HomeMy WebLinkAboutCC RESO 2020-97RESOLUTION NO. 2020 — 97 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY, 1) AWARDING A CONTRACT TO BASILE CONSTRUCTION, INC. IN THE AMOUNT OF $1,394,292 FOR THE P-1 SEWER UPSIZE PROJECT FOR SWEETWATER HIGH SCHOOL, CIP NO. 19-43; 2) AUTHORIZING A 15% CONTINGENCY IN THE AMOUNT OF $209,143.80 FOR ANY UNFORESEEN CHANGES; AND 3) AUTHORIZING THE MAYOR TO EXECUTE THE CONTRACT WHEREAS, the P-1 Sewer Upsize Project includes open trench construction to remove and replace approximately 1490 linear feet of 8 inch diameter vitrified clay pipe (VCP) with 12 inch diameter PVC sewer main, manholes, laterals including pavement restoration, and placing a new sewer access road near the 2800 Block of "D" Avenue, just west of "D" Avenue; and WHEREAS, the work commences approximately 750 feet west of "D" Avenue and proceeds east for approximately 1500 feet through Sweetwater High School property and ends at "F" Avenue; and WHEREAS, on April 6, 2020, the bid solicitation was posted on PlanetBids, a free public electronic bidding system for contractors and advertised in local newspapers on April 8, 2020 and April 10, 2020; and WHEREAS, on May 1, 2020, three (3) bids were received electronically by the Engineering Department for the P-1 Sewer Upsize Project; and WHEREAS, HPS Mechanical, Inc. was the apparent lowest bidder, however, upon review of all submitted documents, HPS Mechanical, Inc. was deemed "non -responsive" due to bid irregularities; and WHEREAS, City Staff recommends awarding the contract to Basile Construction, Inc. who is the lowest bidder qualified to perform the work as described in the project specifications with a total bid amount of $1,394,292; and WHEREAS, a 15% contingency amount up to $209,143.80 for any unforeseen changes to the Project is requested. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of National City hereby awards the contract for the P-1 Sewer Upsize Project for Sweetwater High School, CIP No. 19-43, to the lowest responsive, responsible bidder, to wit: BASILE CONSTRUCTION, INC. BE IT FURTHER RESOLVED by the City Council of the City of National City that the Mayor is hereby authorized to execute on behalf of the City a contract in the amount of $1,394,292 with Basile Construction, Inc. for the P-1 Sewer Upsize Project for Sweetwater High School. Said contract is on file in the Office of the City Clerk. 111 //1 111 Resolution No. 2020 — 97 Page Two BE IT FURTHER RESOLVED that the City Council authorizes a 15% contingency in the amount of up to $209,143.80 for any unforeseen changes. PASSED and ADOPTED this 2nd day of June, 2020 Alejandra Sotelo-Solis, Mayor ATTEST: rat Michael R. Da a, City Clerk APPROVED AS TO FORM: Passed and adopted by the Council of the City of National City, California, on June 2, 2020 by the following vote, to -wit: Ayes: Councilmembers Cano, Morrison, Quintero, Rios, Sotelo-Solis. Nays: None. Absent: None. Abstain: None. AUTHENTICATED BY: ALEJANDRA SOTELO-SOLIS By: Mayor of the City of National City, California City Clerk of the City of National City, California %-atal puty I HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of RESOLUTION NO. 2020-97 of the City of National City, California, passed and adopted by the Council of said City on June 2, 2020. City Clerk of the City of National City, California By: Deputy