Loading...
HomeMy WebLinkAboutCC RESO 2020-202RESOLUTION NO. 2020 - 202 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY AUTHORIZING THE INCREASE TO THE CONTRACT WITH BASILE CONSTRUCTION, INC., IN THE NOT -TO -EXCEED AMOUNT OF $215,987.03 FOR THE P-1 SEWER UPSIZE PROJECT, CIP NO. 19-43, TO COMPLETE THEREMOVAL AND REPLACEMENT OF THE SEWER MAIN LINE WHEREAS, on June 2, 2020, City Council adopted Resolution No. 2020-97 awarding a contract in the amount of $1,394,292 to Basile Construction, Inc. for the P-1 Sewer Upsize Project, CIP No. 19-43; and WHEREAS, City of National City staff have executed twelve (12) change orders totaling $425,130.83, which is approximately 30% of the contract amount, to address unforeseen conditions associated with existing underground utilities; and WHEREAS, the sewer main alignment identified in the plans required modification to include additional exploratory potholing to locate the existing pipe, open trenching, removing an existing 60-inch storm drain pipe, installing the new sewer main line, and re -installing the 60-inch storm drain pipe; and WHEREAS, in order to complete the reestablishment of existing sewer laterals connected to the sewer main line and the excavation of jacking and receiving pits, City of National City staff is requesting City Council's approval for an increase to the contract with Basile Construction, Inc. in the not -to -exceed amount of $215,987.03, above and beyond the original 15% contingency of $209,143.80. NOW THEREFORE, BE IT RESOLVED by the City Council of the City of National City hereby authorizes the increase to the contract with Basile Construction, Inc., in the not -to - exceed amount of $215,987.03 for the P-1 Sewer Upsize Project, CIP No. 19-43, to complete the removal and replacement of the sewer main line. PASSED and ADOPTED this 17th day of November, 2020. A ejandra Sote o-So is, Mayor ATTEST: Micha °I R. Dal "a, C i Clerk APPROVED AS TO FORM: C Charles E. Bell Jr., City At Passed and adopted by the Council of the City of National City, California, on November 17, 2020 by the following vote, to -wit: Ayes: Councilmembers Cano, Morrison, Quintero, Rios, Sotelo-Solis. Nays: None. Absent: None. Abstain: None. AUTHENTICATED BY: ALEJANDRA SOTELO-SOLIS Mayor of the City of National City, California 1 f City CI rk of the City of ational City, California By: Deputy I HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of RESOLUTION NO. 2020-202 of the City of National City, California, passed and adopted by the Council of said City on November 17, 2020. City Clerk of the City of National City, California By: Deputy