HomeMy WebLinkAbout2012 CC RESO 2012-36 CDCRESOLUTION 2012 — 36
RESOLUTION OF THE COMMUNITY DEVELOPMENT COMMISSION OF
THE CITY OF NATIONAL CITY ADOPTING THE JANUARY 31, 2012 AMENDED
DRAFT INITIAL RECOGNIZED OBLIGATIONS PAYMENT SCHEDULE
WHEREAS, the Community Development Commission of the City of National
City ("CDC") is a public body, corporate, politic, formed, organized, and exercising its powers
and existing pursuant to the California Community Redevelopment Law, Health and Safety
Code Section 33000, et seq., (the "CRL"), and specifically formed by the City Council of the City
of National City; and
WHEREAS, continued redevelopment to eliminate blight, improve public facilities
and infrastructure, renovate and construct affordable housing, and enter into partnerships with
private industries to create jobs and expand the local economy is vital to the health, safety and
welfare of the City; and
WHEREAS, Parts 1.8, 1.85 and 1.9 of Division 24 of the CRL were added by
Assembly Bill x1 26 and Assembly Bill x1 27 (together the "2011 Redevelopment Legislation"),
which laws purported to become effective immediately; and
WHEREAS, the 2011 Redevelopment Legislation is a part of multiple trailer bills
to the Fiscal Year 2011-2012 California budget bills that were approved by both houses of the
State Legislature on June 15, 2011, and signed by the Governor on June 28, 2011; and
WHEREAS, part 1.85 of the CRL (the "Dissolution Act") added by the 2011
Redevelopment Legislation ("Part 1.85") provides for the statewide dissolution of all
redevelopment agencies, including the CDC (but not dissolution of the housing authority
thereof), as of October 1, 2011, and provides that, thereafter, a successor agency will
administer the enforceable obligations of the redevelopment agency of the CDC and otherwise
wind up the CDC's affairs as a redevelopment agency, all subject to the review and approval of
an oversight committee; and
WHEREAS, as part of this wind up process, all redevelopment agencies are
required to prepare a preliminary draft of the initial recognized obligations payment schedule
listing payments to be made January 2012 through the end of June 2012; and
WHEREAS, the dissolution of the CDC would be detrimental to the health, safety
and economic well-being of the residents of the City, and would cause irreparable harm to the
community because, among other reasons, the redevelopment activities and projects made
possible, implemented and funded by the CDC are highly significant and of enduring benefit to
the community and the City and are a critical component of the City's future; and
WHEREAS, on July 18, 2011, the California Redevelopment Association, League
of California Cities, City of Union City, City of San Jose, and John F. Shirey filed a petition for
Writ of Mandate; Application for Temporary Stay, and supporting memorandum and
declarations with the Supreme Court of the State of California (the "Petition"); and
WHEREAS, on August 11, 2011, the California Supreme Court agreed to review
the Petition challenging the constitutionality of the 2011 Redevelopment Legislation and ordered
a stay (the "Supreme Court Stay") relative to specified portions of the2011 Redevelopment
Legislation; and
Resolution No. 2012 — 36
January 31, 2012
Page Two
WHEREAS, on August 17, 2011, the California Supreme Court revised the
Supreme Court Stay; and
WHEREAS, the Supreme Court Stay postponed certain provisions of the 2011
Redevelopment Legislation indefinitely, but left in place provisions requiring a preliminary draft
of the initial recognized obligations payment schedule; and
WHEREAS, on September 27, 2011, the CDC approved its preliminary draft of
the Initial Recognized Obligations Payment Schedule ("ROPS"); and
WHEREAS, on December 29, 2011, the California Supreme Court issued is
ruling which upheld ABx1 26 as valid and invalidated ABx1 27; and
WHEREAS, the California Supreme Court in its December 29, 2011 ruling moved
the dissolution date, originally established as October 1, 2011, to February 1, 2012, and also
added four months to the implementation and/or effective dates of many of the actions required
under ABx1 26; and
WHEREAS, based on the California Supreme Court ruling of December 29,
2011, and subject to the contingencies and reservations set forth herein, on January 24, 2012 the
CDC adopted an Amendment to the Draft Initial Recognized Obligations Payment Schedule for the
time period of January 1, 2012 through June 30, 2012, and reserved the right to amend it from
time to time as necessary; and
WHEREAS, subject to the contingencies and reservations set forth herein, the
CDC desires to amend the preliminary draft of the Initial Recognized Obligations Payment
Schedule; and
WHEREAS, the CDC, by adoption of this Resolution, does not represent,
disclaim, or take any position whatsoever on the issue of the validity of the 2011
Redevelopment Legislation, but rather the CDC seeks to comply with the Constitution and the
laws of the State of California, including the 2011 Redevelopment Legislation, and the
December 29, 2011 California Supreme Court ruling, in order to preserve the ability of the CDC
to continue to operate and perform its obligations and thereby benefit the community.
