HomeMy WebLinkAboutCC RESO 2015-167RESOLUTION NO. 2015 — 167
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY
AUTHORIZING THE MAYOR TO EXECUTE AN AGREEMENT WITH
DOKKEN ENGINEERING, INC., FOR A NOT -TO -EXCEED AMOUNT
OF $100,000 TO PROVIDE ENGINEERING AND CONSTRUCTION
SUPPORT SERVICES FOR PLAZA BOULEVARD WIDENING PROJECT
WHEREAS, on November 21, 2006, the City Council adopted Resolution No.
2006-226 entering into an Agreement with Dokken Engineering, Inc. ("Dokken"), to provide
engineering services for the Plaza Boulevard Widening Project; and
WHEREAS, while under contract, Dokken Engineering prepared a complete set
of construction plans and technical specifications for the widening of Plaza Boulevard between
Highland Avenue and Euclid Avenue, but due to a shortfall in construction funding, staff was
unable to advertise the project for public bidding; and
WHEREAS, currently, funding is available to construct Phase I from Palm Ave to
1-805, and most of the funding has been secured to construct Phase II from Highland Avenue to
Palm Avenue, with remaining funds projected to be available in the first quarter of Fiscal Year
2017; and
WHEREAS, the plans and technical specifications are now approaching five
years old and need to be updated to ensure compliance with current design standards; and
WHEREAS, because Dokken Engineering served as the Engineer of Record for
preparation of the original plans, they are the most qualified by experience and ability to
complete the revisions desired by the City, and Dokken Engineering is willing to perform such
services for a not -to -exceed amount of $100,000 and a term of two years; and
WHEREAS, the scope of services for this Agreement consists of professional
engineering services for Phases I and II including, but not limited to, revision of plans and
specifications to ensure compliance with current design standards, cost estimates, special
provisions, utility coordination, surveying, construction support and preparation of record
drawings.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of
National City hereby authorizes the Mayor to execute a two-year Agreement with Dokken
Engineering, Inc., to provide professional engineering services for Phases I and II of the Plaza
Boulevard Widening Project, including, but not limited to, revision of plans and specifications to
ensure compliance with current design standards, cost estimates, special provisions, utility
coordination, surveying, construction support and preparation of record drawings.
[Signature Page to Follow]
Resolution No. 2015 — 167
Page Two
PASSED and ADOPTED this 17th day of November, 2015.
on Morrison, Mayor
ATTEST:
el
Mich R. Dalla , C sty Clerk
ROVED A. TO FOR
C" dia Gacitua ilva
City Attorney
Passed and adopted by the Council of the City of National City, California, on
November 17, 2015 by the following vote, to -wit:
Ayes: Councilmembers Mendivil, Morrison, Rios, Sotelo-Solis.
Nays: None.
Absent: Councilmember Cano.
Abstain: None.
AUTHENTICATED BY: RON MORRISON
Mayor of the City of National City, California
JL
CityCity o Na
C rk of theitional City, California
By:
Deputy
I HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of
RESOLUTION NO. 2015-167 of the City of National City, California, passed and
adopted by the Council of said City on November 17, 2015.
City Clerk of the City of National City, California
By:
Deputy