HomeMy WebLinkAboutCC RESO 2020-133RESOLUTION NO. 2020 — 133 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY, 1) AWARDING A CONTRACT TO SELECT ELECTRIC, INC. IN THE AMOUNT OF $367,994.00 FOR THE FIBER OPTIC TRAFFIC SIGNAL INTERCONNECT EXPANSION, PHASE II PROJECT, CIP NO. 19-08; 2) AUTHORIZING A 15% CONTINGENCY IN THE AMOUNT OF $55,199.10 FOR ANY UNFORESEEN CHANGES; AND 3) AUTHORIZING THE MAYOR TO EXECUTE THE CONTRACT WHEREAS, on November 3, 2015, the California Department of Transportation ("Caltrans") awarded a $455,100 Highway Safety Improvement Program ("HSIP")grant for the Fiber Optic Traffic Signal Interconnect Expansion, Phase II Project; and WHEREAS, on September 13, 2019, Caltrans authorized the City of National City ("City") to proceed with the construction phase in the amount of $455,100 with a $30,170 local match requirement, that is available through prior City Council local TransNet appropriations for FY 2020 Traffic Signal Upgrades GIP; and WHEREAS, City Staff will satisfy the match requirement by paying for the construction management services; and WHEREAS, the project generally consists of installing a fiber optic traffic signal interconnect system along the 8th Street, 18th Street, Division Street, Euclid Avenue, Mile of Cars Way, Palm Avenue and Plaza Boulevard corridors; and WHEREAS, Equipment upgrades include a combination of new switches, fiber distribution units, network cables, fiber patch cords, traffic controllers, battery backup systems, conflict monitors, power strips, single mode fiber optic cable, and fiber splice enclosures; and WHEREAS, on June 26, 2020, the bid solicitation was posted on PlanetBids, a free public electronic bidding system for contractors and on June 30, 2020 and July 6, 2020, the bid solicitation was advertised in local newspapers; and WHEREAS, on July 21, 2020, eight (8) bids were received electronically by the Engineering Department for the Fiber Optic Traffic Signal Interconnect Expansion, Phase II Project, CIP No. 19-08; and WHEREAS, Select Electric, Inc. was the apparent lowest bidder with a total bid amount of $367,994; and WHEREAS, a 15% contingency amount of $55,199.10 for any unforeseen changes to the Project is recommended by City Staff. Resolution No. 2020 — 133 Page Two NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of National City hereby awards the contract for the Fiber Optic Traffic Signal Interconnect Expansion, Phase II Project, CIP No. 19-08, to the lowest responsive, responsible bidder, to wit: SELECT ELECTRIC, INC BE IT FURTHER RESOLVED by the City Council of the City of National City that the Mayor is hereby authorized to execute on behalf of the City a contract in the not -to - exceed amount of $367,994 with Select Electric Inc. for the Pedestrian ADA Improvements Project. Said contract is on file in the office of the City Clerk. BE IT FURTHER RESOLVED that the City Council of the City of National City authorizes a 15% contingency in the amount of $55,199 for any unforeseen changes, which will be funded by two accounts, first from the grant funds in the amount of $27,106, and the remaining sum of the contingency shall be paid from the City's local match fund in the amount of $28,093.10. PASSED and ADOPTED this 4th day of August, 2020 Alejandra Sotrslo-Solis, Mayor ATTEST: /i. Michael R. Della, ity Clerk APPROVED AS TO FORM: Passed and adopted by the Council of the City of National City, California, on August 4, 2017 by the following vote, to -wit: Ayes: Councilmembers Cano, Morrison, Quintero, Rios, Sotelo-Solis. Nays: None. Absent: None. Abstain: None. AUTHENTICATED BY: ALEJANDRA SOTELO-SOLIS Mayor of the City of National City, California qtaletrk of the o Ci City National City, California By: Deputy I HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of RESOLUTION NO. 2020-133 of the City of National City, California, passed and adopted by the Council of said City on August 4, 2020. City Clerk of the City of National City, California By: Deputy