NOW, THEREFORE, BE IT RESOLVED by the Community Development
Commission of the City of National City as follows:
Section 1.
Section 2.
The foregoing Recitals are true and correct, and incorporated into this
Resolution by this reference, and constitute a material part of this
Resolution.
Pursuant to California Health and Safety Code Section 34169, the CDC
hereby amends the preliminary draft of the initial Recognized Obligations
Payment Schedule. The preliminary draft of the Initial Recognized
Obligations Payment Schedule is that which is referred to in Health and
Safety Code Section 34169(h), and shall be interpreted and applied in all
Resolution No. 2012 — 36
January 31, 2012
Page Three
Section 3.
Section 4.
respects in accordance with such section and the California
Redevelopment Law, to the fullest extent permitted by law. However, it is
applicable to and binding on the CDC only to the extent that Part 1.8 of
the 2011 Redevelopment Legislation is applicable to the CDC.
The Executive Director, or designee, is hereby authorized and directed to:
(i) post the amended preliminary draft of the Initial Recognized
Obligations Payment Schedule on the City's website; (ii) notify the County
Auditor -Controller, the State Controller and the State Department of
Finance concerning the posting of such document; (iii) ) deliver the
amended preliminary draft of the Initial Recognized Obligations Payment
Schedule to the Successor Agency when the Successor Agency comes
into effect; and, (iv) take such other actions and execute such other
documents as are necessary to effectuate the intent of this Resolution.
This Resolution shall in no way be construed as requiring the CDC to
abide by the 2011 Redevelopment Legislation in the event either, or both,
bills are found unconstitutional or otherwise legally invalid in whole or in
part, nor shall this Resolution effect or give rise to any waiver of right or
remedies the CDC may have, whether in law or in equity, to challenge the
2011 Redevelopment Legislation. This Resolution shall not be construed
as the CDC's willing acceptance of, or concurrence with the 2011
Redevelopment Legislation, either ABx1 26 or ABx1 27; nor does this
Resolution evidence any assertion or belief whatsoever on the part of the
CDC that the 2011 Redevelopment Legislation is/are constitutional or
lawful.
Section 5. The Secretary shall certify to the adoption of this Resolution, which shall
take effect upon the date of its adoption.
PASSED and ADOPTED this 31st day of January'12.
ATT
on orrison. C
Brad R ulston, Secretary
VED AS TO FORM:
Passed and adopted by the Community Development Commission of the City of
National City, California, on January 31, 2012, by the following vote, to -wit:
Ayes: Commissioners Morrison, Natividad, Rios, Sotelo-Solis, Zarate.
Nays: None.
Absent: None.
Abstain: None.
AUTHENTICATED BY: RON MORRISON
Chairman, Community Development Commission
Secretary`Lorrrriiuni Development Commission
By:
Deputy
I HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of
RESOLUTION NO. 2012-36 of the Community Development Commission of the City of
National City, Califomia, passed and adopted on January 31, 2012.
