HomeMy WebLinkAboutCC RESO 12,288RESOLUTION NO. 12,288
RESOLUTION APPROVING THE 1976-78 FEDERAL
AID URBAN MULTI -YEAR PROGRAM LIST
WHEREAS, Federal Aid Urban Program Procedures were
adopted by the City of National City by Resolution No. 12,287,
and
WHEREAS, as a requirement of said FAU Program Pro-
cedures, a Multi -Year Program list is to be developed, and
WHEREAS, the purpose of said list is to prioritize
project applications for the expenditure of FAU funds within
the urbanized area, and
WHEREAS, pursuant to said requirement, a program
list composed of the following three elements was subsequently
developed: The Funded Project List, the FAU Regional Road and
Transit Project Submittals and the Distribution of the Local
Portion;
NOW, THEREFORE, BE IT RESOLVED by the City Council
of the City of National City that the 1976-78 Federal Aid
Urban Multi -Year Program List is hereby approved to facilitate
the availability of FAU funds as recommended by the Federal
Aid URBAN Advisory Committee.
PASSED AND ADOPTED this 8th day of March, 1977.
z7
ATTEST:
1976-78 Federal Aid Urban Program
January 13, 1977
Funded Project List
14a
Agency/Project
CALTRANS
(33-1/3% = $4,.768,767)
R/W Protection
"spool
252*
Sub Total
Agency Total
San Diego
(56% = $8,011,528)
./W Protection
Carpool
SR 252*
Pomerado Rd.
Imperial Ave.
Pacific Hwy. Recap.
Division St.
Friars -Mission G.
Recap
Clair. Mesa T.S.
Cont. Mod.
Clair/Doliva T.S.
Clair. Dr./Clair. Mesa
T.S. Mod.
rape/Hawthorn T.S.
Regional
Road
$5,722,521
$1,509,508
Regional
Recaps/T.S.
$1,430,630
Transit
$3,576,575
$ 116,667
See City of San Diego
$1,509,508
$4,768,767
$ 490,492
2,498,767
391,000
832,754
0 $ 116,667
Local
$3,576,575
0
6.
Total
Accum
$14,306,301
$1,509,508
1,626,175
(include all R/W protection, carpool & SR 252)
$ 252,000
110,000
192,000
55,000
65,000
$ 153,333
$ 469,246
33,000
80,000
$2,116,667
2,270,000
4,768,767
5,159,767
6,461,767
6,713,767
6,746,767
6,856,767
7,048,767!
7,103,767
7,168,767
7,248,767
*Project Partially Funded
1 4b
Agency/Project
Regional
Road
$5,722,521
Regional
Recaps/T.S.
$1,430,630
Transit
$3,576,575
Local
$3,576,575
Total
Accum
$14,306,301
San Diego (Cont.)
CBD T.S. Cont. Mod.
$1,631,000
$8,879,767
Caminoes Way T.O.
$ 23,000
8,902,767
Jackson Drive
433,000
9,335,767
Coronado Ave.
295,000
.9,630,767
Grand/Ingraham
T.S. Mod.*
6,936
9,637,703
Sub Total
$4,213,013
$ 674,000
$ 176,333
$2,948,182
Agency Total
$8,011,528
San Diego. County
Broadway Recap
$ 123,000
$9,760,703
Friars -Mission G.
Recap
weetwater Rd.
139,000
9,899,703
Recap*
67,279
9,966,982
La Mesa P&R
$ 325,000
10,291,982
Del Mar Multimodal Sta.
700,000
10,991,982
Bus Stop Improve.
18,000
11,009,982
Sub Total
0
$ 329,279
$1,043,000
0
Agency Total
$1,372,279
Escondido
Hwy. 395/l3th T.S.
$ 70,500
11,080,482
Grand/Date T.S.*
21,455
11,101,937
Sub Total
0
$ 91,955
0
0
Agency Total
$- 91,955
*Project Partially Funded
Agency/Project
Regional
Road
$5,722,521
Regional
Recaps/T.S.
$1,430,630
Transit
$3,576,575
Local
-$3,576,575
14c
Total
Accum
$14,306,301
1 Cajon
Jamacha/Lexington T.S.
$ 29,631
$11,131,568
Avocado/Lexington T.S.
