utilizes each site's intrinsic resources — the climate, landform, landscape, and ecology to maximize energy conservation and create distinctive amenities. 6. Mix Uses and Forms — The project weaves together different building forms, uses, textures, and densities. 7. Design for Change — The project is designed for energy and resource efficiency; creating flexibility in the use of property, public spaces (including the sidewalk) and the service infrastructure and introduces or acknowledges through design; new approaches to transportation, traffic management and parking. BE IT FURTHER RESOLVED that the Community Development Commission Board has considered that the Program Environmental Impact Report for the Downtown Specific Plan serves as adequate environmental documentation, together with any comments received during the public review process, and finds on the basis of the whole record that that the project was adequately considered by the Program Environmental Impact Report, which reflects the Community Development Commission Board's independent judgment and analysis, and hereby authorizes the filing of a Notice of Determination. BE IT FURTHER RESOLVED that based on the findings hereinbefore stated, that the Community Development Commission Board approves said Downtown Specific Plan Consistency Review subject to the following conditions: 1. Mitigation Measures. The project shall be subject to all applicable mitigation measures of the adopted Mitigation Monitoring and Reporting Program of the certified Program EIR for the Downtown Specific Plan. 2. Approved Plan. The project shall be developed and maintained in substantial conformance with Exhibit (DSP-2006-1), dated June 20, 2006, except as modified by the conditions of approval. 3. Paseo Plans. The applicant shall submit paseo improvement plans for approval and shall install and construct all improvements pursuant to the approved plans prior to occupancy. The paseo shall be designed to allow ingress and egress of emergency, maintenance, and service vehicles to the adjacent park and library. Restroom facilities shall be provided if determined to be feasible and desirable by the City. 4. Library Parking. The applicant shall install a second driveway approach on National City Boulevard to the adjacent library parking lot, and shall restripe and improve the parking lot to provide the maximum number of parking spaces possible. 5. Landscape Plans. The applicant shall submit landscape and irrigation plans for approval and shall install and construct all improvements pursuant to the approved plans prior to occupancy. Resolution No. 2006 —194 September 5, 2006 Page 3 6. Lighting Plans. The applicant shall submit lighting plans for approval and shall install and construct all lighting pursuant to the approved plans prior to occupancy. Lighting shall be designed to provide adequate illumination for safety, security, identification, and direction as well as for landmark visibility of the primary buildings and/or significant features of the project. 7. Sign Program. The applicant shall submit a sign program for approval, and all signs shall be designed and installed pursuant to the approved sign program. 8. Public Art Program. The applicant shall submit a public art program for approval and shall install, construct, or implement the approved public art program prior to occupancy. 9. Green Design. The applicant shall incorporate green design, energy efficiency, waste reduction, recycling, conservation, and sustainable design in the project to the maximum extent feasible. 10. Public Improvements. The applicant shall submit improvement plans for all adjacent public rights -of -way for approval. The plans shall be consistent with the Downtown Specific Plan, including the Open Space Framework, the Streetscape Master Plan, and the Design Guidelines. The improvements shall include but not be limited to streets; alleys; curbs and gutter; sidewalks; medians; parkways; landscape; street lights; street furniture; traffic control; parking facilities; utilities; water, sewer, and drainage facilities; and other necessary facilities and infrastructure. The applicant shall install and construct the improvements pursuant to the approved plans prior to occupancy. 11. Engineering Requirements. The applicant shall comply with all engineering requirements, including the listed requirements contained in Engineering Department memorandum dated April 17, 2006. a) A Hydrology study (100 year flood) is required for the new project. The study should consider the proposed project area to the closest municipal storm drain collection point. The study should consider the adequacy of the existing storm drain system to convey any additional run off. All Hydrology study findings and recommendations are part of Engineering Department requirements. b) The Priority Project Applicability checklist for the Standard Urban Storm -water Mitigation Plan (SUSMP) is required to be completed and submitted to the Engineering Department. The checklist will be required when a project site is submitted for review of the City Departments. The checklist is available at the Engineering Department. If it is determined that the project