Secretary, Community Development Commission
By:
Deputy
Project Na oe/Ohligation
BOND OBLIGATIONS
Payees)
City of National City
Amended Initial Recognized Obligations Payment Schedule
January 1, 2012-June 30, 2012
Description
Total TI/Bond
Obligation
6 Month Total
Payment Date Thru June 30, 2012
January February March April
May
EXHIBIT A
June
1
1999 lax Allocation Bond
Bank of New York
1999
$ 3,835,000
$ 97,462
$ 97,463
2
2004 Tax Allocation Bond
Deutsche Bank
2004
$ 4,060,000
$ 99,875
$ 99,875
3
2005 Tax Allocation Bond
Deutsche Bank
2005
$ 23,550,000
$ 547,671
$ 547,671
4
2011 Tax Allocation Bond
Deutsche Bank
2011
$ 39,335,000
$ 1,282,515
$ 1,282,515
5
7 BOND PROJECTS
8 WI-TOD
9
10
11
12
13
14
15
16
17
18
19
20
21
22
egal commitments per the on dors
Westside Infdl Transit -Oriented
Development - 201-unit affordable housing
WI-TOD (DDA)
Paradise Creek Housing Partners
Pre -development loan
$
3,741,600
$
1,300,000
$ 300,000
$ 200,000
$ 200,000
$ 200,000
$ 200,000
$
200,000
WI-TOD (DDA)
Paradise Creek Housing Partners
Phase I City Grant
$
17,215,400
WI-TOD (DDA)
Paradise Creek Housing Partners
Phase II (not included in totals)
$ 14,909,000
WI-TOD
City of National City/Kimley-Horn & Associates
Public Works relocation - Design /
Engineering
$
261,902
$
261,902
$
-
$ 61,902
$ 50,000
$ 50,000
$ 50,000
$
50,000
WI-TOD
Property Owner - Various
Purchase Replacement Yard
$
2,000,000
$
2,000,000
$
-
$ -
$ -
$ 2,000,000
$ -
$
-
WI-TOD
City of National City
Building/Relocation Costs
$
1,500,000
WI-TOD
E2 ManageTech
Remediation planning
$
136,836
$
64,699
$
10,783
$ 10,783
$ 10,783
$ 10,783
$ 10,783
$
10,783
WI-TOD
City of National City/DISC
Environmental oversight
$
74,984
5
32,693
$
6,539
$ 6,539
$ 6,539
$ 6,539
5 3,269
$
3,269
WI-TOD
City of National City/Contractor - Various
Environmental Clean -Up
$
700,000
$
210,000
$
-
$ -
$ -
$ 70,000
5 70,000
$
70,000
WI-TOD
City of National City/Contractor - Various
Site Demolition / Grading
$
400,000
WI-TOD
City of National City/Consultant- Various
Construction Management & Inspections
$
150,000
WI-TOD
City of National City/Opper & Varco
Environmental outside counsel
5
19,500
$
16,875
5
3,375
5 3,375
$ 3,375
$ 3,375
$ 1,687
$
1,687
WI-TOD
City of National City
Project Management & Administration
$
700,000
$
350,000
$
-
$ 70,000
$ 70,000
$ 70,000
$ 70,000
$
70,000
5R54 and National City Blvd
23 Infrastructure Improvements
24
25
Off ramp and street improvements
necessary to redevelop "RCP Site" APN tt562-
5,1_ne
SR54 and National City Blvd
Infrastructure Improvements
City of National City/Contractor - Various
Construction
$ 2,500,000
8th St Corridor Smart Growth
26 Revitalization / Safe Routes to School
27
28
29
30
Traffic calming, pedestrian, bicycle and
8th St Corridor Smart Growth
Revitalization / Safe Routes to School
City of National City/Harris & Associates
Design / Engineering
$
276,347
$
121,101
$ 31,070
5 18,006
$ 18,006
$ 18,006
$ 18,006
$
18,006
8th St Corridor Smart Growth
Revitalization / Safe Routes to School
City of National City/Project Professionals
Corporation
Phase I - Construction Management &
Inspections
$
221,299
$
132,779
$ 22,130
$ 22,130
$ 22,130
$ 22,130
$ 22,130
$
22,130
8th St Corridor Smart Growth
Revitalization / Safe Routes to School
City of National City/Consultant - Various
Phase II - Construction Management &
Inspections
$
400,000
8th St Corridor Smart Growth
Revitalization / Safe Routes to School
City of National City/Contractor - Various
Phase II - Construction
$
2,000,000
31
32
33
Proleet NamelOblieation
Par
City of National City
Amended Initial Recognized Obligations Payment Schedule
January 1, 2012 -June 30, 2012
Total Tl/Bond
Payment Date Thrn June 30, 2012
EXHIBIT A
8th St Corridor Smart Growth
Revitalization / Safe Routes to School
City of National City/URS
�___..r....,..
Program Management
...............
$
15,625
., ,.,,.,,...
$
.v,e.
