HomeMy WebLinkAboutCC RESO 2006-203RESOLUTION NO. 2006 — 203
RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF NATIONAL CITY
AUTHORIZING THE CITY ENGINEER TO EXECUTE
CHANGE ORDER NO. 2 WITH MJC CONSTRUCTION, INC., TO EXCLUDE THE
ADDITIVE ALTERNATIVES A4 AND A5 (CENTRAL BOARDWALK AND CONNECTIONS)
FROM THE ORIGINAL CONTRACT, AND ADD THE NORTH/SOUTH (NEW ALIGNMENT)
BOARDWALK BASED ON TIME AND MATERIALS WITH NO CHANGE
IN THE COST FOR THE PARADISE CREEK PARK PROJECT
WHEREAS, the contract for the construction of the first phase of the Paradise
Creek Educational Park was awarded to MJC Construction, Inc., on August 16, 2005, by the
adoption of Resolution No. 2005-179; and
WHEREAS, on December 20, 2005, the City Council approved Change Order
No. 1, in the not to exceed amount of $150,000, for the removal and disposal of approximately
1,500 cubic yards of contaminated soil from the Paradise Creek site in accordance with State
and federal regulations; and
WHEREAS, during the installation of raised boardwalks and pile driving along the
west side of Paradise Creek, the contractor discovered layers/pieces of hard material at various
design depths and locations that resulted in a new boardwalk alignment based on Time and
Materials; and
WHEREAS, due to the shift in the original alignment of the boardwalks and piling
shaft locations, the central boardwalk and connection (additive Alternates A4 and A5) were
adjusted accordingly and designated by the new alignments as the north/south and east/west
boardwalk; and
WHEREAS, Change Order No. 2 is necessary to exclude the Additive
Alternatives A4 and A5 (Central Boardwalk and Connections) in the amount of $315,000 from
the original contract, and add the installation of the north/south (new alignment) boardwalk
based on Time and Materials, in a not to exceed amount of $315,000.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of
National City hereby authorizes the City Engineer to execute Change Order No. 2 with MJC
Construction, Inc., to exclude the Additive Alternatives A4 and A5 (Central Boardwalk and
Connections) in the amount of $315,000 from the original contract, and add the installation of
the north/south (new alignment) boardwalk based on Time and Materials, in a not to exceed
amount of $315,000.
ATTEST:
PASSED and ADOPTED this 3rd day of October, 2006.
t
6
Micel Dalla, Cit Cle
Nick Inzilrza,
APPROVED AS TO FORM:
George H. ETser, III
City Attorney
Passed and adopted by the Council of the City of National City, California, on October
3, 2006, by the following vote, to -wit:
Ayes: Councilmembers Inzunza, Morrison, Natividad , Parra, Zarate.
Nays: None.
Absent: None.
Abstain: None.
AUTHENTICATED BY:
NICK INZUNZA
Mayor of the City of National City, California
City CI
ity cff National City, California
By:
Deputy
I HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of
RESOLUTION NO. 2006-203 of the City of National City, California, passed and
adopted by the Council of said City on October 3, 2006.
City Clerk of the City of National City, California
By:
Deputy