is subject to the `Priority Project Permanent Storm Water BMP Requirements" and the City of National City Storm Water Best Management Practices of the Jurisdictional Urban Runoff Management Program (JURMP), an approved SUSMP will be required prior to issuance of an applicable engineering permit. The SUSMP shall be prepared by a Registered Civil Engineer. Resolution No. 2006 — 194 September 5, 2006 Page 4 c) The Best Management Practices (BMPs) for the maintenance of the proposed construction shall be undertaken in accordance with the National Pollutant Discharge Elimination System (NPDES) regulations which may require a Storm Water Pollution Prevention Plan (SWPPP) for the project. An approved SWPPP will be required prior to issuing of a construction permit. d) All surface run-off shall be collected by approved drainage facilities and directed to the street by sidewalk underdrains or a curb outlet. Adjacent properties shall be protected from surface run-off resulting from this development. e) A grading and drainage plan shall be submitted showing all of the proposed and existing on -site and off -site improvements. The plan shall be prepared in accordance with the City's standard requirements by a Registered Civil Engineer. All necessary measures for prevention of storm water pollution and hazardous material run-off to the public storm drain system from the proposed parking lot or development shall be implemented with the design of the grading. This shall include the provision of such devices as storm drain interceptors, clarifiers, or filters. Best Management Practices for the maintenance of the parking lot, including sampling, monitoring, and cleaning of private catch basins and storm drains, shall be undertaken in accordance with the National Pollution Discharge Elimination System (NPDES) regulations. A private storm water treatment maintenance agreement shall be signed and recorded. The checklists for preparation of the grading plan drainage plan and Standard Urban Storm Water Mitigation Plan (SUSMP) are available at the Engineering Department. f) A National Pollutant Discharge Elimination System (NPDES) permit is required for discharged of storm water runoff associated with construction activity where clearing, grading, and excavation results in a land disturbance. A construction stormwater permit shall be obtained from the Regional Water Quality Control Board. A copy of the permit shall be given to the City of National City Engineering Department prior to any work beginning on the project. A sewer permit will be required. A sewer study shall consider the adequacy of the existing sewer system. The sewer study recommendations shall be part of the Engineering Department Requirements. The method of sewage collection and disposal shall be shown on the grading/drainage plan. Any new sewer lateral in the City right-of-way shall be 8-inch in size with a clean out and the installation of a manhole in the street. A sewer stamp "S" shall be provided on the curb to mark the location of the lateral. A sewer main runs through the alley that shall be addressed or relocated if building is to be constructed in this location. h) A soils engineering report shall be submitted for the Engineering Department's review, after Planning Commission approval. The report shall address the adequacy of the building pads, the criteria for any new retaining wall design, the maximum allowable soil bearing pressure. As a minimum, the parking lot pavement sections shall be 2-inch A.C. over 4-inch Class II aggregate base. The street pavement sections shall be in accordance with National City modified Standard Drawing G-34. All soils report findings and recommendations shall be part of the Engineering Department requirements. g) Resolution No. 2006 — 194 September 5, 2006 Page 5 i) The deteriorated portions of the existing street improvements (including sidewalks and curbs) along the property frontages shall be removed and replaced. j) A permit shall be obtained from the Engineering Department for all improvement work within the public right-of-way, and any grading construction on private property. k) Street improvements shall be in accordance with City Standards. Abandoned driveway aprons shall be replaced with curbs, gutters, and sidewalks. I) A title report shall be submitted to the Engineering Department, after the Planning Commission approval, for review of all existing easements and the ownership of the property. m) A cost estimate for all of the proposed grading, drainage, street improvements, landscaping and retaining wall work shall be submitted with the plans. A performance bond equal to the approved cost estimate shall be posted. Three percent (3%) of the estimated cost shall also be deposited with the City as an initial cost for plan checking and inspection services at the time the plans are submitted. The deposit is subject to adjustment according to actual worked hours and consultant services. n) An existing 35-foot wide drainage easement reserved to the City of National City exists at the sough side of the property. No building encroachment will be allowed within the easement. The easement shall be shown on the grading plans and on