7,813
aamm ,
$ -
$
rcrrruary
1,563
.motto
$ 1,563
Hprn
$ 1,563
‘lay
$ 1,563
$
./une
1,563
8th St Corridor Smart Growth
Revitalization / Safe Routes to School
City of National City
Project Management & Administration
$
300,000
$
150,000
$ -
$
30,000
$ 30,000
$ 30,000
$ 30,000
5
30.000
34 8th St Corridor Safety Enhancemments
35
36
37
38
39
40
Highland Ave Corridor Safety
41 Enhancements
42
43
44
45
46
47
D Ave Community Corridor / 12th St & D
48 Ave Roundabout
49
50
51
52
53
54
Coolidge Ave Community Corridor / Safe
55 Routes to School
Coolidge Ave Community Corridor / Safe
56 Routes to School
Traffic calming, pedestrian enhancements,
new traffic si
8th St Corridor Safety Enhancemments
City of National City/8BF Consultants
Design / Engineering
$
46,257
$
35,877
$
302
$
7,11S
$
8,894
j
8,894
$
5,336
$
5,336
15,000
8th St Corridor Safety Enhancemments
City of National City/Consultant Various
Construction Management & Inspections
$
150,000
$
15,000
$
-
$
$
-
$
-
$
8th St Corridor Safety Enhancemments
City of National City/Contractor - Various
Construction
$
178,118
$
17,812
$
-
$
-
$
-
$
-
$
17,812
8th St Corridor Safety Cnhancemments
City of National City/URS
Program Management
$
15,625
5
7,813
$
-
$
1,563
$
1,563
$
1,563
$
1,563
5
1,563
8th St Corridor Safety Enhancemments
City of National City
Project Management & Administration
$
40,000
5
20,000
$
-
$
4,000
$
4,000
$
4,000
$
4,000
$
4,000
Traffic calming and pedestrian
n
Highland Ave Corridor Safety
Enhancements
City of National City/Consultant- Various
Design / Engineering
$
300,000
$
60,000
$ -
$
-
$ -
$
-
$ 30,000
$
30,000
Highland Ave Corridor Safety
Enhancements
City of National City/Consultant - Various
Construction Management & Inspections
$
300,000
Highland Ave Corridor Safety
Enhancements
City of National City/Contractor - Various
Construction
$
1,000,000
Highland Ave Corridor Safety
Enhancements
City of National City/URS
Program Management
$
15,625
$
7,813
$ -
$
1,563
5 1,563
$
1,563
$
1,563
$
1,563
Highland Ave Corridor Safety
Enhancements
City of National City
Project Management & Administration
$
80,000
$
40,000
$ -
$
8,000
$ 8,000
$
8,000
$
8,000
$
8,000
Traffic calming, pedestrian and bicycle
D Ave Community Corridor / 12th St & D
Ave Roundabout
City of National City/Kimley-Horn & Associates
Design / Engineering
$
202,685
$
136,910
$
63,732
$
14,636
$ 36,589
$ 14,536
$
7,318
$
-
0 Ave Community Corridor / 12th St & D
Ave Roundabout
City of National City/Consultant-Various
Construction Management & Inspections
$
150,000
$
15,000
$
-
$
-
$ -
$ _
$
-
$
15,000
D Ave Community Corridor / 12th St & D
Ave Roundabout
City of National City/Contractor - Various
Construction
$
181,691
5
18,169
$
-
$
-
$ -
$ -
$
-
$
18,169
D Ave Community Corridor / 12th St & D
Ave Roundabout
City of National City/URS
Program Management
$
15,625
5
7,813
$
-
$
1,563
$ 1,563
$ 1,563
$
1,563
$
1,563
D Ave Community Corridor / 12th St & D
Ave Roundabout
City of National City
Project Management & Administration
$
50,000
$
25,000
$
-
$
5,000
$ 5,000
$ 5,000
$
5,000
$
5,000
City of National City/Kirnley-Horn & Associates
Traffic calming, pedestrian, bicycle and
streetscape enhancements
Design / Engineering
2,259,026
293,401 $ 140,427
5 16,954
$ 37,042
49,389
24,695
$ 12,347 $
2
57
58
59
60
61
Project Name,!Oblieation
Pavee(s
City of National City
Amended Initial Recognized Obligations Payment Schedule
January 1, 2012 - June 30, 2012
Total Tl/Bond
January
Payment Date Thru June 30, 2012
A ril
EXM131T A
Coolidge Ave Community Corridor / Safe
Routes to School
City of National City/Consultant -Various
Construction Management & Inspections
----
$
----
300,000
-------------
$
30,000
5 -
--.,..._.,_
$
_
-
..-_.-..
5 -
_ p
-
3._.
5 -
....
