Loading...
HomeMy WebLinkAboutCC RESO 2023-52RESOLUTION NO. 2023 - 52 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY, CALIFORNIA, 1) APPROVING THE FOLLOWING PROJECTS PROPOSED TO RECEIVE FUNDING FROM THE ROAD MAINTENANCE AND REHABILITATION ACCOUNT (RMRA) THROUGH THE LOCAL STREETS AND ROADS FUNDING PROGRAM AS REQUIRED BY SENATE BILL 1, THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017: A) FY 2024 PAVEMENT REHABILITATION, B) CENTRAL COMMUNITY MOBILITY ENHANCEMENTS, AND C) FY 2024 PAVEMENT SLURRY SEAL; AND 2) AUTHORIZING THE ESTABLISHMENT OF A GAS TAX FUND APPROPRIATION OF $1,519,578 FOR FISCAL YEAR 2024 AND CORRESPONDING REVENUE BUDGET FOR RECEIPT OF RMRA FUNDS. WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017) was passed by the Legislature and Signed into law by the Governor in April 2017 to address the significant multi -modal transportation funding shortfalls statewide; and WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the residents of our City are aware of the projects proposed for funding in our community and which projects have been completed each fiscal year; and WHEREAS, the City must adopt by resolution a list of projects proposed to receive fiscal year funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, which must include a description and the location of each proposed project, a proposed schedule for the project's completion, and the estimated useful life of the improvement; and WHEREAS, the City, will receive an estimated $1,519,578 in RMRA funds for FY 2024 from SB 1; and WHEREAS, this is the 7th year in which the City is receiving SB 1 funding and will enable the City to continue essential road maintenance and rehabilitation projects, safety improvements, repairing and replacing aging bridges, and increasing access and mobility options for the traveling public that would not have otherwise been possible without SB I ; and WHEREAS, the City prioritizes projects based on health and safety benefits, input from the community, project costs, schedule and available funding, and consistency with long-range planning documents and policies; and WHEREAS, the list of projects proposed to receive funding from the RMRA were developed based on this criteria to ensure revenues are being used on high -priority and cost- effective projects that meet the community's priorities for transportation investment; and WHEREAS, revenues received from the RMRA will greatly assist the City in increasing the overall quality and sustainability of our transportation system for the benefit of the public; and WHEREAS, the funding from SB 1 will help the City maintain and rehabilitate I mile of streets, throughout the City this year and a number of similar projects into the future; and WHEREAS, the 2018 California Statewide Local Streets and Roads Needs Assessment found that the City's streets and roads are in an "at -risk" condition and this revenue will help us increase the overall quality of our road system and over the next decade will bring our streets and roads into a "good" condition; and WHEREAS, the SB 1 project list and overall investment in our local streets and roads infrastructure with a focus on basic maintenance and safety, investing in complete streets infrastructure, and using cutting -edge technology, materials and practices, will have significant positive co -benefits statewide. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF NATIONAL CITY, CALIFORNIA, DOES RESOLVE, DECLARE, DETERMINE, AND ORDER AS FOLLOWS: Section 1: That the City Council hereby authorizes, as required by SB 1, the following list of projects proposed to receive funding from the RMRA in fiscal year 2024: 1) FY 2024 Pavement Rehabilitation - Locations per the Citywide Pavement Condition Assessment — perform pavement rehabilitation with mill and overlay as well as ADA improvements and miscellaneous concrete repair associated with this work on 4'f' Street between Highland Avenue to easterly city boundary, L Avenue between 16th Street to 30th Street, Olive Avenue between 8th Street to Plaza Boulevard, I Avenue between 18th Street to 23rd Street, 24th Street between National City Boulevard to the 1500 block of 24th Street (estimated construction completion by June 2024 with useful life of 10 to 15 years); and 2) Central _Community Mobili Enhancements — project limits are "M" Avenue between E. 4th Street and E. 8th Street, 8th Street between "M" Avenue and "N" Avenue, "N" Avenue between E. 8th Street and E. 16th Street, "L" Avenue between E. 16th Street and 30th Street. The project will include: 1) installation of new northbound and southbound bicycle corridor and will install new striping, signing, pedestrian barricade and some curb ramps along the corridor 2) reconstruction of a road gap on "N" Avenue between Plaza Blvd and E. 9th Street 3) installation of slurry seal and mill and overlay and pavement rehabilitations along the corridor (estimated construction completion by October 2024 with useful life of 10 to 15 years); and 3) FY 2024 Pavement Slurry Seal —resurface residential streets with a Type II slurry seal to protect the existing pavement and provide smooth surface for bicyclists. Street to be to be resurfaced include Stockman St. from Alston Ave. to Cagle St., Cagle St. from Alston Ave. to Plaza Bonita Center Way, 3700 BLK Lynda PL. S/O Cagle St., 3700 BLK Kellie Ct. S/O Cagle St., 3000 61k. Cagle St. NW/O Stockman St., 3200/3300 Blk. of Newberry St. W/O Alston Ave., Calmoor St, S/O Sweetwater Rd., Van Ness Ave. from 20TH St. to Leonard St., Granger Ave. from 20th St. to 24th St., 20th St. from Granger Ave. to concrete street W/O Rachael Ave., 19th St. from Granger Ave. to 132' W/O Rachael Ave., 18TH St. from Granger Ave. to Rachael Ave., La Siesta Way from 18th St. to 24th St., Valle Vista Ave. S/O 20th St., Valle Vista Ave. N/0 20th St., Orange Ave. from 18th St. to 20th St, Prospect St. from 18th St. to 20th St., Newell St. from 18th St. to 24th St., 22nd St. from Palm Ave. to N Ave., N Ave. from 18th St. to Roselawn St., K Ave. from 18th St. to 24th St., 28th St. from Highland Ave. to L Ave., 2400 & 2500 BLK. of I Ave. N o 26th St, A Ave. from 12th St. to NCB, Civic Center Dr. from Wilson Ave. to NCB, Hoover Ave. from Plaza Blvd. to 18th St., 12th St. from Roosevelt Ave. west to Cul-De--Sac, 15th St. from Roosevelt Ave. to Wilson Ave., 17th St. from NCB to B Ave., B Ave. from 16th St. to 18th St., 6th St. from NCB to Highland Ave., 5th St. from NCB to Highland Ave., 3rd St. from NCB to Highland Ave., 4th St. from NCB to D Ave. B Ave from 1st St. to 7th St., F Ave. from 1st St. to 8th St., 1st St. from NCB to F Ave., E Ave. from 2nd St to 8th St. (estimated construction completion by June o 4 with useful life of 7 years). Section 2: That the City Council hereby authorizes a Gas Tax Fund appropriation of $1,519,578 for fiscal year 2024 with a corresponding revenue budget. Section 3: That the City Clerk shall certify to the passage and adoption of this Resolution and enter it into the book of original Resolutions. PASSED and ADOPTED this 16th day of May, 2023. on orrison, Mayor ATTEST: Shelley Chape!, City Clerk APPROVED AS TO FORM: r-- Barry J.tz, City Attorney Passed and adopted by the City Council of the City of National City, California, on May 16, 2023 by the following vote, to -wit: Ayes: Bush, Rodriguez, Yarnane, Molina, Morrison Nays: None. Absent: None. Abstain: None. AUTHENTICATED BY: Ron Morrison. BY: Mayor of the City of National City, California City Clerk of thity of Nat nal City, California sl�l�lyChape MC, City C erk