29,299
11,160,867
Sub Total
0
$ 58,930
0
0
Agency Total
$ 58,930
Chula Vista
" ,legraph/Halecrest
T.S. _
$ 95,000
$ll, 2 55,.867
I" St. Recap
nus Maint. Fac. &
49,036
11,304,903
Trans. Center
$ 442,800
11,747,703
Sub Total
0
$ 144,036
$ 442,800
0
Agency Total
$ 586,836
.ista
E. Vista Wy/L.A. T.S.
$ 50,630
$11,798,333
N. Santa Fe/L.A. T.S.
49,800
11,848,133
Sub Total
0
$ 100,430
0
0
Agency Total
$ 100,430
Del Mar
Cam. Del Mar/Car. Val.
T.S.
$ 32,000
$11,880,133
Sub Total
0
$ 32,000
0
0
Agency Total
$ 32,000
NCTDB
Fastern Facility
$ 241,000
$12,121,133
is Stop Improve.
52,000
12,173,133
Sub Total
0
0
$ 293,000
0
Agency Total
$ 293,000
14d
('gency/Project
Regional
Road
$5,722,521
Regional
Recaps/T.S.
$1,430,630
Transit
$3,576,575
Local
$3,576,575
Total
Accum
$14,306,301
National City
-
Bus Turnout
$ 22,410
$12,195,543
Sub Total
0
0
$ 22,410
-
Agency Total
$ 22,410
Coronado•
Vanpools
$ 10,782
$12,206,325
Sub Total
0
0
$ 10,782
0
Agency Total
$ 10,782
-
GRAND TOTAL
$5,722,521
$1,430,630
$2,009,992
$3,043,182
Remaining Local Funds
$2,099,976
FINAL 1976-78
FAU REGIONAL ROAD & TRANSIT PROJECT SUBMITTALS
by Rating Score
January 13, 1977
Regional Road
Rating Requested FAU
Points Project Sponsor FAU Accumulated
131 SR 252 CALTRANS $ 3,800,000 $ 3,800,000
125 Euclid Ave. (II) Nat. City 94,650 3,894,650
125 Broadway S.D. County 114,000 4,008,650
123 Valley Parkway Escondido 310,000 4,318,650
122 SR 76 Oceanside 870,870 5,189,520
121 SR 76 CALTRANS 2,446,730 7,636,250
121 Euclid Ave. (I) Nat. City 275,190 7,911,440
121 Euclid Ave. (III) Nat. City 291,600 8,203,040
115 La Mesa Blvd. La Mesa 2,414,400. 10,617,440
108 Sweetwater Rd. S.D. County 322,000 10,939,440
106 Ballantyne St. El Cajon 814,000 11,753,440
106 Carlsbad Blvd. Carlsbad 1,035,000 12,788,440
106 Chase Ave. El Cajon 1,863,000 14,651,440
106 College Ave. S.D. County 967,000 15,618,440
102 N. Sante.Fe Vista 998,000 16,616,440
101 Mission Rd. San Marcos 1,668,810 18,285,250
101 Tidelands Chula Vista 960,802 19,246,052
99 Mission Rd. (II) S.D. County 334,000 19,580,052
98 SR-78 Ramps San Marcos 289,000 19,869,052
98 Woodside Ave. S.D. County 158,000 20,027,052
96 Telegraph Canyon Chula Vista 1,688,394 21,715,446
95 Magnolia Ave. S.D. County 128,000 21,843,446
95 Pomerado Rd. S.D. City 391,000 22,234,446
14e
14f
Regional Road Cont'd
n Rating Requested FAU
Points Project Sponsor FAU Accumulated
93 Mission Ave. Escondido $ 340,728 $22,575,174
92 Pomerado Rd. Bridge S.D. County 294,000 22,869,174
91 Elm Ave. Carlsbad 690,000 23,559,174
89 San Marcos Blvd. San Marcos 521,680 24,080,854
88 Jimmy Durante Bridge Del Mar 32,300 24,113,154
87 Fanita Dr. El Cajon 593,000 24,706,154
86 Imperial Ave. S.D. City 1,302,000 26,008,154
85 Twin Oaks Valley Rd. San Marcos 387,140 26,395,294
82 Jamacha Blvd. (II) S.D. County 349,000 26,744,294
81 Willow St. Bridge Chula Vista 594,533 27,338,827
75 Melrose Ave. Vista 1,448,000 28,786,827
73 S. Santa. Fe Vista 165,000 28,951,827
72 E.-Vista Way Vista 537,000 29,488,827
72 Mast Blvd. (II) S.D. County 591,000 30,079,827
71 S. Santa Fe (I) S.D. County 623,000 30,702,827
67 Bancroft Dr. (II) S.D. County 507,000 31,209,827
65 Wintergardens Blvd. S.D. County 244,000 31,453,827