$ 30,000
Coolidge Ave Community Corridor / Safe
Routes to School
City of National City/Contractor - Various
Construction
$
1,500,000
$
150,000
$ -
$
-
$ -
$ -
$ -
5
150,000
Coolidge Ave Community Corridor / Safe
Routes to School
City of National City/URS
Program Management
$
15,625
5
7,813
$ -
$
1,563
$ 1,563
$ 1,563
$ 1,563
$
1,563
Coolidge Ave Community Corridor/Safe
Routes to School
City of National City
Project Management & Administration
$
150,000
$
75,000
5 -
$
15,000
$ 15,000
$ 15,000
$ 15,000
5
15,000
62 4th St Community Corridor
63
64
65
66
67
Traffic calming, pedestrian and bicycle
enhancements
400,000
4th St Community Corridor
City of National City/Consultant - Various
Design / Engineering
$
200,000
$
40,000
5 -
$
-
$
- $
-
$ 20,000
5
20,000
4th St Community Corridor
City of National City/Consultant - Various
Construction Management & Inspections
$
144,375
4th St Community Corridor
City of National City/URS
Program Management
$
15,625
$
7,813
$ -
$
1,563
$
1,563
$
1,563
$ 1,563
$
1,563
4th St Community Corridor
City of National City
Project Management & Administration
$
40,000
$
20,000
$ -
$
4,000
$
4,000
$
4,000
$ 4,000
$
4,000
68 Las Palmas Park Improvements
69
70
71
72
73
74
75
Park and quality of life facility
enhancements
8,081,88
Las Palmas Park Improvements
City of National City/Kimley-Horn & Associates
Design / Engineering
$
166,260
$
110,927
$ 36,026
$
29,961
$ 22,470
$ 14,980
$ 7,490
$
Las Palmas Park Improvements
City of National City/Consultant - Various
Design / Engineering
$
600,000
$
120,000
$ -
5
-
$ -
5
-
$ 60,000
$
60,000
Las Palmas Park Improvements
City of National City/Consultant - Various
Construction Management & Inspections
$
300,000
Las Palmas Park Improvements
City of National City/Contractor - Various
Construction
$
6,500,000
Las Palmas Park Improvements
City of National City/URS
Program Management
$
15,625
$
7,813
$ -
$
1,563
$ 1,563
$
1,563
$ 1,563
$
1,563
Las Palmas Park Improvements
City of National City
Project Management & Administration
5
500,000
$
250,000
$ -
$ 50,000
$ 50,000
$ 50,000
$ 50,000
$
50,000
76 Kimball Park Improvements
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
Park and quality of life facility
enhancements
3,434,233
Kimball Park Improvements
City of National City/Kimley-Horn & Associates
Design / Engineering
$
156,938
$
87,831
$ 42,210
$
18,248
$ 13,686
$
9,124
$ 4,562
$
Kimball Park Improvements
City of National City/Kimley-Horn
Prepare technical reports for Prop. 84 Grant
application submittal
$
11,610
$
3,483
$
3,483
$
-
$ -
5
-
$ -
$
-
Kimball Park Improvements
City of National City/Consultant - Various
Design / Engineering
$
300,000
$
60,000
5
-
$
-
$ -
$
-
5 30,000
$
30,000
Kimball Park Improvements
City of National City/Consultant - Various
Construction Management & Inspections
$
150,000
Kimball Park Improvements
City of National City/Contractor - Various
Construction
$
2,500,000
Kimball Park Improvements
City of National City/URS
Program Management
$
15,625
$
9,375
$
1,563
$
1,563
$ 1,563
$
1,563
$ 1,563
$
1,563
Kimball Park Improvements
City of National City
Project Management & Administration
$
300,000
$
150,000
$
-
$
30,000
$ 30,000
5
30,000
$ 30,000
$
30,000
Aquatic Center
Park and duality of life facilities
4,078,15
Aquatic Center
City of National City/Safdie Rabines Architects
Architectural services
$
320,355
$
128,077
$ 51,231
$
25,615
$ 12,808
$ 12,808
$ 12,808
$
12,808
Aquatic Center
City of National City/Project Professionals Corp
Construction Management
$
242,179
$
132,000
$ 22,000
$
22,000
$ 22,000
$ 22,000
$ 22,000
$
22,000
Aquatic Center
City of National City/Contractor - Various
Construction
$
3,300,000
$
660,000
$ -
$
-
$ -
$ -
5 330,000
$
330,000
Aquatic Center
City of National City/URS
Program Management
$
15,625
$
7,813
5 -
$
1,563
$ 1,563
$ 1,563
$ 1,563
$
1,563
Aquatic Center
City of National City
Project Management & Administration
$
200,000
$
100,000
$ -
$
20,000
$ 20,000
$ 20,000
$ 20,000
$
20,000
92 Total Bond Project Obligations
$ 53,592,420
3
Project Name/Obligation
93
Payee(s)
City of National City
