HomeMy WebLinkAboutCC RESO 8397RESOLUTION NO.
8397
RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF NATIONAL CITY
ADOPTING AND SUBMITTING A BUDGET FOR EXPENDITURE
OF FUNDS ALLOCATED FROM THE STATE HIGHWAY FUND TO CITIES
WHEREAS, a Master Agreement for the Budgeting and
Expenditure of funds Allocated from the State Highway Fund
to Cities has been entered into by the City of National City,
hereinafter referred to as the city, and the State Depart-
ment of Public Works, Division of Highways, hereinafter re-
ferred to as the department; and,
WHEREAS, the city council has prepared a project
statement showing estimated expenditures of such funds recom-
mended to be made during the 1963-64 fiscal year; and,
WHEREAS, the city council has heard read said
project statement and is familiar with the contents thereof;
THEREFORE, be it resolved by the city council of
the City of National City, that said project statement dated
May 6, 1963, be and is hereby adopted as the budget of pro-
posed expenditures of the gas tax allocation to cities, said
project statement be and the same is hereby approved and the
City Manager is directed to sign the same on behalf of said
City, and said project statement to be submitted to the
Department of Public Works, State of California, in accord-
ance with the provisions of Section 197 of the Streets and
Highways Code.
APPROVED AND ADOPTED this 2Qi.day of May, 1963.
ATTEST:
CITY CLERK
Project Statement No
forthe fiscal ear ending
June 30, 19 _�_#
Date
STATE HIGHWAY ENGINEER
Sacramento, California
(TO BE TRANSMITTED THROUGH DISTRICT ENGINEER)
District Engineer
Address Alli_ilkaailiAtf
,19
The City of 111sUrsoml CUT hereby
submits this budget proposal for expenditure of funds allocated from the State Highway fund to cities during the
19 ! - fA fiscal year. All work accomplished by this budget shall be done underthe ttermstof_ g master agree-
ment covering the budgeting and expenditure of these funds as executed on ,77wwliissi
(date)
SUMMARY OF FUNDS BUDGETED FOR EXPENDITURE
Source of Funds
Maintenance
Other
Right of Way ,
Construction *
State allocated (5/84) funds
l�s a
$nt*e*t'
State Highway Budget Funds
City Funds
Other Funds
Total
(See following pages for details)
* Includes preliminary and construction engineering.
SUMMARY OF STATE ALLOCATED (5/8¢) FUNDS AVAILABLE **
>r Psisj.st iS (City)
Total funds available
Plans, specifications and estimates of cost for each con-
struction or improvement project will be submitted in
accordance with Section 199 of the Streets and Highways
Code prior to advertising or commencing work by day labor.
* * Attach additional page if
more space is needed for
this summary.
t>«s401.it
FORM MC-18(12-60)-
(Permissive maintenance definod +n Section 27 (a), (b) and (c)
of Streets and Highways Code, os amended 1959)
By City
General maintenance
By State (per maintenance agreement)
(Signals) (Lighting) (Signs) (Striping) (Other)
(Strike out inappropriate items)
Total Maintenance
Description of work and locations:
OTHER
Attendance at 1. T. T. E.
(preferably budgeted with
Section 2107.5 funds)
REMARKS
Amount
Amount
•2-
PROPOSED IMPROVEMENT MAJOR CITY STREETS
(Use separate sheet for each project)
DESCRIPTION
Name of Street
Beginning and end
of proposed work 2001 *MI$ sit $tit
SEAM Ifitt rmy Daft at 2
III I .001 Citti
icUyJ
2 BO soos Soot l
Length In Mlles Osa____.
The proposed work consists of
simistrustiss elealits owl N)► oasts*
(Grading, paving, constructing curbs and Otters, etc.)
S1f r� including engineering. City • shimAnd total estimated cost Is $ , n9 g 0�
TRAFFIC
Estimated hourly traffic volume approaching intersections will not exceed capacity of proposed street for current
traffic and for traffic ten years hence. (Ref.: Division of Highways Circular Letter No. 58-42) (YES) O
If NO, explanation given on Page 4.
RIGHT OF WAY
wrw
Estimated cost S To be acquired by (City) (state).
Present width
feet. Proposed width feet.
Total width provided by set -backs ft (present). ft (proposed)
CONSTRUCTION
Estimated cost $ #, *0004S (including engineering). s B
Supervision of construction and construction engineering. ( (State).
Supervision of preliminary engineering. ((State)
GEOMETRIC SECTION
(Ref.: Topic 4.01 City and Cooperative Projects Manual of Instructions)
Number and width of traffic lanes
Width of curb parking
lanes
Median Width
Width of curb off -sets
Width of turning
lanes
Total width between exterior curbs
EXISTING
PROPOSED
POSSIBLE FUTURE
DEVELOPMENT
e
Lt.
