RESOLUTION NO. 2008-61
A "RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
NATIONAL CITY AUTHORIZING THE CITY ENGINEER TO
EXECUTE CHANGE ORDER NOS. TWO, THREE, AND
FOUR WITH PORTILLO CONCRETE, INC. FOR ADDITIONAL
WORK (SEATING PLATFORMS REMOVAL, PLANTING A NEW
PALM TREE, RECONFIGURATION OF TRAFFIC CIRCLE
PLANTER, AND INSTALLATION OF A LARGE TREE) IN THE
TOTAL AMOUNT OF $103,035.28 FOR THE NATIONAL CITY
BOULEVARD STREETSCAPE AND 9TH STREET FOUNTAIN
PLAZA IMPROVEMENTS PROJECT."
(Community Services)
This Resolution was not adopted at the
City Council / Community Development Commission Regular Meeting
of April 15, 2008.
DATE: April 22, 2008
A
ichael R. Dalla, CMC
City Clerk of the
City of National City
+++ NOT ADOPTED +++
RESOLUTION NO. 2008 — 61
RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF NATIONAL CITY
AUTHORIZING THE CITY ENGINEER TO EXECUTE
CHANGE ORDER NOS. TWO, THREE, AND FOUR WITH
PORTILLO CONCRETE, INC. FOR ADDITIONAL WORK
(SEATING PLATFORMS REMOVAL, PLANTING A NEW PALM TREE,
RECONFIGURATION OF TRAFFIC CIRCLE PLANTER, AND
INSTALLATION OF A LARGE TREE) IN THE TOTAL AMOUNT OF
$103,035.28 FOR THE NATIONAL CITY BOULEVARD STREETSCAPE
AND 9TH STREET FOUNTAIN PLAZA IMPROVEMENTS PROJECT
WHEREAS, a contract in the amount $3,298,308.50 for the National City
Boulevard Streetscape and 9`h Street Fountain Plaza Improvements Project was awarded to
Portillo Concrete, Inc. on January 9, 2007, by the adoption of Resolution No. 2007-4; and
WHEREAS, on April 3, 2007, the City Council approved Change Order No. 1 in
the amount of $42,419.76 for the removal and disposal of ties and ballast that were discovered
during excavation, and the replacement of the compacted Class "A" topsoil; and
WHEREAS, Change Orders 2, 3, and 4 are requested for the following changes
requested by the City:
1. Remove two existing seating platforms and replace them with pavers to
match the surface with the existing surrounding improvements;
2. Remove the existing tree and landscaping improvements in the traffic
circle planter and replace it with a large Deador Cedar tree, and redesign
the planter's configuration to accommodate the proposed tree; and
3. Remove the dead palm tree that is located in the median north of 12th
Street.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of
National City hereby authorizes the City Engineer to execute Change Order Nos. 2, 3, and 4
with Portillo Concrete, Inc. for additional work in the total amount of $103,035.28 for the National
City Boulevard Streetscape and 9th Street Fountain Plaza Improvements.
PASSED and ADOPTED this 15th day of April, 2008.
Ron Morrison, Mayor
ATTEST: APPROVED AS TO FORM:
Michael R. Della, City Clerk George H. Eiser, III
City Attorney