Amended Initial Recognized Obligations Payment Schedule
January 1, 2012 - lune 30, 2012
Description
Total TIiBond
Olrl igal ion
b Nlonthrolal
EXHIBIT A
Payment Date Thru June 30, 2012
.lannary February March April :11ay June
94
95 loans
96
Loan for investigation of hr ow afield site -
Loan
CaIREUse
835 Bay Marina Dr
$ 32,694
loan egrceement between the1PFA an
Bof A re the Police Facility
97
98 Pass-thru Payments
99
100
101
102
103
104
105
106
107
108
109
110
111
112 Judgments and Settlements
113
114
115
Legal Settlement
CYAC vs CDC - Amount on Appeal
Rank of America
Loan for Police Station
3,280,000
Pass-thru payments
Lower Sweetwater
Payments to Other Gov't Agencies
$
1,433
Pass-thru payments
County of San Diego
Payments to Other Gov't Agencies
$
166,400
Pass-thru payments
County of San Diego
Payments to Other Gov't Agencies
$
763,264
Pass-thru payments
Office of Education
Payments to Other Gov't Agencies
$
287,403
Pass-thru payments
Southwestern College
Payments to Other Gov't Agencies
$
268,708
Pass-thru payments
City of National City
Payments to Other Gov't Agencies
$
609,984
Pass -thin payments
National City Elementary District
Payments 10 Other Gov't Agencies
$
70,111
Pass-thru payments
Sweetwater Union District
Payments to Other Gov't Agencies
$
42,899
Pass-thru payments
MWD SDCWA
Payments to Other Gov't Agencies
$
5,837
Pass-thru payments
Fiscal agent fees
Payments to Other Gov't Agencies
$
10,000
Pass-thru payments
City of National City
Payments to Other Gov't Agencies
$
1,852,145
$
926,073
$ 151,346
$ 154,346
$ 154,346
$ 154,346
$ 154,346
$
154,346
Pass-thru payments
CWA National City
Payments to Other Gov't Agencies
$
5,754
CYAC/Leif
Highland Park, LLC
Judgment for Legal Fees (Appealed)
Legal settlement, Purple Cow
$
2,000,000
64,000
116 Property Management CDC Properties
117
118
119
120
121
122
123
124
125
Binding Agreements/Contracts,
Administrative Expenses and Associated
126 Obligations
127
General Property Management
City of National City
Ongoing management of CDC assets
Kimball House
National City Historical Society & County of San Diego
Annual payment per lease agreement,
possessory interest tax
$
15,364
$
15,364
$
5,000
$ 10,364
CDC properties
EDCO
Trash hauling all RDA owned properties
$
1,895
$
524
$
105
$
105
$
105
$ 105
$
105
CDC Properties
NBS
Landscape Services
$
9,500.00
$
6,000
$
1,000
$
1,000
$
1,000
$
1,000
$ 1,000
$
1,000
Temporary Aquatic Center
Power Plus
Rental of temporary power poles
$
3,000
$
975
$
195
$
195
$
195
$ 195
$
195
CDC properties in perpetuity
SDG&E
Electricity & gas for RDA properties
$
4,828
$
2,012
$
402
$
402
$
402
$ 402
$
402
Old Library redevelopment
Stanley Sonitrol
Fire alarm monitoring
$
485
$
243
$ 243
CDC properties
Sweetwater Authority
Water including irrigation RDA properties
$
14,961
$
6,250
$
1,250
$
1,250
$
1,250
$ 1,250
$
1,250
Palm Plaza
National Construction Rental
Temporary fencing of RDA site
$
791
$
791
$
791
Administrative Expenses and Associated
Obligations
City of National City (subject to labor contract and
other agreements and associated obligations that
include CaIPERS, PARS, Health Care Contracts, TriStar,
Alliant-Insurance
Personnel Cost (Reimbursement Agreement)
$
1,508,879
$
754,439
$ 125,740
$ 125,740
$ 125,740
$ 125,740
$ 125,740
$
125,740
4
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
14
14
14
14
15
15
15
15
15
Project Name/Ohliaation
Paveefs
City of National City
Amended Initial Recognized Obligations Payment Schedule
January 1, 2012 -June 30, 2012
Deseriotinn
Total TI!Bond
ation
6 Month Total
January
February
Payment Date Thru June 3f1, 2012
March
April
Mav
EXHIBIT A
.tune
Reimbursement Agreement
6
7
8
9
0
1
2
3
4
City of National City
Overall Reimbursement Agreement executed
between the CDC and City of National City
$
5,442,827
Cooperation Agreement -Overall
City of National City
Agreement for City to Implement CIP
Program
$
55,226,623
Cooperation Agreement-WI-TOD
City of National City
Agreement for City to Implement WI-TOD
Project
$
40,000,000
Cooperation Agreement- SR54
City of National City
