HomeMy WebLinkAboutCC RESO 2018-102RESOLUTION NO. 2018 —102
RESOLUTION OF THE CITY QOUNCIL OF THE .CITY OF .NATIONALCITY
AUTHORIZING THE ESTABLISHMENT OF AN 'ENGINEERING GRANTS
FUND APPROPRIATION IN THE:AMPUNT.OF. $501000 AND
A CORRESPOND1NG REVENUS!BUDGET.TO.COMPLETE THE 'RIGHT
OF WAY PHASE OF THE SWEEIWATERRIVER. BIKEWAY PROJECT'
WHEREAS, on.October 22, 2015, the. California IDepartment of transportaUon
(Caltrans) awarded the City of National City a $1,129,000 Active Transportation Program (ATP)
grant for the Sweetwater RiverBikeway .Project (the "Project"), which does not have a local
match requirement; and
WHER. .A....:ilhe:Pripipct.W.111 fill aly$teini gap in NationAtQity't local bicycle
network by conneottrig bloyole f00.1fies along 30h4treet, east of Avenue, to .one of the
Sweetwater River BikeWayls. primary access pciOs!..0.1.:Notth 21'd Avenue; and
WHEREAS, the Project will provide nearly one mile of new Class II and Class 111
bicycle facilities consistent with. the -Citys Bicycle. Master Plan and the SANPAQ ,Regional Bike
Plan, andinbludO-soch-Oprovehlients as. bicypledeteptor loops, three bicycle'Oxes, gateway
enhancements at. both entrances to the Sweetwater River Bikpway, enhancements at the two
gotewaypcontiptirig!-pf.00w sign.age; fencing, landscaping,and asphalt-concrete:vprlay along
the existing segments that connect the roadway to the bikeway; and
WHER :On February 21, 2017, the City Council adopted Rosolptfon No.
2017q.19, authorizing theMayor to exec*. Program Supplement Agreement NO. P.0..30*.th.
Caltrans for the Sweetwater River Bikeway Project to allow for reimbursement of 4licAle-Opieet
expenditures through the: tate ATP, and authorized the establishment of an Engineering..
Grants Fund appropriation of :$4000 and corresponding revenue budget to.:011bw star to
proceed with the ProjeaApprovaliEnvironmental Document (PMED) phase of t. Project; and
WHEFpN October V7, 2017, the City Council adopted. Roo tlitiOn NO. 2017
195, authorizing the 00...blis141:met'it of an Engineering Grants Fund appropriation :•of:$.1-65000
ancrcorrespon.ding. revenue budget to allow staff to proceed with the .Preliminary Engineering
phase of the Project; a.nd
WHEREAS, an Engineering Grants Fund appropriation of $50,000 and
corresponding revenue budget is necessary to allow staff to proceed with the Right of Way
phase of the Project, which will be reimbursed by the State ATP grant.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of
National City hereby authorizes the establishment of an Engineering Grants Fund appropriation
and a corresponding revenue budget in the amount of $50,000 to complete the right of way
phase of the Sweetwater River Bikeway Project, which will be reimbursed by the State ATP
grant.
[Signature Page to Follow]
Resolution No. 2018 — 102
Page TWO
PASSED AND ADOPTED this 19th day o
Morrison, Mayor
ATTEST:
Mk ael R, Doh, y Clerk
Passed and adopted by the Council of the City of National City, California, on
June 19, 2018 by the followIng vote/ to -wit:
Ayes: Councilmembers Cano, Me.:ndjv:ii Morrison, Rios, Sotelo-Sol[s.
Nays: None,
Absent: Nonei.
Abstain: None,
AUTHENTICATED BY: „„,, ..SON MORRISON
Mayor of the city of National City, California
•By:
City Clerk of the City of National. City, California
eputy
I EREBY CERTIFY that the above and foregoing is a full, true and correct copy of
RESOLUTION NO. 2018-102 of the City Of National City, California/ passed and
adopted by the Council of said City on June 19/ 2018,
By:
City Clerk of the. City of Nationa California
Deputy