63 Carlsbad Blvd. Bk. Lanes Carlsbad 166,000 31,619,827
61 Sweetwater Rd. (IV) S.D. County 753,000 32,372,827
60 Bonita Rd. Bridge S.D. County 1,421,000 33,793,827
60 Broadway Chula Vista 18,860 33,812,687
60 Melrose Dr. Ext. S.D. County 677,000 34,489,687
60 Troy St. S.D. County 163,000 34,652,687
56 Jackson Dr. S.D, City 433,000 35,085,687
56 Tamarack Ave. Carlsbad 1,293,628 36,379,315
55 East "L" St. Chula Vista 16,006 36,395,321
14g
Regional Road - Cont'd
Rating Requested FAU
Points Project Sponsor FAU Accumulated
53 Bancroft Dr. (I) S.D. County $ 328,000 $36,723,321
50 Palomar Airport Rd. Carlsbad 2,737,020 39,460,341
43 N. Melrose Vista 423,000 39,883,341
35 Orange Ave. S.D. County 501,000 40,384,341
$ 40,384,341
14h
Regional .Recaps
-, Rating Requested FAU
'Points Project S onsor FAU Accumulated
140 Broadway S.D. County $ 123,000 $ 123,000
125 "H" St. Chula Vista 49,036 172,036
123 Friars Rd/Mission S.D. City 110,000 282,036
Gorge Rd.
123 Mission Gorge Rd. S.D. County 139,000 421,036
116 Sweetwater Rd. S.D. County 155,000 576,036
110 Poway Rd. S.D. County 181,000 757,036
108 Espola Rd. S.D. County 156,000 913,036
105 "E" St. Chula Vista 15,371 928,407
100 4th Ave. Chula Vista 102,787 1,031,194
87 Pacific Hwy. S.D. City 252,000 1,283,194
76 Jamacha Blvd. S.D. County 72,000 1,355,194
( 68 S. Bay Freeway S.D. County 225,000 1,580,194
58 Palomar Airport Rd. S.D. County 117,000 1,697,194.
51 Encinitas Blvd. S.D. County 209,000 1,906,194
$ 1,906,194
14i
Regional Traffic Signals
Rating Requested FAU
k Points Project Sponsor FAU Accumulated
47 395/13th Escondido $ 70,500 $ 70,500
45 Jamacha & Lexington El Cajon 29,631 100,131
43 Clar. Mesa/Doliva S.D. City 55,000 155,131
40 Telegraph/Halecrest Chula Vista 95,000 250,131
39 E. Vista Way/L.A. Dr. Vista 50,630 300,761
36 N. Santa Fe/L.A. Dr. Vista 49,800 350,561
35 Avocado/Lexington El Cajon 29,299 379,860
35 Camino Del Mar/Car. Val. Del Mar 32,000 411,860
35 Grand/Date Escondido 33,174 445,034
34 E. Vista Way/Arcadia Vista 34,860 479,894
32 Grand/Fig Escondido 33,174 513,068
32 Mission/Fig Escondido 33,174 546,242
26 Central/Imperial S.D. County 37,000 583,242
25 Bradley/Cuyamaca S.D. County 37,000 620,242
25 College/Federal S.D. County 37,000 657,242
25 Valley/Sweetwater Nat. City 14,000 671,242
24 Broadway/Oxford S.D. County 37,000 708,242
21 E. Orange/Hilltop Chula Vista 38,000 746,242
20 Otay Lakes/Telegraph Chula Vista 33,000 779,242
16 Elm/Roosevelt Carlsbad 41,470 820,712
15 Encinitas/Rancho S.F. S.D. County 37,000 857,712
13 Elm/Pio Pico/I-5 Carlsbad 149,290 1,007,002
13 Mission/Stage Coach S.D. County 27,000 1,034,002
12 "H"/3rd & 4th Coronado 114,000 1,148,002
Hilltop/Main S.D. County 27,000 1,175,002
Pacific Hwy/La Costa S.D. County 29,000. 1,204,002
Regional Traffic Signals - Cont'd 14j
Rating Requested FAU
Points Project S onsor FAU Accumulated
5 Hill/ Harbor S.D. County $ 41,000 $ 1,245,002
5 Telegraph/Brandywine Chula Vista 33,000 1,278,002
3 Espola/Twin Peaks S.D. County 40,000 1,318,002
2 Paradise Valley/Worth- S.D. County 36,000 1,354,002
ington
$ 1,354,002
14k
Transit
Rating Requested FAU
Points Project Sponsor FAU Accumulated
97 Easter Facility NCTDB $ 241,000 $ 241,000
93 Bus Maint. Fac. & Chula Vista 442,800 683,800
Transit Ctr.