Agreement for City to Implement Gateway
5R54 Project
S
2,500,000
Low Moderate Income dousing Fund
Housing Authority
Projected LMIHF through the life of the
agency
S
/5,901,324
Housing Element
Housing Authority
State Mandates/Goals for Housing
Housing Admin Expenses
Housing Authority
Personnel Cost (Reimbursement Agreement)
5
108,920
$
108,920
$
18,153
$
18,153
$ 18,153
5
18,153
$ 18,153
$
18,153
Housing Admin Expenses
Housing Authority
Budget needs to be established for separate
agency based on housing obligations
TBD
Oversight Board Admin
Successor Agency/City of National City (Budget TBD)
Provide support for Oversight Board and
other obligations of the County and State
related to the dissolution
TBD
Joint Powers Financing Authmity ()PEA)
Agency Admin Expenses
County of San Diego
Environmental Oversight Remediation and
Testing for Education Village, ACE, 2501
Cleveland, 835 Bay Marina Drive
$
182,415
$
3,600
$ 1,800
$
1,800
Agency Admin Expenses
GeoSyntec Consultants
$
33,000
$
15,000
$ 2,000
$
S00
$ 15,000
5
500
Graffiti Abatement Program
ACE Uniform
Supplies (Graffiti)
$
200
$
40
$ 40
$
40
$ 40
$
40
Graffiti Abatement Program
Root World Inc
Supplies (Graffiti)
$
250
5
50
$ 50
$
50
$ 50
5
S0
Graffiti Abatement Program
CA Air Compressor Co.
Supplies (Graffiti)
$
2,500
$
500
$ 500
$
500
$ 500
$
S00
Graffiti Abatement Program
Maintex
Supplies (Graffiti)
$
1,000
$
200
$ 200
$
200
$ 200
$
200
Graffiti Abatement Program
Western Hose & Gasket
Supplies (Graffiti)
$
500
$
100
$ 100
5
100
5 100
5
100
Graffiti Abatement Program
Smart & Final
Supplies (Graffiti)
$
500
$
100
$ 100
$
100
5 100
$
100
Graffiti Abatement Program
Prudential Overall Supply
Laundry (Graffiti)
$
240
$
48
5 48
$
48
$ 48
$
48
Graffiti Abatement Program
San Diego Trolley Inc
Flagging Services (Graffiti)
$
275
$
55
$ 55
$
55
5 55
$
55
Graffiti Abatement Program
Pro Build
Supplies (Graffiti)
$
1,000
$
200
$ 200
$
200
$ 200
$
200
Graffiti Abatement Program
Vista Paint
Supplies (Graffiti)
$
15,500
$
3,100
$ 3,100
$
3,100
$ 3,100
$
3,100
Graffiti Abatement Program
West -flex Industrial
Supplies (Graffiti)
$
-
Agency Adrnin Expenses
Keagy
Real Estate Appraisal Services
5
15,000
$
15,000
5 15,000
Agency Admin Expenses
PGP
Real Estate Appraisal Services
$
15,000
$
15,000
$ 15,000
Agency Admin Expenses
Ken Carpenter
Real Estate Appraisal Services
$
15,000
$
15,000
$ 15,000
Agency Adrnin Expenses
HdL Caren & Cone
Financial Analysis
$
40,000
$
40,000
$
-
$
-
$ -
$
-
$ -
5
40,000
Agency Admin Expenses
Keyser Marston Associates
Economic Analysis per 33433
$
50,000
$
-
Agency Admin Expenses
Urban Futures
Financial and bond adviser
5
40,000
$
10,000
$
3,333
5 3,333
5
3,333
Agency Admin Expenses
Port of San Diego
Joint Planning
$
31,696
$
31,696
$
31,696
Agency Admin Expenses
GeoSyntec Consultants
PSI Environmental Investigation
$
59,946
$
Agency Admin Expenses
Tierra West Advisors
Wesiside Amortization
$
18,059
5
-
Agency Admin Expenses
SANDAG
Membership
$
7,500
$
-
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181 Housing Admin Expenses
182
183
184
185
186
187
188
189
MAAC Project- Tecolote Court
City of National City (Housing Authority)
Monitor Affordability Covenants
1602 Euclid
City of National City (Housing Authority)
Monitor Affordability Covenants
Park Villas Apartments
City of National City (Housing Authority)
Monitor Affordability Covenants
Copper Hills Apartments
City of National City (Housing Authority)
Monitor Affordability Covenants
Plaza City Apartments
City of National City (Housing Authority)
Monitor Affordability Covenants
Habitat for Humanity- G Ave
City of National City (Housing Authority)
Monitor Affordability Covenants
Casa Familiar
City of National City (Housing Authority)
Monitor Affordability Covenants
Monitoring Cost
City of National City (Housing Authority)
Monitor Affordability Covenants
Project NameiOblieation
Pay
City of National City
Amended Initial Recognized Obligations Payment Schedule
January 1, 2012 - lune 30, 2012
Total TtJBond
•
Payment Dale then June 30, 2012
EXHIBIT A
Agency Admin Expenses
CRA
r.......
