HomeMy WebLinkAboutCC RESO 7890RESOLUTION NO. 7890
RESOLUTION APPROVING CONTRACT
Be it resolved by the City Council of the City of National
City as fDllows:
That certain Service Contract between CITY OF NATIONAL
CITY and DEPARTMENT OF PUBLIC WORKS, DIVISION OF HIGHWAYS,dated
the 25th day of January, 1961, a copy of which is hereto attached
and made a part hereof by reference, is hereby approved and
accepted, and the Mayor is authorized and directed to execute the
same for and on behalf of City of National City.
PASSED AND ADOPTED this day of March, 1961.
ATTEST : J"
CITY CLERK
WHITE — HEAuaUARTERS
YELLOW „-CONTRACTOR
PINK — DISTRICT OFFICE
GOLDENROD --- FIELDMAN
GREEN — CONTROLLER
BLUE — PROJECT
STATE OF CALIFORNIA
DEPARTMENT OF PUBLIC WORKS
DIVISION OF HIGHWAYS
..vrv, nvL
CONTROL
ACCOUNT
FUNCTION
OBJECT
DISTRICT
COUNTY
ROUTE
SECTION
WORK ORDER
NUMBER
00.
}
'yy pp
LR'$. B. Ra 4N
CALIFORNIA
19
CONTRACT
NOTE: THIS
NUMBER
TO BE
PLACED
ON ALL
BILLS
No.
SHEETOF
2
254
RHEETS
tii" G3 a tional € :ty 1243 satiohal hati*Lial itn. lifor is
hereinafter called the contractor, hereby agrees to furnish the service or rental as hereinafter set forth to the Department of Public Works,
Division of Highways, in accordance with the provisions on both sides of this form and on the attached sheets, if any, and agrees to receive
and accept as full compensation therefor the prices named herein:
furnish dl labor, r.. toriaL , tools : Ir . t
y(q �+: yy� yyryry �p yy� y p� 0. *.� i.q��} y� 4. tea. 5"j
locate in r w os doss it si aA Ile 5 ,. 4),..
surveypoints consiating of loads
i Ldnufse'` a 1'x 0 iron pipes or 4 iq'� z"' official .%'c r i
��asp?;
on. tic sheets. ,:��a of ,$� f,1 �.,
to T, "ffi .i& Ilate the bon n.iarihsI:aL {?7 s .° for
se
All a
and.'3t'wrJ
of said Sth
which blocksall o
ht of way.ablished
ths south i-y ,. i and as
on of U. . 101).
a
bra mho:
lamed
81fl of but 2f
% .t V within
,leadi.:itder k .
The said Department of Public Works, Division of Highways, hereby agrees to the terms as above set forth, and hereby agrees to pay
the same, provided, that by mutual consent this agreement may be modified or terminated at any time.
IN WITNESS WHEREOF, the parties to these presents have hereunto set their hand and seal the year and date first above written.
By
DEPARTMENT OF PUBLIC WORKS
DIVISIONA{OF HIGHWAYS
s a � IA ;a .,�s.3ia ri ct Lngi e fir
; ,su1start
Approved.
District Engineer
Form A-284 Rev. I-67
•o£L
uactor
U l'' _,
By x`L4 MA.
fs!.Y.LV�-tg
Tide o>( osidon
mannnmornmorror* MAIL BILLS IN TRIPLICATE TO:
A. —The Contractor shall keep himself filly mfornied of and at all tine's observe and comply
and shall cause ail his agents and ernployee.s to ChSE17e and comply withall state and national laws
and county and municipal ordinances and. qti atio n: and orders of public bodies which in, any manner
affect those engaged or employed in the work, or -t e material._ used in the work, or which in any way
affect the conduct of the work. He shalt protect and indemnify the State a' •Cm'iforn ia, the Director,. the
State; Highway Engineer, and all of its and .heir officers and agents against any claim or liability arising
from or based on the violation of any such law, ordinance, regulation, or order, whether by himself or his
employees. If any discrepancy or any inconsistency is discovered in this contract in relation to arty such
iaw,.ordinance, regulation, or order, the shall report the same to the Engineer:in writing.