91 La Mesa P & R S.D. County 325,000 1,008,800
91 Del Mar Multimodal Sta, S.D. County 700,000 1,708,800
80 Camiones Way. T.O. S.D. City 23,000 1,731,800
79 Carpool Project CALTRANS 270,000 2,001,800
77 Bus Stop Improvements " S.D. County 18,000 2,019,800
77 Bus Stop Improvements NCTDB 52,000 2,071,800
77 Bus Turnout Nat. City 22,410 2,094,210
77 Ramp Metering CALTRANS 400,000' 2,494,210
77 Vanpools Coronado 10,782 2,504,992
$ 2,504,992.
14-1
Projects That Were Not Rated
Rating
Points Project
CBD Sig. Control Sys.
Clair. Mesa Sig. Cont.
Clair. Dr/Clair. Mesa
Sig. Mod.
Fletcher/Baltimore Sig.
Mod.
Jamacha/E. Main Sig. Mod.
Sig. Controller/0pticom
Main/Magnolia Sig. Mod.
Pedestrian Indicators
R/W Protection
T.S. Control Mod.
Pepper/Wintergardens
Sig. Mod.
Encinitas/Vulcan/Pac Hwy
Sig. Mod.
Imperial/Palm Sig. Mod.
Sponsor
S.D. City
Sys S.D. City
S.D. City
La Mesa
El Cajon
El Cajon
El Cajon
Chula Vista
CALTRANS
Chula Vista
S.D. County
S.D. County
S.D. County
GRAND TOTAL
Requested
FAU
$ 1,631,000
192,000
65,000
14,000
42,662
80,000
45,733
53,109
2,000,000
23,575
34,000
66,000
37,000
$ 4,284,079
FAU
Accumulated
$ 1,631,000
1,823,000
1,888,000
1,902,000
1,944,662
2,024,662
2,070,395
2,123,504
4,123,504
4,147,079
4,181,079
4,247,079
4,284,079
$50,433,608 $50,433,608
14m
1976-78 Federal Aid Urban Program
January 13, 1977
Distribution of Local Portion
Jurisdiction Population* % Pop. Allocation
Carlsbad 20,000 3.0 $ 62,999
Chula Vista 75,900' 11.4 239,397
Coronado 20,100 3.0. 63,000
Del Mar 4,900 0.7 14,700.
El Cajon 61,300 9.2 193,198
Escondido 51,300 7.7 161,698
Imperial Beach 20,500 3.1 65,099
La Mesa 43,100 6.5 136,498
National City 44,900 6.7 140,698
Oceanside 59,000 . 8.9 186,898
San Marcos 10,400 1.6 33,600
Vista 29,100 4.4 92,399
S. D. County 225,200 33.8 709,792
665,700 100 $2,099,976
14n
FAU Funding Distribution
by Jurisdiction
Regional & Local
Jurisdiction Transit Projects Projects Total FAU
Carlsbad 0 $ 62,999 $ 62,999 0.4
Chula Vista $586,836 239,397 826,233 5.8
Coronado 10,782 63,000 73,782 0.5
Del Mar 32,000 14,700 46,700 0.3
El Cajon 58,930 193,198 252,128 1.8
Escondido 91,955 161,698 253,653 1.8
Imperial Beach 0 65,099 65,099 0.5
La Mesa 0 136,498 136,498 1.0
National City 22,410 140,698 163,108 1.1
Oceanside 0 186,898 186,898 1.3
San Diego City 8,011,528 0 8,011,528 56.0
San'Marcos 0 33,600 33,600 0.2
Vista 100,430 92,399 192,829 1.3
County of S.D. 1,372,279 709,792 2,082,071 14.6
CALTRANS* 1,626,175 0 1,626,175 11.4
NCTDB 293,000 0 293,000 2.0
SDMTDB 0 0 0 0
TOTAL $12,206,325 $2,099,976 $14,306,301 100
* Total Combination of CALTRANS project = $4,768,767 or 33-1/3%