the final map o) The Final Map shall meet all of the requirements of the Subdivision Map Act, and the City of National City Municipal Codes including certification, acknowledgement, complete boundary information and monumentation. p) The subdivider shall submit an approval letter from Sweetwater Authority stating fire flow requirements have been met. If additional improvements are needed, the developer shall enter into an agreement for the water improvements with the Authority prior to obtaining the Final Map approval. q) The developer shall bond for the monumentation, the public improvements and the on -site grading, drainage, landscaping, and other improvements through an agreement with the City prior to the approval of the Final Map. r) The proposed street and alley vacation at this site shall be approved by the City council prior to the final map approval. City vehicle access shall be provided to maintain the park. s) All utility distribution facilities within the boundaries of the subdivision, and within the half street abutting the new subdivision, shall be placed underground. t) The Final Map shall be recorded prior to issuance of any building permit. Resolution No. 2006 — 194 September 5, 2006 Page 6 u) All new property line survey monuments shall be set on private property, unless otherwise approved. v) The Final Map shall use the California Coordinate System for its "Basis of Bearings" and express all measured and calculated bearings in terms of the system. The angle of grid divergence from a true meridian and the north point shall appear on the map. Two measured ties from the boundary of the property to existing horizontal control stations shall be shown. 12. Public Works Requirements. The applicant shall comply with all public works requirements, including the listed requirements contained in Public Works Department memoranda dated January 5, 2006 and April 12, 2006. a) The developer shall replace the existing sidewalks adjacent to the project. b) 15th Street pedestrian paseo — Any material other than standard asphalt concrete hot mix shall be maintained by the project HOA. Ingress and egress via the paseo to the City Library shall be preserved. c) Sewer facilities — The developer shall agree to obtain occupancy of the project after the City completes its trunk line upgrade project. d) The developer shall replace the existing street trees with a tree palette commensurate with the building's architecture and adjacent landscaping theme. e) The developer shall install streetlights along street and paseo frontages. f) Vine type plants shall be planted to cover the wall along the east project boundary, and shall be maintained by the project HOA. g) Access to the park and library for emergency vehicles and delivery trucks (10-ton) shall be maintained. 13. Fire Department Requirements. The applicant shall comply with all Fire Department requirements, including the listed requirements contained in Fire Department memoranda dated March 21, 2006. a) Project to be designed, developed and constructed in compliance with the California Fire Code (CFC) 2001 edition or CFC in effect at time of permit issuance and the most current National Fire Protection Association (NFPA) Standards as adopted by the City of National City b) Automatic fire sprinkler system will be required. c) Automatic and manual fire alarm system with communications system will be required. d) Class I standpipe system will be required Resolution No. 2006 —194 September 5, 2006 Page 7 e) Emergency vehicle access will be required on the north side of the structure. Roadway to have a minimum width of 20 feet with a minimum vertical clearance of 13 feet, 6 inches. Turnaround will be required. f) Clear and easily accessible emergency ingress and egress to and throughout the facility must be provided and maintained. 14. Building Department Requirements. The applicant shall comply with all Building Department requirements, and plans shall comply with the 2001 editions of the California Building Code, the California Mechanical Code, the California Plumbing Code, the California Electrical Code, and California Title 24 energy and handicapped regulations. 15. Police Department Requirements. The applicant shall comply with all Police Department requirements, including the requirements contained in Police Department memorandum dated March 13, 2006. a) The project shall comply with the crime free multi -housing criteria and crime prevention through environmental design standards. 16. National City Transit Requirements. The applicant shall comply with all National City Transit requirements, including the requirements contained in National City Transit memorandum dated April 20, 2006. a) Evaluate the installation of a new bus stop along National City Boulevard near the intersection of 14th Street (Library) or other nearby locations with a shelter, benches, route map and trash containers. This shelter should include an electrical lighting component and at least two CCTV security cameras with a direct feed to NCPD. b) Include this stop (and project) in any evaluation of a Green Car -Community circulator shuttle operation such as under consideration with Revolution R2 (Constellation Property Group) S-2006-6/DSP-2005-1 & Centro (Constellation Property Group) S- 2006-6/DSP-2005-1. c) The developer should bear all associated costs to implement any Transit recommendations. d) Submit the plans to MTS Planner Mike Daney (mike.daney@sdmts.com) for his review and comments. 