Rt.
Lt.
Rt.
Lt.
Rt.
e
w
>~Cf'
*'
�s
Lt
Rt.
U.
Rt.
s
7*s
Reasons for less than desirable widths explained on page 4.
• STRUCTURAL SECTION'
Pavement thickness and type
Bose thickness and type
"Types: BS — bituminous seal,
AC— asphaltic concrete,
Other
EXISTING
PROPOSED
Tentative)
AD — aggregate base,
AS — aggregate sub -base
RMAS— read -mix asphaltic surface
PCC — Portland Bement eenerete
CTB — cement treaMd base
-3-
SOURCE OF FUNDS
Stale Allocated
(9✓8‘) Funds
RIGHT OF. WAY
CONSTRUCTION*
TOTAL
City Funds
County Fund!
State Highway Budget Funds
Other Funds
Previously Budgeted
1
. Additional Funds to be Budgeted
TOTAL
* s
.ice..
nLluaes preliminary and conetruc Ion engineering.
13w
PROPOSED TYPICAL. CROSS SECTION
(For use where applicable)
(Show structural section and geometric details)
•
i
Additional Remarks: (explain special financing, basis of fund proportioning, reasons for Tess then desireblr widths
mane and thie nessos, apeclal one$ruetion features, etc.)
salt f s eig 111111 f a'ame wit t $ c. strss't
sr i as Sad teetteset elserseei iir l do va,deudiet to fees Imo the pit dl3+itflt
Olt Mb Street. ***testy el the rettesei s et ese $0141 flsbl *lab 1a 1. 11,0
CONOIDOOrtailla fit a at OW* treevey) Eo es *'e XIof*d*IC. Lad i
d10041 ON* VII $ it saw n aol ` **et* end vitt be
t r end SUMO arts s ;fit*.0 b.s*a.
PROPOSED IMPROVEMENT MAJOR CITY STREETS DITOINIR De. is
di«feads
(lisp separnle sheet for each projoct)
DESCRIPTION
Nome of Street
Beginning and end
of proposed work i
Length In Miles
The proposed work consists of
(warding, paving, constructing curbs end gutters, etc.)
And total estimated cost Is $ MOP.00 , including engineering.
TRAFFIC
Estimated hourly traffic volume approaching Intersections will not exceed capacity of proposed sheet for ewrenl
traffic and for traffic ten years hence. (Ref.: Division of Highways Circular Letter No. 58.42) (YES) (NO)
11110, explanation given on Page 4.
RIGHT OF WAY
Estimated cost $ To be acquired by (City) (State).
Present width feet. Proposed width feet.
Total width provided by set -backs ft (present). ft (proposed)
CONSTRUCTION
Estimated cost $ (including engineering).
Supervision of construction and construction engineering. (City) (State).
Supervision of preliminary engineering. (City) (State)
GEOMETRIC SECTION
(Ref.: Topic 4.01 City and Cooperative ProjectsManual of Instructions) Ili rempriees R
Number and width of traffic lanes
Width of curb parking
lanes
Median Width
Width of curb off -sets
Width of turning
lanes
Total width between exterior curbs
EXISTING
PROPOSED
POSSIBLE PUTURR
DEVELOPMENT
Lt.
Rt.
Lt.
Rt.
Lt.
Rt.
Lt
Rt.
Lt.
Rt.
Reasons for less than desirable widths explained on page 4.
• STRUCTURAL SECTION'
Pavement thickness and type
Bose thickness and type
*Types: BS — bituminous seal,
AC— asphaltic concrete,
Other
EXISTING
PROPOSED
(Tentative)'
AB — aggregate base,
AS — aggregate sub -base
RMAS- rsed•mix asphaltic surface
PCC — Portland cement concrete
CTB — cement treated base
—3—
SOURCE OF FUNDS
State Allocated
010 Funds
RIGHT OF WAY
CONSTRUCTION*
TOTAL
SO 41
City Funds
County Fund!
State Highway Budget Funds
Other Funds
Previously Budgeted
. Additional Funds to be Budgeted
*ABMs
TOTALi%s•7ffief{l*
dry and construe on engineering.
PROPOSED TYPICAL CROSS SECTION
(For use where applicable)
(Show structural section and geometrla details)
Addlfional Remarks: (explain special financing, basis of fund proportioning, reasons for less then desirable widths
and thicknesses, special construction features, etc.)
III$. a
BIONINIS toill
IRMO BO Mk
i1 rant". f 14*
. I 1