Membership
S
..,..,�o.. ...
827
., ..aomn
5
t tirn,
827
.,uuua.r
1'e MIME
11nr Cn
5 827
7prII
Islay
June
Agency Admin Expenses
Tyler Technologies
Financial Systems Software Services
$
3,000
$
3,600
$
600
$ 600
5 600
$ 600
$ 600
$
600
Agency Admin Expenses
Staples
Office Supplies
$
7,500
$
1,200
$
200
$ 200
$ 200
$ 700
$ 200
5
200
Agency Admin Expenses
Federal Express
Delivery Service
5
900
$
133
$ 21
$ 21
$ 35
5 35
5
71
Agency Admin Expenses
San Diego Clipping Service
Record Keeping
$
707
$
-
Agency Admin Expenses
City of San Diego
Admin services for SO Regional Enterprise
Zone
5
51.000
$
51,000
$ 51,000
Agency Admin Expenses
Union Tribune
Public Noticing
5
10.000
Agency Admin Expenses
Yolanda Teresa Lopez
Translation and Interpretation Services
$
450
Agency Admin Expenses
Rick Engineering
Bay Marina Drive - engineering
5
2,288
$
2,288
$
-
$ 2,288
$ -
$
$ -
$
Agency Admin Expenses
San Diego Association of Governments
Grant match
$
20,000
$
10,000
$
-
$ 10,000
$ -
$ -
$ -
$
-
Agency Admin Expenses
Caltrans
Grant match
$
300,000
$
300,000
$
-
$ -
$ -
$ 150,000
$ 150,006
$
-
Agency Legal Expenses
Kane, Ballmer, & Berkman
Legal support for state actions on
Redevelopment
$
11,249
_
$
11,249
5 4,749
$ 6,500
Agency Legal Expenses
5ohagi Law Group
Litigation CYAC, Nunez
$
101,000
$
80,000
$ 20,000
$ 70,000
$ 20,000
$
20,000
Agency Legal Expenses
Opper & Varco, LLP
Litigation for Education Village
$
13,000
$
7,800
$ 1,300
$ 2,000
$ 1,500
$ 1,500
5
1,500
Agency Legal Expenses
Christensen & Spath, LLP
Litigation for ARE Holdings
5
150,000
$
46,000
$ 9,200
$ 9,200
$ 9,200
$ 9,200
5
9,200
Agency Legal Expenses
Best Best & Krieger, LLP
Litigation CYAC
$
210,001
$
134,000
$ 59,000
$ 37,500
$
37,500
Agency Legal Expenses
Christensen & Spath, LLP
Litigation Barrerra
$
150,000
$
120,000
$
20,000
$ 20,000
$ 20,000
$ 20,000
$ 20,000
$
20,000
Agency Legal Expenses
Mozzarella Lorenzana
Minimize CYAC Liability -Indemnity
$
250,000
$
100,000
$ 20,000
$ 20,000
$ 20,000
$ 20,000
$
20,000
Agency On -call Services
Project Professionals Corporation
On -call Engineering
5
300,000
$
300,000
5
20,000
$ 40,000
$ 60,000
$ 60,000
$ 60,000
5
60,000
Agency On -call Services
Kimley-Horn & Associates
On -call Engineering
5
300,000
5
300,000
$
20,000
$ 40,000
$ 60,000
$ 60,000
$ 60,000
$
60,000
Agency On -call Services
Harris & Associates
On -call Engineering
5
300,000
$
300,000
$
20,000
$ 40,000
$ 60,000
$ 60,000
$ 60,000
5
60,000
Agency On -call Services
Bureau Veritas North America
On -call Engineering
5
300,000
5
300,000
$
20,000
$ 40,000
$ 60,000
$ 60,000
$ 60,000
5
60,000
Agency On -call Services
D-MAX Engineering
On -call stormwater compliance
$
200,000
$
120,000
$
20,000
$ 20,000
$ 20,000
$ 20,000
$ 20,000
5
20,000
Agency On -call Services
Esgil Corporation
On -call plan review/inspections
5
240,000
$
240,000
$ 40,000
$ 40,000
$ 40,000
$ 40,000
$ 40,000
$
40,000
6