Loading...
HomeMy WebLinkAboutCC RESO 2021-174RESOLUTION NO. 2021 - 174 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY, CALIFORNIA 1) AWARDING AND AUTHORIZING THE MAYOR TO EXECUTE THE CONTRACT TO CREST EQUIPMENT INC. IN THE NOT -TO -EXCEED AMOUNT OF $1,281,798.37 FOR THE EL TOYON LAS PALMAS BICYCLE CORRIDOR PROJECT, CIP NO. 19-02; 2) AUTHORIZING A 15% CONTINGENCY FOR $192,269.76 FOR ANY UNFORESEEN CHANGES WHEREAS, the for the El Toyon-Las Palmas Bicycle Corridor Project ("Project') includes the construction of a new bicycle corridor parallel to the east side of 1-805 connecting El Toyon Park and Las Palmas Park; and WHEREAS, improvements along the bicycle corridor will include Class II and III bike route pavement markings (sharrows) and signage; pedestrian curb ramps for ADA compliance; traffic calming measures such as pedestrian refuge islands, corner bulb -outs, and pedestrian actuated flashing crosswalk signs; and stormwater treatment infiltration areas; and WHEREAS, on September 30, 2021, the City of National City ("City") posted the bid solicitation on PlanetBids, a free public electronic bidding system for contractors, and on October 5, 2021, and October 12, 2021, the City advertised in local newspapers; and WHEREAS, on October 22, 2021, the City received eight (8) bids by the 1:00 p.m. deadline for the Project; and WHEREAS, Crest Equipment Inc. was the lowest responsive bidder with a total bid amount of $1,281,798.37; and WHEREAS, upon review of all documents submitted, City staff determined Crest Equipment Inc. is the lowest responsive bidder qualified to perform the work as described in the Project specifications; and WHEREAS, City staff recommends awarding a contract to Crest Equipment Inc. in the not -to -exceed amount of $1,281,798.37; and WHEREAS, City staff requests City Council authorize the Mayor to execute the contract with Crest Equipment Inc. for the Project; and WHEREAS, City staff further requests City Council authorize a 15% contingency amount up to $192,269.76 for any unforeseen conditions that may arise during the Project. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF NATIONAL CITY, CALIFORNIA, DOES RESOLVE, DECLARE, DETERMINE, AND ORDER AS FOLLOWS: Section 1: Awards the El Toyon Las Palmas Bicycle Corridor Project, CIP No. 19- 02, to the lowest responsive, responsible bidder, to wit: CREST EQUIPMENT INC. Section 2: Authorizes the Mayor to execute a contract with Crest Equipment Inc. for $1,281,798.37 for the El Toyon Las Palmas Bicycle Corridor Project, CIP No. 19-02. Resolution No. 2021 —174 Page Two Section 3: Authorizes a 15% contingency in the amount of up to $$192,269.76 for any unforeseen changes. Section 4: The City Clerk shall certify the passage and adoption of this Resolution and enter it into the book of original Resolutions. PASSED and ADOPTED this 16th day of November, 20 1. 01 ATTEST: Luz Molina,ity Clerk APPROVED AS TO FORM: Charles E. Bell Jr. 41. Attorney Alejandra Sotelo-Solis, Mayor Passed and adopted by the City Council of the City of National City, California, on November 16, 2021, by the following vote, to -wit: Ayes: Sotelo-Solis, Rodriguez, Morrison, Rios. Nays: None. Absent: Bush Abstain: None. AUTHENTICATED BY: ALEJANDRA SOTELO-SOLIS Mayor of the City of National City, California BY: City Clerk of the gy. ty of Natio City, iforn l Shelley Chapel, M Deputy ity Clerk