Loading...
HomeMy WebLinkAboutCC RESO 2016-124RESOLUTION NO. 2016 — 124 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY AWARDING A CONTRACT TO PORTILLO CONCRETE, INC., IN THE NOT TO EXCEED AMOUNT OF $2,496,925 FOR THE SEWER LINE REPLACEMENT AND UPSIZING PROJECT, AUTHORIZING A 15% CONTINGENCY IN THE AMOUNT OF $374,538.75 FOR ANY UNFORESEEN CHANGES, AUTHORIZING THE MAYOR TO EXECUTE THE CONTRACT, AND AUTHORIZING THE APPROPRIATION OF $1,500,000 TO THE SEWER UPSIZING CIP ACCOUNT FROM SEWER SERVICE FUND BALANCE WHEREAS, the Sewer Line Replacement and Upsizing Project represents the first phase of improvements to increase capacity and efficiency of the sewer collection system citywide and includes replacement of 21-inch, 12-inch, and 8-inch diameter PVC sewer main, manholes, sewer laterals; cold -mill grind and overlay of existing road section for Plaza Boulevard, as well as National City Boulevard from and including the intersection of Mile of Cars Way through the intersection of 22"d Street; installation of curb and gutter, AC dikes, AC driveways entrances and driveways; sidewalks, pedestrian curb ramps for ADA compliance, signing and striping, and other related improvements; and WHEREAS, on July 13, 2016, the Engineering Department publicly opened, examined, and declared four (4) sealed bids for the Sewer Line Replacement and Upsizing Project; and WHEREAS, Portillo Concrete, Inc., was the lowest responsive, responsible bidder qualified to perform the work as described in the project specifications with a total bid amount of $2,496,925; and WHEREAS, a 15% contingency amount up to $374,538.75 for any unforeseen changes to the Project is requested. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of National City hereby awards the contract for the Sewer Line Replacement and Upsizing Project to the lowest responsive, responsible bidder, to wit: PORTILLO CONCRETE, INC. BE IT FURTHER RESOLVED by the City Council that the Mayor is hereby authorized to execute on behalf of the City a contract in the amount of $2,496,925 with Portillo Concrete, Inc., for the Sewer Line Replacement and Upsizing Project. Said contract is on file in the office of the City Clerk. BE IT FURTHER RESOLVED that the City Council hereby authorizes a 15% contingency amount up to $374,538.75 for any unforeseen changes to the Project. BE IT FURTHER RESOLVED that the City Council hereby authorizes an appropriation of $1,500,000 to the Sewer Upsizing CUP Account from the Sewer Service Fund balance. [Signature Page to Follow] Resolution No. 2016 — 124 Page Two ATTEST: PASSED and ADOPTED this 16th day of August, . on orrison, Mayor Michael R. Dalla, City Clerk PROVED TO FORM: audia Gaci : Silva City Attorn-y Passed and adopted by the Council of the City of National City, California, on August 16, 2016 by the following vote, to -wit: Ayes: Councilmembers Cano, Mendivil, Morrison, Rios, Sotelo-Solis. Nays: None. Absent: None. Abstain: None. AUTHENTICATED BY: RON MORRISON Mayor of the City of National City, California City Clerk of the City o National City, California By: Deputy I HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of RESOLUTION NO. 2016-124 of the City of National City, California, passed and adopted by the Council of said City on August 16, 2016. City Clerk of the City of National City, California By: Deputy