HomeMy WebLinkAboutCC RESO 9383RESOLUTION NO. 9383
RESOLUTION GRANTING CONDITIONAL USE PERMIT TO
SOUTHLAND INDUSTRIAL PARK, A JOINT VENTURE,
FOR SOUTHLAND INDUSTRIAL PARK SUBDIVISION,
UNIT NO. 1
WHEREAS, the design of Southland Industrial Park
Subdivision, Unit No. 1, has been reviewed by the City
Council and the Planning Commission of the City of National
City, and
WHEREAS, the design of the said Subdivision has
been reviewed with flooding problems in mind, and
WHEREAS, the design of each building within the
subject Subdivision must be prepared by registered Civil
Engineers with appropriate flood proof designs, and
WHEREAS, a review of each building application for
Southland Industrial Park Subdivision, Unit No. 1, would
require a repetitious review of identical subject matter
which would cause an unnecessary consumption of the public's
time;
NOW, THEREFORE, BE IT RESOLVED that a CONDITIONAL
USE PERMIT be granted to Southland Industrial Park, a joint
venture, for Lots 2,3,4,5,6,7,0,9,10,11,12,13,16,17,18 and 19 of
Southland Industrial Park Subdivision, Unit No. 1, subject
to the following conditions:
1. No residential structures will be permitted,
the zoning requiring commercial, manufacturing or industrial
use.
2. All construction will require the filing of an
application for a building permit to be approved on an
individual basis by the Chief Building Inspector, City
Engineer and Planning Director.
3. A reasonable time will be provided after the
receipt of an application for a building permit, during which
time the Public Works Division of the California State Depart-
ment of Highways may act pursuant to state law.
4. Lots 14 and 15 of Southland Industrial Park
Subdivision, Unit No. 1, are specifically excluded from
this CONDITIONAL USE PERMIT due to their lying within the F-1
designated flood zone.
e�.
PASSED AND ADOPTED this iday of June, 1967.
ATTEST:
J CITY CLERK 1