HomeMy WebLinkAboutCC RESO 2008-188NOT ADOPTED RESOLUTION NO. 2008-188 A "RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY RATIFYING CHANGE ORDER NOS. 3, 16, 17, 18, AND 24 IN THE AMOUNT OF $65,644.63 FROM M.A. STEVENS CONSTRUCTION FOR THE NATIONAL CITY FORMER LIBRARY REMODEL PROJECT, AND AUTHORIZING THE ALLOCATION AND TRANSFER OF FUNDS IN THE NOT -TO -EXCEED AMOUNT OF $275,000 FOR ADDITIONAL WORK TO COMPLETE THE PROJECT." (Engineering) This Resolution was not adopted at the City Council / Community Development Commission Regular Meeting of September 16, 2008. DATE: September 18, 2008 chael R. Dralla, CMC Recording Secretary City of National City -- NOT ADOPTED -- RESOLUTION NO. 2008 — 188 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY RATIFYING CHANGE ORDER NOS. 3, 16, 17, 18, AND 24 IN THE AMOUNT OF $65,644.63 FROM M.A. STEVENS CONSTRUCTION FOR THE NATIONAL CITY FORMER LIBRARY REMODEL PROJECT, AND AUTHORIZING THE ALLOCATION AND TRANSFER OF FUNDS IN THE NOT -TO -EXCEED AMOUNT OF $275,000 FOR ADDITIONAL WORK TO COMPLETE THE PROJECT WHEREAS, on March 4, 2008, the City Council adopted Resolution No. 2008-43 awarding a contract in the total amount of $1,108,000 to M.A. Stevens Construction, Inc., for the National City Former Library Remodel Project; and WHEREAS, Change Order Nos. 3, 16, 17, 18, and 24 in the amount of $65,644.63, which were processed within the original contingency budget, for over excavating and re -compacting of the retaining wall footing, insulation of drywalls for exterior walls, building the interior rake walls, adding the data/voice communication locations, and providing the material to the San Diego Repertory to install the new wood raised flooring in the rehearsal rooms are submitted for ratification; and WHEREAS, because the design plans for the remodel were based on a surface evaluation due to no record drawings being available to indicate the existing condition of the old library building, additional work was discovered during the demolition phase of the project that was not included in the remodel construction plan; and WHEREAS, the additional work will also include the installation of a fire sprinkler system, which is required to meet the Building Code and Fire Code requirements, and additional modifications to the museum to modify both the existing fluorescent lights to more appealing and decorative track lights and the entrance door to the glass front door at the former historic room area; and WHEREAS, the allocation of additional funds in the not to exceed amount of $275,000 from Tax Increment Undesignated Fund Balance Account No. 511-2501 to National City Former Library Remodel Project Account No. 511-409-500-598-3734 are necessary for the work necessary to complete the Project. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of National City hereby ratifies Change Order Nos. 3,16, 17, 18, and 24 in the amount of $65,644.63 from M.A. Stevens Construction. BE IT FURTHER RESOLVED that the City Council hereby authorizes the allocation of the not to exceed amount of $275,000 from Tax Increment Undesignated Fund Balance Account No. 511-2501 to National City Former Library Remodel Project Account No. 511-409-500-598-3734 to fund the work necessary to complete the Project. FROM: Account No. 511-2501 Tax Increment Undesignated Fund Balance TO: Account No. 511-409-500-598-3734 National City Former Library Remodel Project Resolution No. 2008 — 188 September 16, 2008 Page 2 AMOUNT: $275,000 PURPOSE: To complete the National City Former Library Remodel Project PASSED and ADOPTED this 16th day of September, 2008. Ron Morrison, Mayor ATTEST: Michael R. Dalla, City Clerk APPROVED AS TO FORM: George H. Eiser, Ill City Attorney