HomeMy WebLinkAboutCC RESO 9829RESOLUTION NO. '9829
RESOLUTION AUTHORIZING EXECUTION OF AGREEMENT
FOR IMPROVEMENT OF PARADISE VALLEY ROAD
BE .IT RESOLVED. by the City Council of the City of
National City that .the Mayor and City Clerk are authorized to
execute and attest that certain Agreement for 'Improvement of
Paradise Valley Road between the City of National City, .the
City of San Diego, and the County of San Diego.
ATTEST:.
PASSED AND ADOPTED this 20th day of May, 1969.
4-2LE
CITY.CLE
AGREEMENT FOR THE IMPROVEMENT
OF
PARADISE VALLEY ROAD
1969, by and
between the CITY OF NATIONAL CITY, a municipal corporation, hereinafter called
National City; the CITY OF SAN DIEGO, a municipal corporation, hereinafter called
San Diego; and the COUNTY OF SAN DIEGO, a political subdivision of the State of
California, hereinafter called the County.
W ITNESSETH:
WHEREAS, National City, San Diego, and the County desire to enter into a joint
cooperative agreement to improve Paradise Valley Road to a four -lane paved roadway
from the intersection of Eighth.Street and Plaza Boulevard in the City of National,
through the County, to the presently improved widened, section near Briarwood Road
in the City of San Diego, a distance of approximately 2.1 miles, and
WHEREAS, National City, San Diego, and the County desire to proceed with the
construction of said improvements and to share in the cost of such construction.
- NOW THEREFORE, IT IS MUTUALLY AGREED by and between National City, San Diego, -
and the County as follows:
1. National City, San Diego, and the County shall cause to be improved by
widening to a four —lane, paved roadway that portion of Paradise Valley Road from
the intersection of Eighth Street and Plaza in the City of National City to
approximately Briarwood Road in the City of San Diego, a distance of approximately
2.1 miles.
2. That in general the distribution of the work and the responsibility
therefor is as follows:
a. That San Diego will design and prepare plans and specifications for
the road improvement project which will include a traffic signal at the
intersection of Paradise Valley. Road with Eighth Street and Plaza Boulevard.
b. That San Diego will provide all Inspection and contract management
c. That San Diego will perform all materials engineering necessary to_
determine a suitable structural section and furnish control testing during
the construction of the project.
All costs incurred by San Diego for preliminary engineering, design,
and construction engineering expense, inspection and contract management
services shall be shared by National City, San Diego, and the County based
on the percentage of construction costs of the roadway within its jurisdiction
as shown on Exhibit A. The engineering and construction cost of the traffic
signal shall be paid by National City and the County only with National City
paying two-thirds (2/3) of the cost and the County one-third (1/3) of the
cost. Such percentages of the roadway or traffic signal shall not be altered
by annexation subsequent to the execution of this agreement.
In the event right of way must be purchased or condemned it will be the
responsibility of the agency in whose jurisdiction the property is located to
acquire the necessary right'of way within its jurisdiction; provided, however,
that National City and/or San Diego respectively shall reimburse the County for
necessary right of way purchased or condemned by the County which is part of a
parcel of real property presently within the County's jurisdiction if the parcel
has been annexed to National City and/or San Diego prior to acquisition as evidenced
by the recordation of a final order of condemnation, grant deed, or deed of
easement for such right of way.
•
4. After bids for any improvement have been received and opened by San
Diego and prior to the award of any contract for said improvement by San Diego,
San Diego shall notify National City and the County of the lowest responsible
bid thereof. If either National City or the County wishes to reject for cause
the award of the contract in accordance with the lowest responsible bid, San Diego
shall reject all bids and advertise for new bids based either on existing contract
documents or based on revised plans and specifications. If the contract cannot
be awarded, National City and the County will reimburse San Diegofor their
share of engineering.. San Diego will furnish National City and the County each
a reproducible set of plans and specifications for its respective use.
5. After approval
bidder but prior to the
separately deposit with
by National. City and the County of the responsible low
award:of contract, National City and the County shall
San Diego One Hundred and Twenty Percent (120%) of the
estimated total cost of construction of said improvement computed on the basis
of unit prices bid within their jurisdictions
according to Exhibit A and their
proportionate share of the traffic signal. Such proportionate share shall not be
altered, by annexation subsequent to the execution of this agreement. Money so
deposited will be applied to each jurisdiction's share of the project cost.
excess money deposited with San Diego shall be returned after the project is can-
pleted and financial accounts are closed. If National City's and/or the County's
share is more than the amount originally deposited, National City and/or the County
shall pay San Diego the difference. Final payment is due and pay able upon receipt
of a bill from San Diego to National City and/or the County.
6. The plans and specifications for this improvement shall be approved by
the City Engineers on behalf of the respective cities and by the County Engineer
on behalf of the County.
IN WITNESS WHEREOF this AGREEMENT is executed by the County of San Diego by
action taken by its Board of Supervisors, by the City of National City by action
taken by its City Council, and by the City of San Diego by action taken by the
City Council
RECOMMENDED:
D. K. SPEER, County Engineer
E. P. .BRIELSON
H.. FOSTElt
APPROVED AS TO FORM:
COUNTY COUNSEL
By
C ATTORNE ,, NAT O�N
By
CITY, ATTORNEY, SAN DIEGO
By
•City Mafia
COUNTY OF SAN DIEGO
Chairman, Board of Supervisors
196695 APR 24 1969
80NNfl/
PARAVSE
00
g, f>b
i
Asa N
V,
ckroco
-MEP. 111
RESOLUTION No.
196695
z of 4-I2-69
CC.t270(REv.f-68)
ADOPTED ON
BE IT RESOLVED, by the Council of The City of San Diego as follows:
That the City Manager be, and he is hereby authorized
and empowered to execute, for and on behalf of said City,
an agreement with the County of San Diego and the City
of National City for the improvement of Paradise Valley
Road from 8th Street and Plaza Boulevard in National City
to Briarwood Road in San Diego, under the terms and
conditions set forth in the form of agreement on file
in theoffice of the City Clerk as Document No. 727878
APPROVED: JOHN W. tIITT, City Attorney
By
C. M. Fitzpatrick, Chief Deputy
APR 24 1969
.Passed and adopted by the Council of The City of San Diego
on April 24. 1969 , .by the following vote:
'YEAS: Loftin, Landt, Williams, Morrow, Martinet, Hitch,
Schaefer, Curran.
NAYS:
None.
ABSENT: Cobb.
(SEAL)
AUTHENTICATED BY:
FRANK- CURRAN,
Mayor of The .City of San Diego, California.
JOHN LOCKWOOD,
City Clerk of The City of San Diego, California°
By ELFA F. HAMEL , Deputy.
I HEREBY CERTIFY that the above and foregoing is a full,
tz"ue and correct copy of RESOLUTION NO. 196695
passed and adopted by the Council of The City of San Diego,
California, on April 24, 1969
(SEAL)
Rev. 6/67
JOHN LOCKWOOD,
.City Clerk of The City of San Diego, California.
By
Deputy.