HomeMy WebLinkAboutCC RESO 2022-124RESOLUTION NO. 2022 124
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY,
CALIFORNIA AUTHORIZING THE MAYOR TO 1) EXECUTE THE STATE -AID
MASTER AGREEMENT; AND 2) EXECUTE PROGRAM SUPPLEMENT AGREEMENT
(PSA) NO. Z44 WITH THE STATE OF CALIFORNIA DEPARTMENT OF
TRANSPORTATION (CALTRANS) FOR THE PEDESTRIAN SAFETY
ENHANCEMENTS PROJECT TO ALLOW FOR REIMBURSEMENT OF UP TO $60,000
IN ELIGIBLE PROJECT EXPENDITURES THROUGH THE HIGHWAY SAFETY
IMPROVEMENT PROGRAM (HSIP); AND 3) AUTHORIZING THE ESTABLISHMENT
OF AN ENGINEERING GRANTS FUND APPROPRIATION OF $60,000 AND
CORRESPONDING REVENUE BUDGET
WHEREAS, on March 30, 2021, the California Department of Transportation
("Caltrans")awarded a $427,500Highway Safety Impr m nt Program `HSIP" grant t the
City f National City "City"for the Pedestrian Safety Enhancements Project "Project').
There is no local match requirement; and
WHEREAS, the $427,500 award was distributed by Project phases as follows: Project
Approval and Environmental Documents "PA ED" - $10,000; Plans, Specifications and
Estimate ("PS&E") $50,000; Construction ("CON") - $367500; and
WHEREAS, the Project will install pedestrian countdown signal heads, advance stop
bar before crosswalks ("Bicycle Box"), and modify signal phasing to implement a Leading
Pedestrian Interval ("LPI") at eight signalized intersections: Harbison Ave & E. Plaza Blvd;
Harbison Ave & E. 8th St.; E Plaza Blvd & Highland Ave; Highland Ave & E. 8th St.; Highland
Ave & E. 21st St.; Highland Ave & E. 18th St.; National City Blvd & E 8th St.; Highland Ave
E3 th St; and
WHEREAS, this project was identified through the review of two previously completed
safety planning projects: The City of National City INTRAConnect Plan which was funded by
a Caltrans Sustainable Transportation Planning Grant in 2018; and National City Systematic
Safety Analysis Report Program "SSARP" which was funded by a Caltrans HSI P grant and
used data collected from the Statewide Integrated Traffic Records System ("SWITRS") for
the most recent and complete 5-year period, January I , 2013-December 31, 2017, , as part of
a SSARP grant; and
WHEREAS, the eight intersections were selected for this HSIP project from the
City of National City INTRAConnect t Plan and City of National City's SSARP that showed
either a significant volume or severity of crashes; and
WHEREAS, once the PA&ED and PS&E phases are complete, staff will return to the
City Council for the appropriation of the Construction fund.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF NATIONAL CITY,
CALIFORNIA, NIA, DOES RESOLVE, DECLARE, E, DETERMINE, AND ORDER AS FOLLOWS:
Resolution No.
Page Two
2022
—114
Section 1: That the City Council hereby authorizes the Mayor to execute the State -
Aid Master Agreement and Program Supplement Agreement No. Z44 to allow the City to
receive reimbursement of eligible project expenditures through the H1P grant.
Section 2: The City Clerk shall certify the passage and adoption of this Resolution
and enter it into the book of original Resolution.
PASSED
and ADOPTED this 2nd day of August
Ale }andra '' t=Soli Mayor
ATTEST:
Lu Molina,
City Y
APPROVED AS TO FORM:
L)
BarryGl ��h Itz, Interim Attorney
Passed and adopted by the City Council of the City of National City, California, on
August 2, 2022 by the following vote, to -wit:
Ayes: sotelo-Solis, Bush, Morrison, Rios, Rodriguez
Nays: None.
Absent: None.
Abstain: None.
AUTHENTICATED BY: ALFJANDRA SOTELO-SOLIS
BY
Vayor of the City of National City, California
Luz Molina
City Clerk of the City of National City. California
r,
Shelley Chape
1)1 Cik
MVI��, Deputy Clerk