17. Covenants, Conditions, and Restrictions. The applicant shall submit a declaration of covenants, conditions, and restrictions for approval prior to approval of a final subdivision map. The CC&Rs shall run with the land, clearly setting forth privileges and responsibilities, including maintenance, involved in the common ownership of buildings, streets, parking areas, walks, open spaces, recreation areas, utilities, and common areas and facilities. The CC&Rs shall allow the City of National City the authority but not the obligation to assume the maintenance of the property and assess the full cost, including overhead costs, as a lien against the property if said property is not adequately maintained pursuant to the CC&Rs. The CC&Rs shall include a determination that the funds provided Resolution No. 2006 —194 September 5, 2006 Page 8 by the maintenance provisions will be sufficient to cover all contemplated costs. The CC&Rs shall be approved as to form and content by the City Attorney of the City of National City. 18. Property Owners Association. A corporation, association, property owners' group, or similar entity shall be formed with the right to assess properties that are jointly owned with interests in the common areas and facilities in the entire development to meet the expenses of such entity, and with authority to control, and the duty to maintain, all such common areas and facilities. Such entity shall operate under recorded CC&Rs approved by the City of National City, which shall include compulsory membership of all property owners and flexibility of assessments to meet changing costs of maintenance, repairs, and services. 19. Business Improvement District. Pursuant to the Implementation Program of the Downtown Specific Plan, the subject property shall be incorporated into the Morgan Square Business Improvement District and assessed as provided for in the district for purposes for which the district was formed. 20. Landscape Maintenance District. Pursuant to the Implementation Program of the Downtown Specific Plan, all properties within the boundaries of the Downtown Specific Plan shall be incorporated into a landscape maintenance district and assessed as provided for in the district for purposes for which the district was formed. 21. Parking District. Pursuant to the Implementation Program of the Downtown Specific Plan, all properties within the boundaries of the Downtown Specific Plan shall be incorporated into a parking district and assessed as provided for in the district for purposes for which the district was formed. 22. Acceptance of Conditions. The applicant and property owner shall sign and have notarized an Acceptance Form acknowledging and accepting all conditions of approval of this permit. Failure to return the signed and notarized Acceptance Form within 30 days of approval of this permit shall automatically terminate this permit. The applicant shall record a Notice of Restriction on Real Property with the San Diego County Recorder. The Notice of Restriction shall provide that the conditions of approval of this permit are binding on all present and future interest or estate holders of the property. The Notice of Restriction shall be approved as to form by the City Attorney of the City of National City and signed by the City Manager of the City of National City prior to recordation. 23. Expiration. This permit shall expire two years after the effective date of approval unless prior to that date a request for a time extension has been filed in writing to the Community Development Commission. The process for a time extension shall be the same as the process for application for the original permit. BE IT FURTHER RESOLVED that copies of this Resolution shall be transmitted forthwith to the applicant. Resolution No. 2006 —194 September 5, 2006 Page 9 BE IT FURTHER RESOLVED that this Resolution shall become effective and final on the day following the Community Development Commission meeting where the resolution is adopted. The time within which judicial review of this decision may be sought is governed by the provisions of Code of Civil Procedure Section 1094.6. PASSED and ADOPTED this 5th day of September, 2006. ATTES is Zapata, ect tary APPROVED AS TO FORM: George H. Eiser, III Legal Counsel Passed and adopted by the Community Development Commission of National City, California, on September 5, 2006, by the following vote, to -wit: Ayes: Councilmembers Inzunza, Morrison, Natividad, Parra, Zarate. Nays: None. Absent: None. Abstain: None. AUTHENTICATED BY: NICK INZUNZA Chairman Counity Development Commission Secreta omm ty Development Commission By: Deputy I HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of RESOLUTION NO. 2006-194 of the Community Development Commission of the City of National City, California, passed and adopted on September 5, 2006. Secretary Community Development Commission By: Deputy