E. The attention of the Contra for is particularly directed to, and he agrees to comply with, all.cf the
provisions of the Labor Code including those provisions limiting the hours of labor on public works tc
eight hours during any one calendar day, except as otherwise permitted by Chapter 759, Statutes of 1941,
which provides that under the conditions therein stated, work in excess of eight hours per day may be
permitted; requiring the payment of not less than the prevailing rate of wages; and prohibiting the em-
ployinent of aliens on public works. The Contractor represents that he has read and is familiar with all
of the provisions of said Code.
The Contractor further agrees tJ the forfeitures provided for in said Labor Code inthe event n
lotion Ofany of the provisions here r ahc v e mentioned occurs in the execution of this contract.
C.-!The attention of the Contractor is also called to and he agrees to comply with the provisions of
;he "Buy American Act. sections 4300 t0 4305 of the Government Code, pertaining to use of materials
unto supplies produced or manufactured ir.i + e Unite-3 Stu'es..
D.—The mentioning of certain statutes in this contract shall not relieve the Contractor from the respbrisi_
biiity of complying with any other law applicable to the Wci:it to be c.1.o'nernaer the contract or to the
service or equipment to be furnished '3eretned.er,
E.—It is understood
its use under this contract,
for property damage ;r par:..
F.—The cost of employer
unemployment contributions, social sec:uri
meats required b_ law c- .. ._ . C shall
made therefor. except
Co. ':tractor S t.
e C Lam_
.. it is 9i,'iJres.Sliy' agreed i.t?a. ..
that _on are e,i'_dolees of the D'e".c.rtmrr ..i
all respoosibiiity far repairs to,h_i equip
which. d he imposed -aCCOr
_. this contract.
at er airy' nest compensation insurance
a'si��n premiums,
act bond Jand.any other taxes or recess--
premiums,
:ii the price •hid and no additional allowance will be
herein,
on this work are employees of the Contract°
Works of the State ofCalifornia.
ana
` . Attu ati .r s E_titerls ohs .of time, extra and additional work, and other authorized changes may
be made without ?£ ,of ti:':e _et' on the contra bonds.
1 the consentsureties, contract tJO leer
--The Contractor warrants, by execution of this contract, that no person or selling agency has
'been employed or re*aned- to solicit or -secure this contract upon an agreement or understanding for a com-
ni'scicn, percentage, brokerage, or contingent fee a
..�: excepting bona fide employees or bona flue established
commercial or selling agencies maintained by the Contractor for the purpose of securing business. For
breach or violation of this warranty the State shall have the right to annul this contract without liability,
paying only for the value of the work actually performed, or in its discretion to deduct from the contract
price or consideration, or otherwise recover; the full amount of such commission, percentage, brokerage or
contingent fee.
1, Pursuant to the authority contained in Section 591 of the Vehicle Code, the Department has deter-
mined that within such areas as are within the limits of the project and are open to public traffic the Con-
tractor shall comply with all of the requirements set forth in Divisions 1.1, 12, 13, 14 and 15 of the Vehicle
Code. The Contractor shall take all necessary precautions for safe operation of his equipment and the pro-
tection of the traveling public from injury and damage from such equipment.
City of National. City.
Sheet 2 of 2
Service Contract
1-1-11,254
Cityof i4tional City to be r-eimbursed for the above -described
surveys or the basis of actual cost including equipment rental.
• 77ST1IATED TOTAL AUTHORIZATIOU Under This Contract 3.000.00
LX:VilACT TO ,upiai-; 3eptembe /061
• ion -competitive business
The above amount is an estimate only and it is distinctly under
stood and agreed that the Division of dighways will pay only for
the actual cost of the work perforaed as outlined above.
3illing should be in triplicate and must show labor and equipment
rental separately and must be itemized for materials..
Whereas, the development of an adequate street and
highway s-jstem in and thrivagn National City is a municipal
affair; and
Whereas, tne constructior. of a freeway through National
City will have a substantial effect on the major and. second-
ary streeo systems of that city; and
Wheneas, the construction or said freeway requires the
relocation of official survey points within the City of
National City in order that said freeway may be constructed.;
NO filihiaERT,",