Loading...
HomeMy WebLinkAboutCC RESO 11,984RESOLUTION NO. 11,984 RESOLUTION GRANTING A LIMITED COMMERCIAL PLANNED DEVELOPMENT PERMIT PURSUANT TO ORDINANCE NO. 1077 (No. 74- Johnson -Chance Financial Group, to construct a 12,900 square foot retail shopping center at the south- east corner of Harbison Avenue & Plaza Boulevard) The City Council of the City of National City, California, does hereby find, determine, order and resolve as follows: 1. At a regular meeting of the City Planning Commission on November 10, 1975, said Commission unanimously adopted a recommendation that the owner of the real property more fully described below, be granted a Limited Commercial Planned Development Permit upon the conditions hereinafter stated: That portion of Quarter Section 106, Rancho de la Nacion, in the City of National City, County of San Diego, State of California, according to Map thereof No. 166 by Morrill, on file in the Office of the County Recorder of said San Diego County, described as follows: Commencing at the Northeast corner of said Quarter Section 106; thence South 18°29'12" East along the Easterly line of Quarter Section 106, a distance of 1020.91 feet; thence South 43°45'38" West a distance of 139.27 feet to a point of tangency with a 360.00 foot radius curve, concave to the Northwest; thence South- westerly along said curve through a central angle of 24°09'45" a distance of 151.82 feet; thence tangent to said curve South 67°55'23" West a distance of 10.36 feet to a point of tangency with a 12.00 foot radius curve, concave to the Northeast; thence Westerly and Northerly along said curve through a central angle of 93°36'02" a distance of 19.60 feet to a point in the Easterly line of a public street known as Harbison Avenue; (said Harbison Avenue being 80.00 feet in width); thence South 18°28'35" East along said Easterly line a distance of 104.21 feet to the TRUE POINT OF BEGINNING; thence Northerly and Easterly along a tangent curve, having a radius of 12.00 feet and a central angle of 86°23'58" and being concave to the Southeast a distance of 18.10 feet; thence tangent to said curve, North 67°55'23" East a distance of 16.90 feet to a point of tangency with a 440.00 foot radius curve, concave to the Northwest; thence Easterly and Northerly along said curve through a central angle of 24°09'45" a distance of 185.55 feet; thence tangent to said curve North 43°45'38" East a distance of 97.17 feet to a point in the Easterly line of said Quarter Section 106; thence along said Easterly line South 18°29'12" East, 212.05 feet to the Southeasterly corner of the Northeasterly Quarter of Section 106; thence along the Southerly line thereof South 71°13'02" West, 291.46 feet to the Easterly line of said Harbison Avenue; thence along the Easterly line thereof North 18°28'35" West, 105.52 feet to the TRUE POINT OF BEGINNING. 2. That the City Council has received the recom- mendation of the Planning Commission, and after full and complete consideration of said recommendation hereby grants a Limited Commercial Planned Development Permit upon the following terms and conditions: a. Prior to City Council adoption of resolution granting Limited Commercial Planned Development Permit No. 74, the property owner shall file with the Planning Department an acknowledgment in writing stating that he is cognizant of all conditions as hereinbelow set forth and agrees to satisfy same. b. Street improvements are required. A street excavation permit and curb, gutter, sidewalk and driveway permit is required for the following works in the public right-of-way: (1) On Harbison Avenue (a) Installation of curb, gutter and sidewalk. (b) 3" asphalt concrete on 9" of crusher run base along easterly shoulder. (Approximately 20.5 feet in width.) (c) 1-1/2" asphalt concrete overlay of existing concrete strip section (approximately 10' in width with some existing asphalt concrete overlay). (d) 10' transition around edges of asphalt concrete overlay to allow for smooth vehicular movement. This work is required from the centerline of Plaza Boulevard to the westerly prolongation of the property's southerly line. (2) On Return Area (a) Installation of sidewalk. (3) On Plaza Boulevard (a) 3" asphalt concrete on 9" crusher run base from existing cross gutter at Harbison Avenue for full length of Plaza Boulevard frontage (30.5' in width). (b) Installation of sidewalks and driveways. The site plan shows a 10' high (plus or minus) retaining wall. A grading plan and permit is required by the Engineering Department. c. Installation of one public fire hydrant is required on the south side of Plaza Boulevard adjacent to driveway access into complex. Developer to pay all costs for installation. (Exact location to be approved by City Fire Marshal.) d. Prior to final inspection and/or issuance of Certificate of Occupancy for any portion of the project, a 2' wide by 85' long A. C. berm shall be installed, separat- ing the traffic on Harbison Avenue, south of Plaza Boulevard, and red curb and "NO PARKING" signs as required along the entire frontage of this property shall be installed. e. Minimum driveway widths shall be 30'. f. A 6' high chain link fence with appropriate screen type landscaping shall be constructed along the east- erly 251 feet of said southerly property line. A 6' high masonry wall shall be constructed along the remaining westerly 40 feet of said property line. g. Parking lot and walkway lighting shall be provided from shielded light standards or other city approved methods. Roof -mounted lighting shall not be used. h. All landscaping shall be separated from areas of vehicular circulation and parking by a 6" high concrete curb. i. Parking design shall be of the diagonal type, and all parking sites, where vehicles are headed into either a landscaped area or walkway, shall be provided with wheel stops. j. A masonry trash enclosure at least 2' higher than containers, with gates, is required. k. Plans submitted for the issuance of a building permit shall include a detailed site plan. Said plan shall provide the following additional information: (1) Type and thickness of surfacing of parking lot and walkways. (2) Existing and finish grades. (3) Drainage. (4) Exterior security lighting. (5) Parking for the handicapped. (6) Compliance with all conditions of issuance of planned development permit. 1. A building permit shall be obtained within a period not to exceed 120 days from date of City Council adoption of resolution granting limited commercial planned development permit. m. Outdoor storage of merchandise and/or rubbish at the southwest corner of the project shall be pro- hibited. ATTEST: PASSED AND ADOPTED this 24th day of February, 1976.