Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
CC RESO 10,275
RESOLUTION NO 10,275 RESOLUTION AUTHORIZTNG EXECUTION OF AN AGREEMENT WITH SAN DIEGO GAS & ELECTRIC COMPANY TO RELOCATE UTILITIES BE IT RESOLVED by the City Council of. the. City of National City that the City Manager is hereby authorized and directed to execute an agreement with the San Diego Gas &Electric Company for the relocation of utilities. PASSED AND ADOPTED this 9th day of February, 1971. ATTEST: THIS AG i c7% DRY' C BY AND BETWEEN ACID ACM R: GA`t'ia TT DE AND ENTERED tED IN?. 'IRIS 1-'1- c-A- ) 1971 CITY st7 NATI a body politic rporati.om of California, hereinafter referred to as "CITY" ITNESSETH alifornia on August 21, 1947 and September 23, SD-5 between "E" Street in Chula Vista and 240 cn of Interstate Route 11-8D-5✓54i and ali ornia contemplates construction by contract Freeway in the near future; and the interchange for Routes 5✓54 will provide access from ide- �id interchange by means of roads to be known as the Westbound -54) connectors; and ruction, of said connector roads, the cast of which is to use ramps to be constructed per a 138,000 volt otesl tower transmission line, at an elevation of approximately 54 feet; and 1948 adopted the route of Road 11 street is National city as a port WHEREAS the State of said section of Inters# WHEN e to Nor^ be borne by CITY, a dual steel tower line by about 75 feet easterly of the a second line of towers tiny line of towers; and 11 d so mans, ns, it is required by the California Public Utility Coaaiaaioa General Order 95 and to the :mutual advantage of CITY and COMPANY to Cause certain steel towers to be designed and constructed and/or reconstructed to a sufficient height to provide a sinisun clearance of 30 feet for the 138,0O0 volt conductors ever said connector roads. NOW, THEREFORE, in consideration of the cotenants and conditions herein contained, the parties hereto agree as follows: SECTION I COMPANY TO design and constrnot two towers to be designated as towers 19-E and 19.4. Said towers are to be located approximately 420 feet northerly of the centerline of Sweetwater flood Control Channel. design and construct two towers tc be designated as era 17A-w and 18-W. Said towers are to be located c:sly 440 feet and 600 feet northerly of and in existing tower No. 189306. and construct two towers to be designated as 7A-E and 18-E. Said towers are to be located ��ely 75 Teat easterly and adjacent to the afore- aed towers 17A-W and l8. . exiat5ng steel tower No. l89508 and credit CITY us of salvage, if any. tins steel tower No. i 895o cr wit COY of salvage, if any. ITT AGREES: he construction and 2. To pay the actual Costs incurred for >; required in the placement of tower No. To pay the actual costs incurred in the tower No. 189508. of existing sit with COMPANY by April 1, 1971, the sum sat' •t 'Sewhi Asus represents the estimated cost of Items as er 26.65% of the total coat of be the �described in Section T. which total is estimated to d a3. In the event the actual, cost is less than COMPANY will refund the difference between the and the amount on deposit by CITY. In the tual cost exceeds said deposit, CITY' will pay the e between said deposit and the actual post of CITY'S IT IS N YhNTCi3n .AND AA 1. That all change orders affecting CIT shall be approved by CITY'S Maser 2. That neither CITY nor any officer orbe eegaoy, responsible for any damage or liability oof ec any negligent act or omission by COMPANY un tion with any work, authority or jurisdiction delegated to R COMPANY under this Agreement. It is also understood and agreed that COMPANY shall fully indemnify and hold CITY ha mlese from any liability imposed for injury occurring by ream* of any negligent act or omission bywith an/ COMPANY under or in connection under tthisgA trity or jurisdiction delegated to COMPANY 3. That neither COMPANY nor say ©; responsible for any damage or any negligent act or omission by with any work, authority or jarisa COMPANY under this Agreement. on herein Written. IN WITNESS WHEREOF the 1?artiee hereto have caused this Agreement ted by their respective officers, duly authorised, the provisions regiment are effective as of the day, month and year first hereinabore C