HomeMy WebLinkAboutCC RESO 2006-203RESOLUTION NO. 2006 — 203 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY AUTHORIZING THE CITY ENGINEER TO EXECUTE CHANGE ORDER NO. 2 WITH MJC CONSTRUCTION, INC., TO EXCLUDE THE ADDITIVE ALTERNATIVES A4 AND A5 (CENTRAL BOARDWALK AND CONNECTIONS) FROM THE ORIGINAL CONTRACT, AND ADD THE NORTH/SOUTH (NEW ALIGNMENT) BOARDWALK BASED ON TIME AND MATERIALS WITH NO CHANGE IN THE COST FOR THE PARADISE CREEK PARK PROJECT WHEREAS, the contract for the construction of the first phase of the Paradise Creek Educational Park was awarded to MJC Construction, Inc., on August 16, 2005, by the adoption of Resolution No. 2005-179; and WHEREAS, on December 20, 2005, the City Council approved Change Order No. 1, in the not to exceed amount of $150,000, for the removal and disposal of approximately 1,500 cubic yards of contaminated soil from the Paradise Creek site in accordance with State and federal regulations; and WHEREAS, during the installation of raised boardwalks and pile driving along the west side of Paradise Creek, the contractor discovered layers/pieces of hard material at various design depths and locations that resulted in a new boardwalk alignment based on Time and Materials; and WHEREAS, due to the shift in the original alignment of the boardwalks and piling shaft locations, the central boardwalk and connection (additive Alternates A4 and A5) were adjusted accordingly and designated by the new alignments as the north/south and east/west boardwalk; and WHEREAS, Change Order No. 2 is necessary to exclude the Additive Alternatives A4 and A5 (Central Boardwalk and Connections) in the amount of $315,000 from the original contract, and add the installation of the north/south (new alignment) boardwalk based on Time and Materials, in a not to exceed amount of $315,000. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of National City hereby authorizes the City Engineer to execute Change Order No. 2 with MJC Construction, Inc., to exclude the Additive Alternatives A4 and A5 (Central Boardwalk and Connections) in the amount of $315,000 from the original contract, and add the installation of the north/south (new alignment) boardwalk based on Time and Materials, in a not to exceed amount of $315,000. ATTEST: PASSED and ADOPTED this 3rd day of October, 2006. t 6 Micel Dalla, Cit Cle Nick Inzilrza, APPROVED AS TO FORM: George H. ETser, III City Attorney Passed and adopted by the Council of the City of National City, California, on October 3, 2006, by the following vote, to -wit: Ayes: Councilmembers Inzunza, Morrison, Natividad , Parra, Zarate. Nays: None. Absent: None. Abstain: None. AUTHENTICATED BY: NICK INZUNZA Mayor of the City of National City, California City CI ity cff National City, California By: Deputy I HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of RESOLUTION NO. 2006-203 of the City of National City, California, passed and adopted by the Council of said City on October 3, 2006. City Clerk of the City of National City, California By: Deputy