HomeMy WebLinkAboutCC RESO 2016-59RESOLUTION NO. 2016 — 59 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY INCREASING THE CONTRACT WITH KINSMAN CONSTRUCTION, INC., FOR THE NOT TO EXCEED AMOUNT OF $127,007.15 FOR THE POLICE DEPARTMENT BUILDING IMPROVEMENTS PROJECT, AND AUTHORIZING THE MAYOR TO EXECUTE CHANGE ORDER NO. 7 IN THE AMOUNT OF $127,007.15 TO PROVIDE WATERPROOFING AROUND THE ENTIRE GROUND FLOOR PERIMETER OF THE POLICE DEPARTMENT BUILDING, PLANTER BOXES, AND TWO PEDESTRIAN DECKS ON THE SECOND FLOOR WHEREAS, on September 15, 2015, City Council adopted Resolution No. 2015- 139 awarding a contract in the amount of $768,463 to Kinsman Construction, Inc., for the Police Department Building Improvements Project, CIP No. 15-06; and WHEREAS, the original contract in the not to exceed amount of $768,463 included electrical and mechanical upgrades to support expansion of the Police Department Property and Evidence Room, Americans with Disabilities Act upgrades, fire suppression system upgrades to both the Police Department server room and City Hall server room, heating, ventilating and air conditioning upgrades to the Police Department sever room, and waterproofing; and WHEREAS, during the design phase, a waterproofing specialist was hired to analyze the waterproofing requirements for the Property and Evidence room, as well as analyze the remainder of the Police Department building; and WHEREAS, given the extensive nature of the "building -wide" analysis, only the recommendations associated with the Property and Evidence room were included in the original contract, which included waterproofing specific walls, ceilings, cracks, and the planters directly associated with water intrusion issues for the basement; and WHEREAS, after contract award, staff continued working with the waterproofing specialist to complete the analysis for the entire building perimeter where soil is in contact with walls, the remaining planters surrounding the building, and the two pedestrian decks on the second floor; and WHEREAS, the project is currently on schedule with construction completion estimated for the end of June 2016; and WHEREAS, six change orders totaling $46,432.71 have been processed, which is approximately 6% of the contract amount; and WHEREAS, Kinsman Construction, Inc., has provided a change order proposal in the not to exceed amount of $127,007, exceeding the original 25% contingency of $192,115.75.15 to procure and install the waterproofing improvements for the remaining high priority areas of the building per the waterproofing analysis. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of National City hereby approves an increase to the contract with Kinsman Construction, Inc., in a not to exceed amount of $127,007.15. Resolution No. 2016 — 59 Page Two BE IT FURTHER RESOLVED that the Mayor is authorized to execute Change Order No. 7 in the amount of $127,007.15 to provide waterproofing around the entire ground floor perimeter of the police department building, planter boxes, and two pedestrian decks on the second floor. PASSED and ADOPTED this 3rd day of May, 2016. Ron Morrison, Mayor ATTEST: Micha R. Dalla, ity Jerk Passed and adopted by the Council of the City of National City, California, on May 3, 2016 by the following vote, to -wit: Ayes: Councilmembers Cano, Mendivil, Morrison, Rios, Sotelo-Solis. Nays: None. Absent: None. Abstain: None. AUTHENTICATED BY: RON MORRISON Mayor of the City of National City, California /1 City Clerk of the City of N tional City, California By: Deputy I HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of RESOLUTION NO. 2016-59 of the City of National City, California, passed and adopted by the Council of said City on May 3, 2016. City Clerk of the City of National City, California By: Deputy